COMPANY RECORD · CHICAGO, IL

Zeitz Mechanical Inc — permit history in Chicago, IL

Zeitz Mechanical Inc appears on 43 Chicago permit records from 2021 through 2026, all of them plumbing.

Permit categories

CategoryPermitsShare
Plumbing43100%

Activity by year

YearPermits issued
20216
202219
20238
20242
20251
20267

Busiest year on record: 2022, with 19 permits. One project can account for several filings, so read this as filing activity rather than workload.

Named on the same permit

Name in sourceLinked permitsLast seen
Pmj Enterprises, Inc.462024-06-20
K.R. Miller Contractors, Inc.42026-04-27
Agae Contractors, Inc.22026-03-31
Kedmont Waterproofing Co., Inc.22026-03-25
Mbb Enterprises Of Chicago Inc22026-03-25
Rv Bulders Corp22026-03-31
B.E.T.O.N. Construction Co.12026-05-14
Friedler Construction Company12026-05-14
L&R Labor, LLC DBA Exmoor Construction12022-02-15
Path Construction Company, Inc12026-03-11
Rasco Mason Contractors, Inc.12026-04-27

11 companies are named alongside Zeitz Mechanical Inc on the same Chicago permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
1734 N ORLEANS ST2026-05-14
5300 S HERMITAGE AVE2026-04-27
1423 W BRYN MAWR AVE2026-03-31
3616 W ARMITAGE AVE2026-03-25
2625 N ORCHARD ST2026-03-20
917 W 88TH ST2026-03-11
1841 N SPRINGFIELD AVE2026-02-17
1628 W WASHINGTON BLVD2025-05-09
9025 S THROOP ST2024-06-20
1746 S MILLER ST2024-04-18
9744 S MORGAN ST2023-05-15
630 E 131ST ST2023-05-11
6006 S PEORIA ST2023-05-11
3400 W 65TH ST2023-04-28

41 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1 to $4,654,000, median $394,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

43 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
1010790622026-05-14Plumbing1734 N ORLEANS STSELF-CERT 2019 CBRC: REPLACEMENT OF HVAC SYSTEM AND STEAM BOILERS, PATCHING OF WALLS, FLOORS, CEILING AFFECTED BY MEP WORK$4,654,000
1010801182026-04-27Plumbing5300 S HERMITAGE AVESELF-CERT 2019 CBRC: CHICAGO PUBLIC SCHOOL FACILITY. NO CHANGE IN USE. LOCALIZED TOILET ROOM REPAIRS AND MODIFICATIONS. INTERIOR LIFT INSTALLATION. LOCALIZED EXTERIOR PAVING REPAIR$807,370
1010787562026-03-31Plumbing1423 W BRYN MAWR AVEOCCUPANCY IS EXISTING ELEMENTARY SCHOOL E-1. REMODELING OF TWO EXISTING MULTI-SEAT TOILET ROOMS AND ONE SINGLE-SEAT TOILET ROOM.$575,000
1010787542026-03-25Plumbing3616 W ARMITAGE AVESC 2019 CBC: FULL BUILDING PERMIT FOR A FULL ROOF REPLACEMENT FOR A 4-STORY 76,262SF ELEMENTARY SCHOOL BUILDING. (OCCUPANCY GROUP E-1; TYPE IIIB CONSTRUCTION)$1,825,000
1010787552026-03-20Plumbing2625 N ORCHARD STOCCUPANCY: EXISTING ELEMENTARY SCHOOL E-1. REMODELING OF TWO EXISTING MULT-SEAT TOILET ROOMS AND ONE SINGLE SEAT TOILET ROOM.$575,000
1010784532026-03-11Plumbing917 W 88TH STSC 2019 CBC THIRD FLOOR BATHROOM RENOVATIONS TO THE THIRD FLOOR WHICH INCLUDES MEP WORK AND ROOF REPLACEMENT AND MINOR FACADE REPAIR WORK TO A 3 STORY CPS BUILDING, AS PER ARCHITEC$2,200,000
1010787322026-02-17Plumbing1841 N SPRINGFIELD AVESC 2019 CBRC: FULL ROOF REPLACEMENT FOR A 3-STORY, 83,071 SF ELEMENTARY SCHOOL. (OCCUPANCY GROUP E-1; TYPE IIA CONSTRUCTION)$2,940,000
1010677982025-05-09Plumbing1628 W WASHINGTON BLVDSELF-CERT 2019 CBRC: CHICAGO PUBLIC SCHOOL FACILITY. NO CHANGE IN USE. OFFICE AREA RENOVATION. NEW FINISHES.$2,500,000
1010142712024-06-20Plumbing9025 S THROOP STSELF-CERT 2019 CBRC: CPS SCHOOL FORT DEARBORN ELEMENTARY SCHOOL EXISTING 2-STORY BUILDING INTERIOR REMODEL OF EXISTING WASHROOMS, NEW PLUMBING FIXTURES TO REPLACE EXISTING FIXTURES$700,000
1010407492024-04-18Plumbing1746 S MILLER STSELF-CERT: CPS - NO CHANGE IN USE. PROVIDE ACCESSIBLE PATH FROM CITY SIDEWALK TO EXISTING BACK DOOR NUMBER 9. NEW CONCRETE FLATWORK BETWEEN AUDITORIUM ADDITION AND ORIGINAL BUILDI$340,000
1010147132023-05-15Plumbing9744 S MORGAN STSELF CERT 2019 CBRC CPS SCHOOL "CHARLES WACKER ELEMENTARY SCHOOL" EXISTING 2-STORY BUILDING INTERIOR REMODEL TO UPGRADE EXISTING WASHROOM AND DRINKING FOUNTAIN IN CONFORMANCE WITH $183,000
1010142692023-05-11Plumbing630 E 131ST STSELF CERT 2019 CBRC CPS SCHOOL NO CHANGE IN USE. IRA ALDRIDGE ELEMENTARY SCHOOL EXISTING 2-STORY BUILDING INTERIOR REMODEL OF EXISTING WASHROOMS AND DRINKING FOUNTAINS. EXISTING PA$600,000
1010119522023-05-11Plumbing6006 S PEORIA STSELF CERT 2019 CBRC CHICAGO CPS SCHOOL "NICHOLSON STEM ACADEMY" NO CHANGE IN USE. EXISTING 2-STORY BUILDING INTERIOR REMODEL OF EXISTING WASHROOMS, DRINKING FOUNTAINS AND NEW PLUMB$300,000
1010048592023-04-28Plumbing3400 W 65TH STSC 2019 CBRC: EXISTING CPS E2 OCCUPANCY SCHOOL. RENOVATION OF INTERIOR ELEMENTARY SCHOOL PRE - K ANNEX AND ADDING ADDITIONAL TOILET ROOMS. REPAVING SIDEWALK AND NEW RAMP.NO EXPANSI$500,000
1010049232023-04-04Plumbing5825 S KOSTNER AVEEXISTING CPS E2 OCCUPANCY SCHOOL. RENOVATION OF INTERIOR ELEMENTARY SCHOOL. REPAVING SIDEWALK AND INSTALLATION OF NEW ACCESSIBLE RAMPS.NO EXPANSION OF USE.$2,750,000
1010038802023-03-07Plumbing455 W 123RD STCPS SCHOOL PROJECT: NO CHANGE IN OCCUPANCY/USE (CURRENT OCCUPANCY: SCHOOL/E1; CURRENT CONSTRUCTION TYPE III-B) SELF-CERT 2019 IBC. RENOVATION OF EXISTING MODULAR BUILDING INCLU$990,000
1010023872023-03-07Plumbing2727 N LONG AVEDESCRIPTION: CPS SCHOOL PROJECT: NO CHANGE IN OCCUPANCY/USE (CURRENT OCCUPANCY: SCHOOL/E1; CURRENT CONSTRUCTION TYPE V) SELF-CERT 2019 IBC. RENOVATION OF EXISTING MODULAR BUIL$1,477,000
1010021122023-03-07Plumbing650 E 85TH STCPS SCHOOL PROJECT: NO CHANGE IN OCCUPANCY/USE (CURRENT OCCUPANCY: SCHOOL/E1; CURRENT CONSTRUCTION TYPE V-A) SELF-CERT 2019 IBC. RENOVATION OF EXISTING MODULAR BUILDING INCLUDIN$750,000
1009619092022-05-23Plumbing4250 S ROCKWELL STSELF-CERT 2019 CBRC: CPS SCHOOL, NO CHANGE IN USE. SELF-CERT PROJECT FOR ELEVATOR ADDITION & PARTIAL INTERIOR RENOVATION OF EXISTING ROOMS IN EXISTING 3-STORY & BASEMENT SCHOOL BUI$2,053,400
1009579832022-05-18Plumbing2121 N KEELER AVECHICAGO PUBLIC SCHOOLS - NO CHANGE IN USE. RENOVATION OF TWO PREK CLASSROOMS. RENOVATIONS INCLUDE FINISH UPGRADES TO CURRENT CPS PREK STANDARDS, A RENOVATED ADA PREK TOILET ROOM $509,000
1009649022022-05-13Plumbing1045 S MONITOR AVECHICAGO PUBLIC SCHOOL. NO CHANGE IN USE. 1 GROUND FLOOR PREK CLASSROOM 100 A. NEW PREK HEIGHT SINK AND ADULT HEIGHT SINK TO MATCH CURRENT CPS STANDARDS B. PROVIDE NEW DF TO MATCH C$245,000
1009579672022-05-11Plumbing4837 W ERIE STCHICAGO PUBLIC SCHOOLS - NO CHANGE IN USE.PREKINDERGARTEN EXPANSION OF TWO CLASSROOMS WITH ADDITION OF PREK TOILET ROOM IN EACH CLASSROOM. ADDITION OF PREK SINK , ADULT SINK AND D$394,000
1009584922022-05-09Plumbing2301 W 21ST PLSELF CERT PROJECT - CPS PROJECT - NO CHANGE IN USE - RENOVATION FO EXISTING INTERIOR CLASSROOMS AND INSTALLATION OF EXTERIOR SLOPED WALK. SCOPE INCLUDE REPLACEMENT OF FLOOR FINISHE$271,821
1009587942022-05-06Plumbing3151 W WALNUT STCPS SCHOOL. NO CHANGE IN USE: EXISTING 1B CONSTRUCTION E1 USE ELEMENTARY SCHOOL. EXISTING PRE-K CLASSROOMS UPDATED.$514,000
1009648462022-04-27Plumbing2815 S KOMENSKY AVECHICAGO PUBLIC SCHOOLS - NO CHANGE IN USE. RENOVATION OF THREE PREKINDERGARTEN CLASSROOMS TO BRING THEM UP TO CPS FINISH AND LAYOUT STANDARDS. CHANGES IN FINISH, RENOVATION OF ONE$429,000
1009588282022-04-25Plumbing5300 S HERMITAGE AVECPS SCHOOL. NO CHANGE IN USE: EXISTING 1B CONSTRUCTION E1 USE ELEMENTARY SCHOOL. EXISTING PRE-K CLASSROOMS UPDATED.$345,000
1009588322022-04-21Plumbing5650 S WOLCOTT AVECPS SCHOOL. NO CHANGE IN USE: EXISTING 1B CONSTRUCTION E1 USE ELEMENTARY SCHOOL. EXISTING PRE-K CLASSROOMS UPDATED.$342,000
1009588302022-04-21Plumbing4420 S SACRAMENTO AVECPS SCHOOL. NO CHANGE IN USE: EXISTING 1B CONSTRUCTION E1 USE ELEMENTARY SCHOOL. EXISTING PRE-K CLASSROOMS UPDATED.$362,000
1009201192022-04-21Plumbing3537 S PAULINA STSC 2019 CBRC: CPS SCHOOL (ELEMENTARY), ZONING: RS-3 DISTRICT, NO CHANGE IN USE (E-1 EDUCATIONAL OCCUPANCY). SITE IMPROVEMENTS INCLUDE ALTERATIONS TO PROVIDE ACCESSIBLE PARKING STA$1
1009584812022-04-20Plumbing3030 W ARTHINGTON STSELF CERT PROJECT - CPS SCHOOL - NO CHANGE IN USE - RENOVATION OF EXISTING INTERIOR CLASSROOMS. SCOPE INCLUDES REPLACEMENT OF FLOOR FINISH PAINT, MARKERBOARDS AND TOILET FIXTURES. $358,487
1009588262022-04-19Plumbing3456 W 38TH STCPS SCHOOL. NO CHANGE IN USE: EXISTING 1B CONSTRUCTION E1 USE ELEMENTARY SCHOOL. EXISTING PRE-K CLASSROOMS UPDATED.$213,000
1009585592022-04-19Plumbing2410 S LEAVITT STSELF CERT PROJECT - CPS SCHOOL - NO CHANGE IN USE - RENOVATION OF EXISTING INTERIOR CLASSROOMS. SCOPE INCLUDES REPLACEMENT OF FLOOR FINISH, PAINT, MARKERBOARDS AND TOILET ROOM FIXT$236,373
1009584662022-04-15Plumbing2332 S WESTERN AVESELF CERT PROJECT - CPS SCHOOL - NO CHANGE IN USE - RENOVATION OF EXISTING INTERIOR CLASSROOMS. SCOPE INCLUDES REPLACEMENT OF FLOOR FINISH, PAINT, MARKERBOARDS AND TOILET ROOM FIXT$335,022
1009584782022-04-14Plumbing3740 W 31ST STSELF CERT PROJECT - CPS SCHOOL - NO CHANGE IN USE - RENOVATION OF EXISTING INTERIOR CLASSROOMS. SCOPE INCLUDES REPLACEMENT OF FLOOR FINISH, PAINT, MARKERBOARDS AND TOILET ROOM FIXT$307,000
1009587952022-03-23Plumbing3250 W MONROE STCPS SCHOOL. NO CHANGE IN USE: EXISTING 1B CONSTRUCTION E1 USE ELEMENTARY SCHOOL. EXISTING PRE-K CLASSROOMS UPDATED.$365,000
1009587972022-03-23Plumbing4409 W WILCOX STCPS SCHOOL. NO CHANGE IN USE: EXISTING 1B CONSTRUCTIONE1 USE ELEMENTARY SCHOOL. EXISTING PRE-K CLASSROOMS UPDATED.$537,000
1009579382022-02-15Plumbing680 N LAKE SHORE DRTWO BATHROOMS REMODEL IN UNIT #502: CABINETS. COUNTERTOPS.REPAIR/REPLACE DRYWALL IN SAME LOCATION. REMOVE SOFFIT.TILE. PAINT. BASE MOLDING. REPLACE PLUMBING FIXTURES WITH ASSOCIATE$35,000
1009246272021-07-14Plumbing1518 W GRANVILLE AVEOCCUPANCY: EDUCATION E-1 , K-12 2 STORIES 35'-0" HIGHREMODELING OF PRE K CLASSROOMS BATH ROOMSNO CHANGE IN OCCUPANCY OR BUILDING CLASSIFICATION$172,900
1009243722021-07-12Plumbing3212 W GEORGE STREMODELING OF BOY'S AND GIRL'S BATH ROOM.OCCUPANCY: EDUCATION E-1 , K-12 3 STORIES 65'-0" HIGHNO CHANGE IN OCCUPANCY OR BUILDING CLASSIFICATION$376,933
1009244092021-06-28Plumbing2745 W ROOSEVELT RDOCCUPANCY: EDUCATION E-1 , K-12 2 STORIES 70'-0" HIGHREMODELING OF BOY'S AND GIRL'S BATH ROOM AND PRE K CLASSROOMS AND SINGLE USE TOILETS NO CHANGE IN OCCUPANCY OR BUILDING CLASSIF$584,610
1009243572021-06-28Plumbing2908 W WASHINGTON BLVDOCCUPANCY : EDUCATION E-1 , K-12 2 STORIES 70'-0" HIGHREMODELING OF PRE K CLASSROOM, BOY'S AND GIRL'S BATH ROOMNO CHANGE IN OCCUPANCY OR BUILDING CLASSIFICATION$377,000
1009243782021-06-28Plumbing3030 W ARTHINGTON STOCCUPANCY: EDUCATION E-1 , K-12 2 STORIES 70'-0" HIGHREMODELING OF SINGLE USER BATH ROOMSNO CHANGE IN OCCUPANCY OR BUILDING CLASSIFICATION$250,666
1009246942021-06-28Plumbing5900 N WINTHROP AVEOCCUPANCY: EDUCATION E-1 , K-12 NO CHANGE IN OCCUPANCY OR BUILDING CLASSIFICATIONREMODELING OF PRE K CLASSROOMS$95,100

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Chicago permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →