COMPANY RECORD · CHICAGO, IL
Agae Contractors, Inc. — permit history in Chicago, IL
Agae Contractors, Inc. appears on 169 Chicago permit records from 2008 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 169 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2008 | 1 |
| 2011 | 2 |
| 2013 | 1 |
| 2014 | 5 |
| 2015 | 3 |
| 2017 | 3 |
| 2019 | 18 |
| 2020 | 9 |
| 2021 | 18 |
| 2022 | 59 |
| 2023 | 11 |
| 2024 | 7 |
| 2025 | 20 |
| 2026 | 12 |
Busiest year on record: 2022, with 59 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| All Tech Energy, Inc. | 26 | 2026-05-04 |
| Blackhawk HVAC, Inc. | 18 | 2025-05-02 |
| Candor Electric, Inc. | 17 | 2023-02-24 |
| A & H Plumbing & Heating | 15 | 2025-04-24 |
| Terry Plumbing A Matrix Holdin | 13 | 2026-05-12 |
| Kroeschell Engineering Co,Inc | 12 | 2025-06-27 |
| Chicago Area Plumbing Incorp | 10 | 2025-04-16 |
| Drive Construction, Inc. | 10 | 2022-01-10 |
| R.J. Olmen Co | 9 | 2023-02-17 |
| Leelectric Inc. | 8 | 2026-04-23 |
| Peak Electric, Inc. | 7 | 2021-06-30 |
| Rd's HVAC Inc. | 6 | 2023-02-24 |
61 companies are named alongside Agae Contractors, Inc. on the same Chicago permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 8050 S CHAPPEL AVE | 2026-08-14 |
| 1628 W WASHINGTON BLVD | 2026-07-01 |
| 247 W 23RD PL | 2026-05-12 |
| 4520 S KEDZIE AVE | 2026-05-12 |
| 2712 S SAWYER AVE | 2026-05-04 |
| 6200 S HAMLIN AVE | 2026-04-24 |
| 4850 N KENMORE AVE | 2026-04-23 |
| 5329 S OAK PARK AVE | 2026-04-20 |
| 1650 W CORNELIA AVE | 2026-04-20 |
| 5815 S HOMAN AVE | 2026-04-08 |
| 1423 W BRYN MAWR AVE | 2026-03-31 |
| 2625 N ORCHARD ST | 2026-03-20 |
| 5015 S BLACKSTONE AVE | 2025-12-03 |
| 1321 S PAULINA ST | 2025-11-18 |
150 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1 to $15,849,000, median $352,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
169 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 101084181 | 2026-08-14 | General construction | 8050 S CHAPPEL AVE | SELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO A VESTIBULE FOR A VERTICAL PLATFORM LIFT ADDITION FOR 2 STORY CPS SCHOOL BUILDING. (OCCUPANCY GROUP E-1; TYPE IA CONSTRUCTION) | $80,000 |
| 101083946 | 2026-07-01 | General construction | 1628 W WASHINGTON BLVD | EXISTING CPS E-1 OCCUPANT SCHOOL. INTERIOR ARCHITECTURAL FINISHES AND LIMITED MODIFICATION TO EXISTING MECHANICAL, PLUMBING, AND ELECTRICAL SYSTEMS. | $1,100,000 |
| 101079055 | 2026-05-12 | General construction | 247 W 23RD PL | REMOVAL OF EXISTING ROOFING AND REPLACEMENT WITH NEW | $2,000,000 |
| 101078390 | 2026-05-12 | General construction | 4520 S KEDZIE AVE | SELF-CERTIFIED MECHANICAL AND ELECTRICAL ALTERATIONS AT AN EXISTING CHICAGO PUBLIC SCHOOLS FACILITY. SCOPE INCLUDES REPLACEMENT OF THE EXISTING ROOF-MOUNTED AIR-COOLED CHILLER, ASS | $1,400,000 |
| 101082001 | 2026-05-04 | General construction | 2712 S SAWYER AVE | ROOFING REPLACEMENT | $790,000 |
| 101078526 | 2026-04-24 | General construction | 6200 S HAMLIN AVE | CPS SCHOOL, NO CHANGE IN USE. THE WORK CONSISTS OF: ROOF REPLACEMENT, MASONRY REPAIRS, INTERIOR FINISH REPAIRS, MECHANICAL, ELECTRICAL AND PLUMBING WORK, MINOR LANDSCAPING. | $2,844,000 |
| 101077169 | 2026-04-23 | General construction | 4850 N KENMORE AVE | SPR 2019 CBRC: PARTIAL PAVEMENT RELACEMENT, FENCE REPLACEMENT (6FT WOOD AND 4FT ORNAMENTAL), NEW PEDESTRIAN GATES, PLAYGROUND EQUIPMENT AND POURED-IN-PLACE SURFACE AT CPS MCCUTCHEO | $497,000 |
| 101078609 | 2026-04-20 | General construction | 5329 S OAK PARK AVE | SPR 2019 CBRC: EXISTING PLAYGROUND AND RUBBER SURFACE REPLACEMENT, 4FT ORNAMENTAL FENCE INFILL, PARTIAL CONCRETE PAVEMENT REPLACEMENT, ADA PARKING RE-STRIPING, ADA PARKING SIGNS RE | $1,019,000 |
| 101078595 | 2026-04-20 | General construction | 1650 W CORNELIA AVE | SELF CERT 2019 CBRC: SCOPE FOR BOILER REPLACEMENT AND AIR HANDLING UNIT REPLACEMENT. INCLUDES INSTALLATION OF NEW RETURN FAN IN ATTIC, NEW ROOF DORMER TO ALLOW RETURN AIR DUCT TO E | $4,000,000 |
| 101078533 | 2026-04-08 | General construction | 5815 S HOMAN AVE | CPS SCHOOL, NO CHANGE IN USE. MONARCAS ELEMENTARY. THE WORK CONSISTS OF: ROOF REPLACEMENT, MASONRY REPAIRS, INTERIOR REPAIRS, MECHANICAL EQUIPMENT REPLACEMENT, EXTERIOR LIGHTING, L | $3,095,000 |
| 101078756 | 2026-03-31 | General construction | 1423 W BRYN MAWR AVE | OCCUPANCY IS EXISTING ELEMENTARY SCHOOL E-1. REMODELING OF TWO EXISTING MULTI-SEAT TOILET ROOMS AND ONE SINGLE-SEAT TOILET ROOM. | $575,000 |
| 101078755 | 2026-03-20 | General construction | 2625 N ORCHARD ST | OCCUPANCY: EXISTING ELEMENTARY SCHOOL E-1. REMODELING OF TWO EXISTING MULT-SEAT TOILET ROOMS AND ONE SINGLE SEAT TOILET ROOM. | $575,000 |
| 101075911 | 2025-12-03 | General construction | 5015 S BLACKSTONE AVE | SELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO HIGH SCHOOL WEIGHT ROOM, DANCE STUDIO, AND PHOTOGRAPHY DARK ROOM; NO CHANGE IN OCCUPANCY (OCCUPANCY GROUP E-1; TYPE 1B CONSTRUCTION) | $600,000 |
| 101071929 | 2025-11-18 | General construction | 1321 S PAULINA ST | SELF-CERT 2019 CBRC: EXTERIOR RAMP AND HANDRAIL REPLACEMENT (OCCUPANCY GROUP E-1, CONSTRUCTION TYPE 1B) | $30,000 |
| 101071414 | 2025-09-19 | General construction | 2236 N ROCKWELL ST | SPR 2019 CBRC: CPS GOETHE - NEW ARTIFICIAL TURF FIELD, NATURE PLAYGROUND, AND PAVING AREA. EXTERIOR IMPROVEMENTS ONLY, NO INTERIOR SCOPE OF WORK. OCCUPANCY GROUP E-1 (TO REMAIN), T | $551,000 |
| B200437546 | 2025-08-22 | General construction | 825 N CHRISTIANA AVE | REPAIR OR IN-KIND REPLACEMENT OF 60 PLUMBING FIXTURES AS DESCRIBED IN PERMIT APPLICATION. INCLUDES REPAIR OR REPLACMENT OF PLUMBING PIPING. INCLUDES REPAIR OR REPLACEMENT OF PLUM | $30,000 |
| 101069077 | 2025-08-04 | General construction | 2727 N LONG AVE | SPR 2019 CBRC: REFURBISHMENT OF AN EXISTING ASPHALT COURTYARD WITH A TURF FIELD, PERMEABLE VOLUME CONTROL STONE STORAGE MEDIA, CONCRETE PAVEMENTS, AND STORM SEWER UTILITY CONNECTIO | $1,048,951 |
| 101069447 | 2025-06-27 | General construction | 12810 S ESCANABA AVE | SELF-CERT 2019 CBRC: ALTERATIONS TO EXISTING TOILET ROOMS AT EXISTING 2 STORY SCHOOL INCLUDING ASSOCIATED PLUMBING, VENTILATION AND ELECTRICAL WORK. (OCCUPANCY GROUP E-1; TYPE IB C | $400,000 |
| 101066376 | 2025-06-09 | General construction | 4155 N SACRAMENTO AVE | SPR 2019 CBRC EXTERIOR IMPROVEMENTS TO EXISTING CPS ELEMENTARY SCHOOL PLAYGROUND INCLUDING NEW RESILIENT SURFACING PLAYLOT WITH NEW PLAYGROUND EQUIPMENT, OUTDOOR BASKETBALL HALF-CO | $665,000 |
| 101066347 | 2025-06-09 | General construction | 2009 W SCHILLER ST | SPR 2019 CBRC EXTERIOR IMPROVEMENTS TO EXISTING CPS ELEMENTARY SCHOOL PLAYGROUND INCLUDING NEW RESILIENT SURFACING PLAYLOT WITH NEW PLAYGROUND EQUIPMENT, OUTDOOR PAVED SPORTS COURT | $604,000 |
| 101063540 | 2025-05-29 | General construction | 1254 N OAKLEY BLVD | SPR 2019 CBRC EXTERIOR IMPROVEMENTS TO EXISTING CPS ELEMENTARY SCHOOL PLAYGROUND INCLUDING NEW RESILIENT SURFACING PLAYLOT WITH NEW PLAYGROUND EQUIPMENT, OUTDOOR BASKETBALL COURT, | $990,000 |
| 101064636 | 2025-05-05 | General construction | 3250 W MONROE ST | SELF-CERT 2019 CBRC: REMODEL EXISTING TOILET ROOMS ON 1ST, 2ND & 3RD FLOORS OF ELEMENTARY SCHOOL. (OCC. E-1) | $500,000 |
| 101064638 | 2025-05-05 | General construction | 1940 W 18TH ST | REMODELING OF EXISTING STUDENT TOILETS FOR ADA USE, INCLUDING EXISTING TEACHER TOILET INTO ALL GENDER TOILET. | $650,000 |
| 101064630 | 2025-05-05 | General construction | 646 N LAWNDALE AVE | EDUCATIONAL E-1, C-3. REMODELING OF EXISTING BOYS AND GIRLS TOILETS FIRST FLOOR INCLUDING ADA REQUIREMENTS, SECOND ADDITION AND UPGRADING EXISTING SINGLE STALL TOILET TO ALL -GENDE | $550,000 |
| 101064634 | 2025-05-02 | General construction | 3857 W 111TH ST | SELF-CERT 2019 CBRC:RE-ROOFING AND MECHANICAL SYSTEMS UPGRADES OF AN EXISTING ONE-STORY CPS HIGH SCHOOL, CONSISTING OF 3 BUILDINGS A, B & C. OCCUPANCY GROUP E-1 FOR ENTIRE CAMPUS; | $4,500,000 |
| 101062012 | 2025-04-24 | General construction | 10330 S ELIZABETH ST | SPR 2019 CBRC: NEW ARTIFICAL TURF FIELD AND TRACK, EXTERIOR LIGHTING, PARTIAL PAVEMENT AT CPS PERCY JULIAN HIGH SCHOOL. EXTERIOR IMPROVEMENTS ONLY, NO INTERIOR SCOPE OF WORK. OCCUP | $4,047,000 |
| 101064555 | 2025-04-22 | General construction | 6011 S ROCKWELL ST | SELF-CERT 2019 CBRC: ALTERATIONS TO MEP SYSTEMS IN 3 STORY CPS SCHOOL BUILDING. (OCCUPANCY GROUP E-1; TYPE IA CONSTRUCTION) | $4,456,000 |
| 101064675 | 2025-04-16 | General construction | 2504 W MONROE ST | SELF-CERT 2019 CBRC ALTERATION LEVEL 1: EXISTING 1 STORY (12 FT TO 24 FT HIGH) MASONRY BUILDING. EXTERIOR: YARD REPAIR INCLUDES NEW PERMEABLE PAVERS REPLACING PAVEMENT, NEW PLAYGRO | $955,000 |
| 101065588 | 2025-04-15 | General construction | 5900 N NINA AVE | SELF-CERT 2019 CBRC: CPS NORWOOD PARK ALTERATION LEVEL 2 - EXISTING CHILLERS REPLACEMENT ALONG WITH ASSOCIATED PIPING AND ELECTRICAL. REPLACE CHILLER ENCLOSURE DOOR, MDF ROOM DOOR, | $1,247,000 |
| 101063694 | 2025-04-11 | General construction | 25 W 47TH ST | SELF CERT PROJECT - CPS SCHOOL - NO CHANGE IN USE - RENOVATION OF EXISTING INTERIOR RESTROOMS AND LIBRARY FOR INTERIOR FINISHES AND ACCESSIBILITY. | $413,000 |
| 101065589 | 2025-04-11 | General construction | 6220 N OLCOTT AVE | SELF-CERT 2019 CBRC: ALTERATION LEVEL 2 - REPLACE EXISTING ROOF MOUNTED CHILLER AND ASSOCIATED PIPING/ELECTRICAL. PROVIDE KEYLESS ACCESS SYSTEM AT THE EXISTING ENTRANCE, MDF ROOM, | $1,457,000 |
| 101065591 | 2025-03-24 | General construction | 1707 W MORSE AVE | SELF-CERT 2019 CBRC: ALTERATION LEVEL 2 - EXISTING CHILLER REPLACEMENT ALONG WITH ASSOCIATED PIPING AND ELECTRICAL. ADD KEYLESS ACCESS SYSTEM AT THE MDF RM DOOR, AND ALL ASSOCIATED | $1,393,000 |
| 101059819 | 2024-12-10 | General construction | 42 W MADISON ST | STANDARD PLAN REVIEW - INTERIOR RENOVATION OF THE LOWER LEVEL OF CHICAGO PUBLIC SCHOOL'S CENTRAL OFFICE. WORK INCLUDES SELECTIVE DEMOLITION OF EXISTING OFFICES, STORAGE ROOMS AND | $2,345,251 |
| B200399094 | 2024-10-04 | General construction | 42 W MADISON ST | SCOPE: NONSTRUCTURAL INTERIOR PREPARATORY DEMOLITION.LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 NON-RESIDENTIAL UNIT(S), 1 INTERIOR COMMON AREAS, BASEMENT. | $63,399 |
| 101053731 | 2024-06-26 | General construction | 12810 S ESCANABA AVE | SELF CERT - CHICAGO PUBLIC SCHOOL - RENOVATION AND REPAIRS OF EXISTING 2 CLASSROOM MODULAR BUILDING AT GRISSOM ELEMENTARY SCHOOL | $500,000 |
| 100980131 | 2024-06-06 | General construction | 3436 W WILSON AVE | **SPR, 2019 CBRC** EXTERIOR IMPROVEMENTS INCLUDING PARKING LOT RENOVATION; NEW MINIMUM REGULATION SIZE ARTIFICIAL TURF SPORTS FIELD; BLEACHERS, SCOREBOARD, LIGHTING, AND SPORTS NET | $4,200,000 |
| B200015119 | 2024-06-04 | General construction | 4338 W WABANSIA AVE | HYDRONIC PIPING EXTENSION/RECONFIGURATION, REPAIR/REPLACEMENT AFFECTING 1 SYSTEMS : 1 CHILLER(YORK YVAA0425, ROOF CHILLER ENCLOSURE) . ELECTRICAL WORK UNDER THIS PERMIT = YES . L | $1,700,000 |
| 100998895 | 2024-04-17 | General construction | 5950 S WOODLAWN AVE | SPR 2019 CBRC: SITEWORK UPGRADES TO ADD WALKING TRAILS AND NATURE PLAY AREA TO AN EXISTING PUBLIC PARK (OCCUPANCY N/A; CONSTRUCTION TYPE N/A) | $4,000,000 |
| 101018346 | 2024-04-10 | General construction | 2501 W ADDISON ST | **SPR, 2019 CBRC** EXTERIOR IMPROVEMENTS INCLUDING PARKING, ON SITE LIGHTING, EXTERIOR ACCESSIBILITY, AND LANDSCAPE AND PAVING IMPROVEMENTS. (OCCUPANCY E-1, CONSTRUCTION TYPE IIA) | $5,800,000 |
| 101020245 | 2023-11-13 | General construction | 525 N ARMOUR ST | SPR 2019 CBRC: PLAYGROUND REPLACEMENT, NEW ARTIFICIAL TURF FIELD, PARTIAL PAVEMENT REPLACEMENT, CONVERTING STANDARD PARKING SPACES INTO ADA PARKING, NEW LIGHT POLE AND ASSOCITED IN | $2,386,000 |
| 101006908 | 2023-07-21 | General construction | 7433 S DORCHESTER AVE | EXISTING CHICAGO PUBLIC SCHOOL: REMOVAL AND REPLACEMENT OF EXISTING FENCE AROUND PLAYLOT, STAIR WELL, COMED TRANSFORMER AND ALONG THE ALLEY. | $145,000 |
| 101010055 | 2023-06-01 | General construction | 2501 W ADDISON ST | EXISTING CPS SCHOOL, EDUCATIONAL GROUP E-1, CONST. CLASS IB, NOCHANGE IN USE. WORK INCLUDES UPGRADE AND REPLACEMENT OF MECHANICAL AND ELECTRICAL AND SELECTIVE INTERIOR FINISH RENO | $8,626,000 |
| 101006571 | 2023-05-24 | General construction | 6206 N HAMLIN AVE | SPR 2019 CBRC: REPLACE EXISTING PLAYGROUND AND PARTIAL PAVEMENT&ORNAMENTAL FENCE AT CPS SOLOMON ELEMENTARY SCHOOL. EXTERIOR IMPROVEMENTS ONLY, NO INTERIOR SCOPE OF WORK. OCCUPANCY | $770,000 |
| 101002827 | 2023-05-02 | General construction | 2908 W WASHINGTON BLVD | CPS SCHOOL WITH NO CHANGE IN USE. THIS PROJECT IS FOR THE COMPLETE ROOF REPLACEMENT AND HVAC RENOVATION AND UPGRADE AT CATHER ELEMENTARY, A 2 STORY, EDUCATIONAL OCCUPANCY BUILDING | $8,250,000 |
| 100920130 | 2023-04-27 | General construction | 344 W 28TH PL | INTERIOR RENOVATIONS OF AN EXISTING 13 STORY BUILDING. WORK TO INCLUDE UPGRADE TO AMENITY SPACES, MINOR WORK IN EACH RESIDENT UNIT FOR MECHANICAL EXHAUST FANS. NEW FIRE RATED SHAFT | $250,000 |
| 101003192 | 2023-02-24 | General construction | 10810 S AVENUE H | RENOVATION OF EXISTING CPS 8-CLASSROOM MODULAR BUILDING, FINISHES, LIGHTING, WINDOWS, DOORSMINOR UPGRADES CONNECTED TO MAIN BUILDING, APHONE | $2,000,000 |
| 101003248 | 2023-02-24 | General construction | 10845 S AVENUE J | RENOVATION TO AN EXISTING CPS 2-CLASSROOM MODULAR CLASSROOM BUILDINGFINISHES, MINOR ELECTRICAL, PLUMBING | $750,000 |
| 101003243 | 2023-02-24 | General construction | 10839 S AVENUE J | RENOVATION OF EXISTING CPS 2-CLASSROOM ELEMENTARY MODULAR BUILDINGFINISHESMINOR ELECTRICAL, PLUMBING | $750,000 |
| 101003484 | 2023-02-23 | General construction | 525 N ARMOUR ST | SELF-CERT 2019 CBCR: INTERIOR AND EXTERIOR RENOVATIONS AND HVAC REPLACEMENT FOR ELEMENTARY SCHOOL. NO CHANGE TO STRUCTURE. (OCCUPANCY GROUP E-1; CONSTRUCTION TYPE IB) | $9,390,889 |
| 100960649 | 2023-02-17 | General construction | 4251 N CLARENDON AVE | THE CURRENT AND PROPOSED OCCUPANCY IS E-1 SCHOOL (CPS) FOR SELF CERT WITH STRUCTURAL PEER REVIEW. SCOPE IS AS FOLLOWS: REMOVE ALL EXISTING ROOFING, FLASHING AND INSULATION. INSTALL | $2,353,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Chicago permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
