COMPANY RECORD · CHICAGO, IL
Mbb Enterprises Of Chicago Inc — permit history in Chicago, IL
Mbb Enterprises Of Chicago Inc appears on 210 Chicago permit records from 2007 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 216 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2007 | 6 |
| 2008 | 6 |
| 2009 | 8 |
| 2010 | 6 |
| 2011 | 5 |
| 2012 | 1 |
| 2013 | 2 |
| 2014 | 1 |
| 2015 | 1 |
| 2016 | 4 |
| 2017 | 43 |
| 2018 | 6 |
| 2019 | 14 |
| 2020 | 7 |
| 2021 | 33 |
| 2022 | 20 |
| 2023 | 9 |
| 2024 | 7 |
| 2025 | 9 |
| 2026 | 28 |
Busiest year on record: 2017, with 43 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Ewing-Doherty Mechanical, Inc | 21 | 2020-01-27 |
| Elite Electric Co. Inc. | 21 | 2026-07-16 |
| Taylor Electric Company | 20 | 2022-06-29 |
| Air Filter Heating & Clg | 19 | 2020-01-27 |
| Genesis Electric | 14 | 2022-03-21 |
| All Chicago, Inc | 13 | 2017-05-26 |
| Soukup Plumbing Inc | 13 | 2021-10-28 |
| D.A.M. Plumbing Inc. | 13 | 2017-05-26 |
| Dw Mechanical Group,Inc. | 11 | 2026-06-22 |
| J M Polcurr, Inc. | 11 | 2025-11-25 |
| Norman Mechanical | 9 | 2026-07-16 |
| Rocha Plumbing, Inc. | 7 | 2026-08-14 |
89 companies are named alongside Mbb Enterprises Of Chicago Inc on the same Chicago permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 2179 N STAVE ST | 2026-08-17 |
| 2600 N KEDZIE AVE | 2026-08-14 |
| 2567 N HOYNE AVE | 2026-07-16 |
| 2639 N HOYNE AVE | 2026-07-16 |
| 2664 N HOYNE AVE | 2026-07-14 |
| 2648 N HOYNE AVE | 2026-07-14 |
| 2600 N HOYNE AVE | 2026-07-14 |
| 2611 N HOYNE AVE | 2026-07-14 |
| 2750 N HOYNE AVE | 2026-07-14 |
| 2731 N LEAVITT ST | 2026-07-14 |
| 8913 S ASHLAND AVE | 2026-06-24 |
| 2700 S CALIFORNIA AVE | 2026-06-23 |
| 19 S LA SALLE ST | 2026-06-22 |
| 4624 S ELLIS AVE | 2026-05-15 |
175 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $74,498,863, median $260,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
210 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 101085783 | 2026-08-17 | General construction | 2179 N STAVE ST | SELF-CERT 2019 CBRC: INTERIOR ALTERATIONS FOR STRUCTRUAL UPGRADES TO EXISTING BASEMENT AND FIRST FLOOR LEVEL IN EXISTING FIRE HOUSE #43 AS PER PLANS. (OCCUPANCY GROUP R-2, S; TYPE | $500,000 |
| 101072351 | 2026-08-14 | General construction | 2600 N KEDZIE AVE | DDS 2019 CBRC: INTERIOR RENOVATION TO AN EXISTING 7 STORY RESIDENTIAL BUILDING TO REMODEL 49 RESIDENTIAL UNITS AND LOUNGE ON THE GROUND FLOOR PER PLANS. PROVIDE NEW 7 STOP ELEVATOR | $8,000,000 |
| 101055499 | 2026-07-16 | General construction | 2567 N HOYNE AVE | DDS 2019 CBRC: REPAIRS AND ALTERATIONS TO EXISTING UNOCCUPIED POWERHOUSE BUILDING WITH BASEMENT. (OCC GROUP: U; CONST TYPE: IIA) CONSULTANT REVIEWER: GLOBETROTTERS ENGINEERING | $4,000,000 |
| 101055537 | 2026-07-16 | General construction | 2639 N HOYNE AVE | DDS 2019 CBRC: BUILDING S-04, 2633 - 2667 N HOYNE AVE. ALTERATIONS TO EXISTING 2 STORY, 18 DWELLING UNIT APARTMENT BUILDING WITH BASEMENT. (OCC R-2, S-1, TYPE IIIB CONST.) PLANS SU | $6,500,000 |
| 101055541 | 2026-07-14 | General construction | 2664 N HOYNE AVE | DDS 2019 CBRC: BUILDING S-08 - 2664 - 2704 N HOYNE AVE. ALTERATIONS TO EXISTING 3 STORY, 40 DWELLING UNIT APARTMENT BUILDING WITH BASEMENT. (OCC R-2, TYPE IIIB CONST.) PLANS SUBMIT | $14,000,000 |
| 101055540 | 2026-07-14 | General construction | 2648 N HOYNE AVE | DDS 2019 CBRC: BUILDING S-07 - 2628 - 2662 N HOYNE AVE. FULL BUILDING PERMIT FOR A 2 STORY, 16 DWELLING UNIT APARTMENT BUILDING (INCL. X EFFICIENCY UNITS). (OCC R-X, TYPE IIIB CONS | $8,000,000 |
| 101055539 | 2026-07-14 | General construction | 2600 N HOYNE AVE | DDS 2019 CBRC: BUILDING S-06, 2600 - 2618 N HOYNE AVE. ALTERATIONS TO EXISTING 3 STORY, 40 DWELLING UNIT APARTMENT BUILDING WITH BASEMENT. (OCC R-2, TYPE IIIB CONST.) PLANS SUBMITT | $14,000,000 |
| 101055538 | 2026-07-14 | General construction | 2611 N HOYNE AVE | DDS 2019 CBRC: BUILDING S-05, 2601 - 2631 N HOYNE AVE. ALTERATIONS TO EXISTING 2 STORY, 16 DWELLING UNIT APARTMENT BUILDING WITH BASEMENT. (OCC R-2, TYPE IIIB CONST.) PLANS SUBMITT | $6,000,000 |
| 101055536 | 2026-07-14 | General construction | 2750 N HOYNE AVE | DDS 2019 CBRC: BUILDING S-02, 2750 - 2768 N HOYNE AVE AND 2029-2035 W DIVERSEY PARKWAY. ALTERATIONS TO EXISTING 3 STORY, 49 DWELLING UNIT APARTMENT BUILDING WITH BASEMENT. (OCC R-2 | $18,000,000 |
| 101055535 | 2026-07-14 | General construction | 2731 N LEAVITT ST | DDS 2019 CBRC: BUILDING S-01, 2731 - 2759 N LEAVITT ST AND 2041 - 2049 W DIVERSEY PARKWAY. ALTERATIONS TO EXISTING 3 STORY, 71 DWELLING UNIT APARTMENT BUILDING WITH BASEMENT. (OCC | $25,000,000 |
| 101047009 | 2026-06-24 | General construction | 8913 S ASHLAND AVE | SPR 2019 CBC CONVERTING AN EXISTING 2 STORY MOTEL TO A SINGLE ROOM TRANSITIONAL HOUSING (24 SLEEPING UNITS + 2 ADA SLEEPING UNITS FOR A TOTAL OF 26). UPDATING MEP SYSTEMS THROUGHO | $700,000 |
| B200474347 | 2026-06-23 | General construction | 2700 S CALIFORNIA AVE | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 250 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. PARAPET REBUILDING: 250 SQ. FT. LOCATION: DOC SOUTH CAMPUS BUILDING 3 ROOF. | $1,459,863 |
| 101069926 | 2026-06-22 | General construction | 19 S LA SALLE ST | DDS 2019 CBRC: INTERIOR AND EXTERIOR ALTERATIONS TO EXISTING 17 STORY OFFICE BUILDING TO CONVERT IT TO A MIXED-USE BUILDING WITH GROUND FLOOR RETAIL USE, HOTEL USE ON 2ND-3RD FLS. | $50,000,000 |
| B200470631 | 2026-05-15 | General construction | 4624 S ELLIS AVE | TEMPORARY SCAFFOLDING: QTY: 4, MAX. LENGTH: 40 FT., MAX. HEIGHT: 110 FT. LOCATION: ALL ELEVATIONS. PERMIT EXPIRATION DATE: 365 DAYS FROM PERMIT ISSUED DATE | |
| 101079861 | 2026-05-11 | General construction | 2301 S DR MARTIN L KING JR DR | DDS 2019 CBRC: INTERIOR ALTERATION PERMIT TO INSTALL NEW ESCALATORS TO CONNECT LEVELS 2 AND 3 IN EXISTING EXHIBITION/CONVENTION BUILDING. FOLLOWS PHASE 1 PERMIT 101078257 FOR PREPA | $2,000,000 |
| B200468323 | 2026-04-29 | General construction | 6710 N WASHTENAW AVE | TEMPORARY SCAFFOLDING: QTY: 2, MAX. LENGTH: 40 FT., MAX. HEIGHT: 50 FT. LOCATION: FRONT AND BACK WALL OF THE BUILDING. PERMIT EXPIRATION DATE: 365 DAYS FROM PERMIT ISSUED DATE | |
| 101078526 | 2026-04-24 | General construction | 6200 S HAMLIN AVE | CPS SCHOOL, NO CHANGE IN USE. THE WORK CONSISTS OF: ROOF REPLACEMENT, MASONRY REPAIRS, INTERIOR FINISH REPAIRS, MECHANICAL, ELECTRICAL AND PLUMBING WORK, MINOR LANDSCAPING. | $2,844,000 |
| B200466674 | 2026-04-21 | General construction | 32 W RANDOLPH ST | TEMPORARY SCAFFOLDING: QTY: 1, MAX. LENGTH: 40 FT., MAX. HEIGHT: 183 FT. LOCATION: NORTH ELEVATION. PERMIT EXPIRATION DATE: 365 DAYS FROM PERMIT ISSUED DATE | |
| 101079082 | 2026-04-13 | General construction | 8914 S BUFFALO AVE | SELF-CERT 2019 CRBC - CPS SCHOOL - NO CHANGE IN USE JAMES N. THORP ELEMENTARY SCHOOL ROOF REPLACEMENT & MEP IMPROVEMENTS AT EXISTING TWO-STORY BRICK SCHOOL BUILDING | $3,512,913 |
| B200465502 | 2026-04-09 | General construction | 19 S LA SALLE ST | TEMPORARY SCAFFOLDING: QTY: 2, MAX. LENGTH: 40 FT., MAX. HEIGHT: 190 FT. LOCATION: SOUTH ELEVATION. PERMIT EXPIRATION DATE: 365 DAYS FROM PERMIT ISSUED DATE | |
| 101078533 | 2026-04-08 | General construction | 5815 S HOMAN AVE | CPS SCHOOL, NO CHANGE IN USE. MONARCAS ELEMENTARY. THE WORK CONSISTS OF: ROOF REPLACEMENT, MASONRY REPAIRS, INTERIOR REPAIRS, MECHANICAL EQUIPMENT REPLACEMENT, EXTERIOR LIGHTING, L | $3,095,000 |
| 101079568 | 2026-03-27 | General construction | 1101 W WAVELAND AVE | SELF-CERT 2019 CBRC: ***STRUCTURAL PEER REVIEW*** CONSTRUCTION OF A NEW ARCHWAY AT THE WEST SIDE OF GALLAGHER WAY WITH BRICK PIERS AND DECORATIVE METAL TRUSS. SCOPE INCLUDES INTEGR | $1,000,000 |
| 101079418 | 2026-03-25 | General construction | 6710 N WASHTENAW AVE | SC 2019 CBRC: ROOF REPLACEMENT, MASONRY REPAIRS, SELECT INTERIOR SCOPE INCLUDING FINISHES, ELECTRICAL, AND MECHANICAL | $4,000,000 |
| B200462808 | 2026-03-25 | General construction | 6650 S STONY ISLAND AVE | SCOPE: EXTERIOR NORTH WALL RESTORATION IMPACTED BY VEHICLE: REMOVE AND REPLACE CMU, BRICK VENEER AT FULL HEIGHT, RESTORE FRAMING, INSULATION AND WALLBOARD, REPLACE AFFECTED ELECTRI | $111,768 |
| 101078754 | 2026-03-25 | General construction | 3616 W ARMITAGE AVE | SC 2019 CBC: FULL BUILDING PERMIT FOR A FULL ROOF REPLACEMENT FOR A 4-STORY 76,262SF ELEMENTARY SCHOOL BUILDING. (OCCUPANCY GROUP E-1; TYPE IIIB CONSTRUCTION) | $1,825,000 |
| 101078732 | 2026-02-17 | General construction | 1841 N SPRINGFIELD AVE | SC 2019 CBRC: FULL ROOF REPLACEMENT FOR A 3-STORY, 83,071 SF ELEMENTARY SCHOOL. (OCCUPANCY GROUP E-1; TYPE IIA CONSTRUCTION) | $2,940,000 |
| B200453272 | 2026-01-30 | General construction | 210 N PEORIA ST | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 1071 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. PARAPET REBUILDING: 294 SQ. FT. LOCATION: EXTERIOR. | $200 |
| 101069625 | 2026-01-30 | General construction | 8301 S SOUTH SHORE DR | SPR 2019 CBC: RENOVATION OF EXISTING 2 STORY W/ BASEMENT COMMERCIAL BUILDING AND CONSTRUCTION OF NEW 2 STORY W/ BASEMENT ADDITION FOR BIRTH CENTER W/ 3 PARKING SPACES AND ASSOCIATE | $6,800,000 |
| 101072146 | 2025-11-25 | General construction | 100 N COLUMBUS DR | SPR 2019 CBRC: AT EXISTING GRADE LEVEL FOUNTAIN AT LURIE GARDEN, REMOVE AND REPLACE EXISTING PLUMBING AND ELECTRICAL FOR FOUNTAIN FEATURES INCLUDING LOWER-LEVEL MECHANICAL ROOM EQU | $2,566,000 |
| 101071131 | 2025-11-25 | General construction | 5480 S KENWOOD AVE | SPR 2019 CBC: REVISION TO PERMIT 101039685 TO REVISE PLUMBING FIXTURE COUNTS, RECONFIGURATION OF FLOOR PLAN (<25%) OF TOTAL AREA, REWORK OF STRUCTURAL STEEL IN SOME LOCATIONS, AND | $500,000 |
| B200431936 | 2025-08-19 | General construction | 40 E GARFIELD BLVD | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 2279 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: ROOF LEVEL MASONRY REPAIR. | $17,100 |
| B200423972 | 2025-05-02 | General construction | 936 E 47TH ST | TEMPORARY SCAFFOLDING: QTY: 2, MAX. LENGTH: 40 FT., MAX. HEIGHT: 170 FT. LOCATION: ALL ELEVATIONS. PERMIT EXPIRATION DATE: 365 DAYS FROM PERMIT ISSUED DATE | |
| 101066355 | 2025-03-27 | General construction | 3300 E CHELTENHAM DR | PHASES 9-12 112,400 SINGLE STORY ROOF PERCAST CHANNELS, STEEEL REPLACEMENT, ARCHITCTURAL AND MEP REPLACEMENT (FILTER GALLERIES 1 AND 2, AND THE SAND ROOM).EUGENE SAWYER PURFICATION | $74,498,863 |
| 101062360 | 2025-03-24 | General construction | 2508 W 21ST ST | DDS 2019 CBRC: PROPOSED ADAPTIVE REUSE ALTERATION TO EXISTING 1-2 STORY INDUSTRIAL BUILDINGS AT 2508-2538 W 21ST STREET. THE ALTERATION INCLUDES GUT DEMOLITION OF THE EXISTING BUIL | $16,037,832 |
| B200414272 | 2025-02-20 | General construction | 936 E 47TH ST | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 2000 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: WORK ON NORTH, SOUTH AND EAST ELEVATIONS. | $34,000 |
| B200414272 | 2025-02-20 | General construction | 936 E 47TH ST | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 2000 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: WORK ON NORTH, SOUTH AND EAST ELEVATIONS. | $34,000 |
| B200411409 | 2025-01-20 | General construction | 3204 W IRVING PARK RD | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 200 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: EXTERIOR BRICK DAMAGE AREA. | $34,000 |
| B200397877 | 2024-10-16 | General construction | 1635 W BELMONT AVE | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 3000 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: WORK AS PER CRITICAL EXAMINATION REPORT. | $299,925 |
| B200397877 | 2024-10-16 | General construction | 1635 W BELMONT AVE | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 3000 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: WORK AS PER CRITICAL EXAMINATION REPORT. | $299,925 |
| 101056735 | 2024-10-15 | General construction | 1404 S HOMAN AVE | SPR 2019 CBC: CHA AFFORDABLE- INTERIOR AND EXTERIOR RENOVATIONS TO TWENTY-FOUR UNIT, THREE STORY RESIDENTIAL APARTMENT BUILDING.WORK TO INCLUDE ELECTRICAL, MECHANICAL, PLUMBING AND | $7,500,000 |
| 101039685 | 2024-07-25 | General construction | 5480 S KENWOOD AVE | DEMO EXISTING PARTITIONS, DUCTWORK, ELECTRICAL & PLUMBING LINES PER PLANS; INSTALL NEW WALL PARTITIONS PER PLANS, NEW ELECTRICAL CONDUIT, PANEL RELOCATION, WIRING, NEW SWICHES & OU | $700,000 |
| B200021983 | 2024-07-08 | General construction | 200 E 115TH ST | TEMPORARY SCAFFOLDING: QTY: 2, MAX. LENGTH: 40 FT., MAX. HEIGHT: 45 FT. LOCATION: MASONRY REPAIRS. PERMIT EXPIRATION DATE: 365 DAYS FROM PERMIT ISSUED DATE | |
| 101034568 | 2024-06-12 | General construction | 1711 W 61ST ST | DDS 2019 CBRC - INTERIOR & EXTERIOR ALTERATIONS TO EXISTING 4-STORY SCHOOL TO CONVERT TO RESIDENTIAL APARTMENT BUILDING (50 DWELLING UNITS) TO INCLUDE AT GRADE PARKING LOT (51 PARK | $25,000,000 |
| B200012555 | 2024-04-09 | General construction | 900 S COLUMBUS DR | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 250 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: CHIMNEY. | $2,400 |
| B200001891 | 2023-11-17 | General construction | 222 N CANAL ST | REVISION TO PERMIT#100996244 CHANGE GENERAL CONTRACTOR AND MASON CONTRACTOR | |
| 100981316 | 2023-10-19 | General construction | 2032 N CLYBOURN AVE | FACADE REPAIRS INCLUDE: 11,440 SQ FT TUCKPOINTING, REPLACE 137 LF - APPROX 9 LINTELS, 213 SQ FT PARAPET REBUILD, REPLACE 3005 SQ FT OF BRICKS AND 1050 SQ FT OF CONCRETE, 5,965 LF O | $100,000 |
| 101026406 | 2023-09-28 | General construction | 551 W ELM ST | SELF-CERT 2019 CBC: NEW ADDITION OF A MAINTENANCE ROOM WITHIN THE COVERED GARAGE AREA OF THE EXISTING BUILDING AS PER PLANS (OCCUPANCY R-2, S2 CONSTRUCTION TYPE 1B) | $170,000 |
| 101025265 | 2023-07-25 | General construction | 2032 N CLYBOURN AVE | ERECT FOUR (4) SCAFFOLDS DATES 07/25/2023 THROUGH 07/25/2024 | $111 |
| 101006208 | 2023-07-21 | General construction | 330 E 133RD ST | SELF-CERT 2019 CBRC: INTERIOR AND EXTERIOR ALTERATIONS TO AN EXISTING PUBLIC SCHOOL TO REPAIR LASCAPING, FENCING, STEPS AND PAVED AREAS, ALTERATIONS, REPAIRS AND MECHANICAL UPGRADE | $2,800,000 |
| 101006231 | 2023-07-21 | General construction | 1710 E 93RD ST | SELF-CERT 2019 CBRC: INTERIOR AND EXTERIOR ALTERATIONS TO AN EXISTING PUBLIC SCHOOL TO REPAIR LASCAPING, FENCING, STEPS AND PAVED AREAS, REPLACE WINDOWS, ALTERATIONS, REPAIRS AND M | $4,400,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Chicago permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
