COMPANY RECORD · CHICAGO, IL
K.R. Miller Contractors, Inc. — permit history in Chicago, IL
K.R. Miller Contractors, Inc. appears on 369 Chicago permit records from 2006 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 387 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2006 | 8 |
| 2007 | 10 |
| 2008 | 6 |
| 2009 | 33 |
| 2010 | 24 |
| 2011 | 21 |
| 2012 | 20 |
| 2013 | 33 |
| 2014 | 19 |
| 2015 | 5 |
| 2016 | 4 |
| 2017 | 6 |
| 2018 | 10 |
| 2019 | 9 |
| 2020 | 18 |
| 2021 | 45 |
| 2022 | 51 |
| 2023 | 26 |
| 2024 | 5 |
| 2025 | 24 |
| 2026 | 10 |
Busiest year on record: 2022, with 51 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Rd's HVAC Inc. | 64 | 2023-05-04 |
| Drive Construction, Inc. | 52 | 2023-04-06 |
| Horizon Contractors, Inc. | 46 | 2026-03-25 |
| Katco Development, Inc. | 44 | 2025-06-10 |
| Triton Plumbing, LLC | 39 | 2023-06-26 |
| Candor Electric, Inc. | 36 | 2026-04-27 |
| Chi-Town Plumbers Inc | 24 | 2026-05-07 |
| Qu-Bar, Inc | 23 | 2013-08-02 |
| J. A. Mc Cabe Enterprises, Inc | 22 | 2012-06-20 |
| Affordable Comfort Const. | 22 | 2014-04-15 |
| Blackhawk HVAC, Inc. | 20 | 2026-03-25 |
| Chicago Area Plumbing Incorp | 19 | 2022-10-13 |
136 companies are named alongside K.R. Miller Contractors, Inc. on the same Chicago permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 3615 W 16TH ST | 2026-06-26 |
| 2350 W 110TH PL | 2026-06-02 |
| 8010 S KOSTNER AVE | 2026-05-19 |
| 3611 E 114TH ST | 2026-05-19 |
| 5114 S ELIZABETH ST | 2026-05-07 |
| 5300 S HERMITAGE AVE | 2026-04-27 |
| 8914 S BUFFALO AVE | 2026-04-13 |
| 3616 W ARMITAGE AVE | 2026-03-25 |
| 5450 W 64TH PL | 2026-03-25 |
| 1841 N SPRINGFIELD AVE | 2026-02-17 |
| 3542 S WASHTENAW AVE | 2025-07-03 |
| 801 E 133RD PL | 2025-06-25 |
| 247 W 23RD PL | 2025-06-10 |
| 249 E 37TH ST | 2025-06-10 |
256 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1 to $49,500,000, median $517,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
369 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| B200474533 | 2026-06-26 | General construction | 3615 W 16TH ST | IN-KIND REPLACEMENT OF EXTERIOR WINDOWS AND DOORS IN EXISTING OPENINGS. REPLACEMENT WINDOWS: 250; REPLACEMENT SKYLIGHTS: 0; REPLACEMENT DOORS: 0. AFFECTS: 0 RESIDENTIAL UNIT(S), 0 | $600,000 |
| 101079252 | 2026-06-02 | General construction | 2350 W 110TH PL | SC 2019 CBRC: REPLACEMENT OF EXISTING MECHANICAL HEATING PLANT AND PROVISION OF NEW ELECTRICAL SERVICE TO SUPPORT MECHANICAL WORK. ASSOCIATED ALTERATIONS INCLUDE MASONRY CHIMNEY RE | $4,915,000 |
| 101080631 | 2026-05-19 | General construction | 8010 S KOSTNER AVE | SPR 2019 CBRC: RENOVATION OF THREE BATHROOMS IN ELEMENTARY SCHOOL BUILDING, ONE BOYS', ONE GIRLS', AND ONE SINGLE USER GENDER NEUTRAL RESTROOM. OCCUPANCY GROUP E-1 CONSTRUCTION TYP | $570,000 |
| 101080630 | 2026-05-19 | General construction | 3611 E 114TH ST | SPR 2019 CBRC: RENOVATION OF FIVE BATHROOMS IN ELEMENTARY SCHOOL BUILDING, TWO BOYS', TWO GIRLS', AND ONE SINGLE USER GENDER NEUTRAL RESTROOM. OCCUPANCY GROUP E-1. CONSTRUCTION TYP | $517,000 |
| 101080150 | 2026-05-07 | General construction | 5114 S ELIZABETH ST | SELF-CERT 2019 CBRC: CHICAGO PUBLIC SCHOOL FACILITY. NO CHANGE IN USE. LOCALIZED TOILET ROOM REPAIRS AND MODIFICATIONS. INTERIOR REPAIRS & MODIFICATIONS. LOCALIZED EXTERIOR PAVING | $807,000 |
| 101080118 | 2026-04-27 | General construction | 5300 S HERMITAGE AVE | SELF-CERT 2019 CBRC: CHICAGO PUBLIC SCHOOL FACILITY. NO CHANGE IN USE. LOCALIZED TOILET ROOM REPAIRS AND MODIFICATIONS. INTERIOR LIFT INSTALLATION. LOCALIZED EXTERIOR PAVING REPAIR | $807,370 |
| 101079082 | 2026-04-13 | General construction | 8914 S BUFFALO AVE | SELF-CERT 2019 CRBC - CPS SCHOOL - NO CHANGE IN USE JAMES N. THORP ELEMENTARY SCHOOL ROOF REPLACEMENT & MEP IMPROVEMENTS AT EXISTING TWO-STORY BRICK SCHOOL BUILDING | $3,512,913 |
| 101078754 | 2026-03-25 | General construction | 3616 W ARMITAGE AVE | SC 2019 CBC: FULL BUILDING PERMIT FOR A FULL ROOF REPLACEMENT FOR A 4-STORY 76,262SF ELEMENTARY SCHOOL BUILDING. (OCCUPANCY GROUP E-1; TYPE IIIB CONSTRUCTION) | $1,825,000 |
| 101079044 | 2026-03-25 | General construction | 5450 W 64TH PL | SC 2019 CBRC: INTERIOR ALTERATIONS FOR CPS GRIMES ELEMENTARY SCHOOL. REPLACEMENT OF EXISTING MECHANICAL SYSTEMS, PARTIAL ROOF REPLACEMENT, NEW FIRE ALARM SYSTEM, AND ARCHITECTURAL | $2,869,000 |
| 101078732 | 2026-02-17 | General construction | 1841 N SPRINGFIELD AVE | SC 2019 CBRC: FULL ROOF REPLACEMENT FOR A 3-STORY, 83,071 SF ELEMENTARY SCHOOL. (OCCUPANCY GROUP E-1; TYPE IIA CONSTRUCTION) | $2,940,000 |
| 101064230 | 2025-07-03 | General construction | 3542 S WASHTENAW AVE | ELEVATOR ADDITION AND ASSOCIATED RENOVATION WORK | $1,800,000 |
| 101064230 | 2025-07-03 | General construction | 3542 S WASHTENAW AVE | ELEVATOR ADDITION AND ASSOCIATED RENOVATION WORK | $1,800,000 |
| 101065157 | 2025-06-25 | General construction | 801 E 133RD PL | EXISTING SCHOOL NO CHANGE IN USE. RENOVATIONS INCLUDE PLUMBING MECHANICAL ELECTRCAL FIRE ALARM ARCHITECTURAL AND ROOFING REPLACEMENT. | $9,550,000 |
| 101061936 | 2025-06-10 | General construction | 247 W 23RD PL | CHICAGO PUBLIC SCHOOLS - NO CHANGE IN USE: INTERIOR ALTERATIONS TO EXISTING PRE-K CLASSROOM LOCATED ON FIRST FLOOR. NO CHANGE TO DEMISING WALLS OR COMMON AREAS. NO CHANGES TO EXT | $290,000 |
| 101061938 | 2025-06-10 | General construction | 249 E 37TH ST | CHICAGO PUBLIC SCHOOLS - NO CHANGE IN USE. INTERIOR ALTERATIONS TO EXISTING PRE-K CLASSROOMS LOCATED ON FIRST FLOOR. NO CHANGE TO DEMISING WALLS OR COMMON AREAS. CHICAGO PUBLIC SC | $474,000 |
| 101063551 | 2025-06-03 | General construction | 4420 S SACRAMENTO AVE | SPR 2019 CBRC: CONSTRUCT NEW 3 STORY ELEVATOR AND STAIR ENCLOSURE ADDITTION TO AN EXISTING PUBLIC SCHOOL PER PLANS AND STRUCTURAL PEER REVIEW REPRT. (USE GROUP E1 CONSTRUCTION TYPE | $1,200,000 |
| 101063536 | 2025-06-03 | General construction | 1746 S MILLER ST | SELF-CERT 2019 CBRC: 3 STORY EXISTING CPS SCHOOL. SCOPE INCLUDES: 2 VAN ACCESSIBLE PARKING SPACES; NEW CONCRETE FLATWORK & ACCESSIBLE RAMP AT DOOR 2; REPLACE EXISTING RAMP, FENCE A | $750,000 |
| 101065727 | 2025-06-02 | General construction | 801 E 133RD PL | EXISTING SCHOOL AND NO CHANGE IN USE SCHOOL OCCUPANCY TO REMAIN. INTERIOR FINISHES UPGRADES , ADDITIONAL ACCESSIBLE RAMP. | $3,350,000 |
| 101063809 | 2025-05-20 | General construction | 4959 S ARCHER AVE | SELF-CERT 2019 CBRC: ALTERATIONS TO EXISTING ELEVATOR LOBBY AREAS ON LOWER LEVEL THRU ROOF LEVEL AND MECHANICAL AND ELECTRICAL WORK IN EXISTING ELEVATOR MACHINE ROOM (USE GROUP E1 | $700,000 |
| 101067609 | 2025-05-12 | General construction | 936 N ASHLAND AVE | CURRENT GYMNASIUM AND OFFICE ROOM NEXT TO IT IN THIRD FLOOR SOUTHEAST CORNER IS BEING CONVERTED IN TO A DANCE STUDIO AND SUPPORTING ROOMS. | $1,477,000 |
| 101063624 | 2025-05-12 | General construction | 512 S LAVERGNE AVE | SELF-CERT 2019 CBRC: ALTERATIONS TO 1 MAIN OFFICE, 1 BOY'S TOILET, 1 GIRL'S TOILET, AND 1 ALL-GENDER TOILET IN 3 STORY CPS SCHOOL BUILDING.ND REPAVING THE EXTERIOR PARKING LOT (NO | $513,000 |
| 101063989 | 2025-05-09 | General construction | 4355 N LINDER AVE | SELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO 2 ALL-GENDER TOILETS IN A 2 STORY CPS SCHOOL BUILDING (OCCUPANCY GROUP E-1, TYPE IA CONSTRUCTION). NO EXTERIOR WORK. | $24,900 |
| 101067798 | 2025-05-09 | General construction | 1628 W WASHINGTON BLVD | SELF-CERT 2019 CBRC: CHICAGO PUBLIC SCHOOL FACILITY. NO CHANGE IN USE. OFFICE AREA RENOVATION. NEW FINISHES. | $2,500,000 |
| 101063998 | 2025-05-08 | General construction | 7507 W BIRCHWOOD AVE | SC 2019 CBRC: INTERIOR ALTERATIONS TO 1 MAIN OFFICE, 1 EXISTING TOILET, AND 1 ALL-GENDER TOILET IN A ONE-STORY CPS SCHOOL BUILDING. WORK INCLUDES AN ACCESSIBLE ENTRANCE TO THE EXIS | $635,000 |
| 101063976 | 2025-05-08 | General construction | 3937 W WILCOX ST | 2019 CBRC: INTERIOR ALTERATIONS TO 1 MAIN OFFICE, 2 TOILET ROOMS, AND 1 ALL-GENDER TOILET IN A THREE-STORY CPS SCHOOL BUILDING. WORK INCLUDES AN ACCESSIBLE ENTRANCE TO THE EXISTING | $547,000 |
| 101067594 | 2025-05-07 | General construction | 2815 S KOMENSKY AVE | ELF-CERT 2019 CBRC: CONSTRUCT NEW INTERIOR ELEVATOR SHAFT, INTERIOR ALTERATIONS TO EXISTING CLASSROOMS CONFERENCE ROOM STORAGE ROOMS AND OFFICE SPACES ON LOWER LEVEL, 1ST, 2ND, AND | $3,000,000 |
| 101067594 | 2025-05-07 | General construction | 2815 S KOMENSKY AVE | ELF-CERT 2019 CBRC: CONSTRUCT NEW INTERIOR ELEVATOR SHAFT, INTERIOR ALTERATIONS TO EXISTING CLASSROOMS CONFERENCE ROOM STORAGE ROOMS AND OFFICE SPACES ON LOWER LEVEL, 1ST, 2ND, AND | $3,000,000 |
| 101063228 | 2025-04-09 | General construction | 5025 N LARAMIE AVE | RENOVATIONS OF EXISTING TOILET ROOMS IN EXISTING ELEMENTARY SCHOOL (BEAUBIEN). | $1,005,150 |
| 101064535 | 2025-04-09 | General construction | 3252 N BROADWAY | SELF-CERT 2019 CBRC: ALTERATION AND REPAIR TO THE 3-STORY SCHOOL BUILDING TO REPLACE THE ENTIRE ROOF SYSTEM AND SELECT ROOF EQUIPMENT, REPAIR AND CLEAN THE MASONRY FAÇADE, AND ADD | $3,300,000 |
| 101063229 | 2025-04-02 | General construction | 3651 W SCHUBERT AVE | RENOVATION OF EXISTING TOILET ROOMS IN EXISTING PUBLIC ELEMENTARY SCHOOL (MONROE). | $483,162 |
| B200418082 | 2025-03-28 | General construction | 3425 N MAJOR AVE | IN KIND REPLACEMENT OF EXTERIOR RAIN SCREEN CEMENT BOARDS WITH NEW METAL SIDING. LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 NON-RESIDENTIAL UNIT(S), EXTERIOR WORK, EXTERIOR FACADE CLADDIN | $225,000 |
| 101052848 | 2025-02-24 | General construction | 4332 N PAULINA ST | SELF-CERT 2019 CBRC: CHICAGO PUBLIC SCHOOL FACILITY. NO CHANGE IN USE. LOCALIZED TOILET ROOM REPAIRS AND MODIFICATIONS. SELF CERTIFICATION. | $272,000 |
| B200414125 | 2025-02-21 | General construction | 3245 N CAMPBELL AVE | FOR PERMIT B200023908: REPLACEMENT GENERAL CONTRACTOR. NEW CONTRACTOR(S) LISTED UNDER "OTHER APPLICANTS AND CONTRACTORS" ON PERMIT CERTIFICATE. | |
| B200414128 | 2025-02-21 | General construction | 3245 N CAMPBELL AVE | FOR PERMIT B200023718: REPLACEMENT GENERAL CONTRACTOR. NEW CONTRACTOR(S) LISTED UNDER "OTHER APPLICANTS AND CONTRACTORS" ON PERMIT CERTIFICATE. | |
| 101054303 | 2024-08-22 | General construction | 2850 W 24TH BLVD | RENOVATION TO EXISTING INTERIOR CLASSROOM TYPE E2 SCHOOL OCCUPANCY. REPLACEMENT OF DOORS, NEW DOOR OPENING, NEW WINDOW AC UNITS AND INTERIOR FINISHES, PLUMBING REPLACEMENT AND ELEC | $300,000 |
| B200018814 | 2024-07-12 | General construction | 2301 W 21ST PL | HYDRONIC PIPING EXTENSION/RECONFIGURATION, REPAIR/REPLACEMENT AFFECTING 1 SYSTEMS : 1 CHILLER(CARRIER, 30RC- 15255356, ROOF) . ELECTRICAL WORK UNDER THIS PERMIT = YES . LOCATIONS | $737,000 |
| 101048134 | 2024-05-29 | General construction | 8522 S LAFAYETTE AVE | SELF CERTIFICATION - PERSPECTIVES CHARTER SCHOOL - INTERIOR RENOVATION OF EXISTING INTERIOR SPACE INTO CLASSROOMS, LUNCHROOM, AND RESTROOMS. FULLY SPRINKLERED BUILDING - E-1 OCC.- | $3,500,000 |
| 101028357 | 2024-05-03 | General construction | 2863 E 76TH ST | SPR 2019 CBRC RENOVATION TO AN EXISTING MARINE GARAGE AND HANDBALL COURT FACILITY. INTERIOR RENOVATION TO INCLUDE NEW PROGRAMMING LAYOUT (RESTROOM FACILITIES, MULTI-PURPOSE SPACE). | $1,700,000 |
| 101048375 | 2024-04-24 | General construction | 8522 S LAFAYETTE AVE | SELF CERT 2019 CBRC: INTERIOR DEMOLITION TO EXISTING SCHOOL. WORK TO INCLUDE DEMO OF NON LOAD BEARING PARTITIONS, OVERHEAD DOORS AND LOADING DOCKS. NO MEP WORK. (1B CONSTRUCTION TY | $250,000 |
| 101032475 | 2023-09-21 | General construction | 2131 W MONROE ST | PBC-CPS - 05445: THE PROJECT WILL CONSIST OF A RENOVATION OF THE EXISTING ROBERT NATHANIEL DETT ELEMENTARY SCHOOL AND CONSTRUCTION OF A GYMNASIUM ANNEX. THE CURRENT BUILDING'S USE | $28,491,000 |
| 101032475 | 2023-09-21 | General construction | 2131 W MONROE ST | PBC-CPS - 05445: THE PROJECT WILL CONSIST OF A RENOVATION OF THE EXISTING ROBERT NATHANIEL DETT ELEMENTARY SCHOOL AND CONSTRUCTION OF A GYMNASIUM ANNEX. THE CURRENT BUILDING'S USE | $28,491,000 |
| 101025784 | 2023-07-28 | General construction | 2131 W MONROE ST | PBC-CPS - 05445: THE PROJECT WILL CONSIST OF A RENOVATION OF THE EXISTING ROBERT NATHANIEL DETT ELEMENTARY SCHOOL AND CONSTRUCTION OF A GYMNASIUM ANNEX. THE CURRENT BUILDING'S USE | $25,000,000 |
| 101025784 | 2023-07-28 | General construction | 2131 W MONROE ST | PBC-CPS - 05445: THE PROJECT WILL CONSIST OF A RENOVATION OF THE EXISTING ROBERT NATHANIEL DETT ELEMENTARY SCHOOL AND CONSTRUCTION OF A GYMNASIUM ANNEX. THE CURRENT BUILDING'S USE | $25,000,000 |
| 101010176 | 2023-07-27 | General construction | 5411 W FULLERTON AVE | CPS SCHOOL - SELF CERT ALTERATIONS, NO CHANGE IN USE - MECHANICAL UPGRADES | $13,000,000 |
| 101016398 | 2023-06-26 | General construction | 8522 S LAFAYETTE AVE | SELF CERTIFICATION PERMIT - CHICAGO PUBLIC SCHOOLS - PERSPECTIVES CHARTER SCHOOL - INTERIOR RENOVATION OF EXISTING INTERIOR SPACE INTO OFFICES, MULTI-PURPOSE ROOM, AND WEIGHT ROOM. | $700,000 |
| 101011174 | 2023-06-26 | General construction | 8522 S LAFAYETTE AVE | SELF CERTIFICATION - PERSPECTIVES CHARTER SCHOOL - INTERIOR RENOVATION OF EXISTING INTERIOR SPACE INTO CLASSROOMS, OFFICES, MULTIPURPOSE ROOM, AND EXPANSION OF EXISTING RESTROOMS | $1,000,000 |
| 101005044 | 2023-05-04 | General construction | 6333 W BLOOMINGDALE AVE | REMODELING OF EXISTING 1ST FLOOR TOILET ROOMS, MAIN OFFICE TRANSACTION COUNTERS, AND RAMP FOR ACCESSIBILITY AT EXISTING C-3 OCCUPANCY ELEMENTARY SCHOOL. | $336,500 |
| 101005041 | 2023-05-04 | General construction | 3020 N LAMON AVE | REMODELING OF EXISTING 1ST FLOOR TOILET ROOMS, MAIN OFFICE TRANSACTION COUNTER, ENTRY DOORS, AND RAMP FOR ACCESSIBILITY AT EXISTING C-3 OCCUPANCY ELEMENTARY SCHOOL. | $211,100 |
| 101005702 | 2023-04-27 | General construction | 8716 S WALLACE ST | 2019 REHAB CODE: INTERIOR ALTERATIONS TO EXISTING BATH ROOMS "CPS SCHOOL" AND "NO CHANGE IN USE". 3 STORIES. ZONING DISTRICT RS-2; OCCUPANCY CLASSIFICATION C-3 SCHOOL. CONSTRUCTION | $456,000 |
| 101005702 | 2023-04-27 | General construction | 8716 S WALLACE ST | 2019 REHAB CODE: INTERIOR ALTERATIONS TO EXISTING BATH ROOMS "CPS SCHOOL" AND "NO CHANGE IN USE". 3 STORIES. ZONING DISTRICT RS-2; OCCUPANCY CLASSIFICATION C-3 SCHOOL. CONSTRUCTION | $456,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Chicago permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
