COMPANY RECORD · CHICAGO, IL

Qu-Bar, Inc — permit history in Chicago, IL

Qu-Bar, Inc appears on 253 Chicago permit records from 2006 through 2026, all of them mechanical / hvac.

Permit categories

CategoryPermitsShare
Mechanical / HVAC310100%

Activity by year

YearPermits issued
200621
200714
200818
200912
201015
201130
201216
201330
201413
20159
20165
201722
201820
201913
202020
20217
202212
20239
20247
202512
20265

Busiest year on record: 2011, with 30 permits. One project can account for several filings, so read this as filing activity rather than workload.

Named on the same permit

Name in sourceLinked permitsLast seen
Friedler Construction Company632026-06-17
B.E.T.O.N. Construction Co.402026-04-08
All-Bry Construction Company272026-04-09
Blinderman Construction Co., Inc.262025-04-15
Path Construction Company, Inc252024-04-23
K.R. Miller Contractors, Inc.232013-08-02
Sandsmith Construction Inc.222024-04-23
Mbb Enterprises Of Chicago, In192018-05-01
Reliable & Associates Construction Co172020-08-05
Rasco Mason Contractors, Inc.142022-08-03
Chicago Commercial Contractors, LLC132011-09-08
Clarke Hockney122023-07-18

106 companies are named alongside Qu-Bar, Inc on the same Chicago permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
3200 S CALUMET AVE2026-07-21
2100 E 87TH ST2026-06-17
644 W 71ST ST2026-04-09
7141 S MORGAN ST2026-04-08
4865 N SHERIDAN RD2025-06-10
3825 S WASHTENAW AVE2025-06-03
2745 W ROOSEVELT RD2025-05-28
5250 S ROCKWELL ST2025-05-14
5024 S WOLCOTT AVE2025-04-17
4251 N CLARENDON AVE2025-04-16
2347 S WABASH AVE2025-04-15
7831 S PRAIRIE AVE2025-04-15
4136 S CALIFORNIA AVE2025-04-10
6543 S CHAMPLAIN AVE2025-04-01

220 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1 to $113,000,000, median $1,700,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

253 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
1010802152026-07-21Mechanical / HVAC3200 S CALUMET AVEROOF REPLACEMENT, CHILLER ENCLOSURE ADDITION AND MEP UPGRADES TO 3-STORY MASONRY SCHOOL BUILDING.$10,367,000
1010830242026-06-17Mechanical / HVAC2100 E 87TH STCPS SCHOOL - NO CHANGE IN USE. INTERIOR RENOVATIONS AT CHICAGO VOCATIONAL CAREER ACADEMY (CVCA), CURRENT USE/OCCUPANCY SCHOOL E-1, PROPOSED USE/OCCUPANCY SCHOOL E-1, INCLUDES POOL $4,928,800
1010830242026-06-17Mechanical / HVAC2100 E 87TH STCPS SCHOOL - NO CHANGE IN USE. INTERIOR RENOVATIONS AT CHICAGO VOCATIONAL CAREER ACADEMY (CVCA), CURRENT USE/OCCUPANCY SCHOOL E-1, PROPOSED USE/OCCUPANCY SCHOOL E-1, INCLUDES POOL $4,928,800
1010773172026-04-09Mechanical / HVAC644 W 71ST STROOF REPLACEMENT PROJECT WITH MINOR MECHANICAL REPLACEMENT WORK.$2,300,000
1010786722026-04-08Mechanical / HVAC7141 S MORGAN STSELF-CERT 2019 CRBC - CPS SCHOOL - NO CHANGE IN USE. EXCEL ACADAMY OF ENGLEWOOD. M.E.P. IMPROVEMENTS AT EXISTING TWO-STORY BRICK SCHOOL BUILDING$3,308,821
1010685082025-06-10Mechanical / HVAC4865 N SHERIDAN RDSC 2019 CBRC: ALTERATIONS TO 2-STORY SCHOOL BUILDING INCLUDING ROOF REPLACEMENT AND MECHANICAL, ELECTRICAL, PLUMBING SYSTEM WORK ASSOCIATED WITH ROOF REPLACEMENT. SELECTIVE MASONRY$2,000,000
1010665922025-06-03Mechanical / HVAC3825 S WASHTENAW AVESC 2019 CBC: ROOF REPLACEMENT AT ALL EXISTING ROOFS AND MECHANICAL UPGRADES TO THE BUILDING AT AN EXISTING CPS ELEMENTARY SCHOOL. ADD MECHANICAL VENTILATION AND EXHAUST TO THE MAIN$3,800,000
1010628792025-05-28Mechanical / HVAC2745 W ROOSEVELT RDSPR 2019: INTERIOR DEMOLITION, RENOVATION, ROOF REPLACEMENT, AND EXTERIOR PLAYGROUND REFINISHING OF 73,445SF ELEMENTARY SCHOOL, TWO STORIES ABOVE GRADE AND PARTIAL BASEMENT (OCCUPA$8,930,000
1010651832025-05-14Mechanical / HVAC5250 S ROCKWELL STSELF-CERT 2019 CRBC - CPS SCHOOL - NO CHANGE IN USE. FLORENCE NIGHTINGALE ELEMENTARY. ROOF REPLACEMENT, EXTERIOR RENOVATION, BOILER STACK HEIGHT REDUCTION AND M.E.P. UPGRADES AT E$7,335,000
1010652912025-04-17Mechanical / HVAC5024 S WOLCOTT AVESELF CERT PROJECT - CPS SCHOOL - NO CHANGE IN USE - RENOVATION OF ROOF MATERIAL AND ROOF MOUNTED MEP COMPONENTS.$2,346,000
1010613072025-04-16Mechanical / HVAC4251 N CLARENDON AVESC 2019 CBRC: CHICAGO PUBLIC SCHOOL - BRENNEMANN ELEMENTARY SCHOOL RENOVATION OF EXISTING 4 CLASSROOM ADDITION INCLUDING INTERIOR AND EXTERIOR FINISHES. MAIN BUILDING WORK LIMITED $4,000,000
1010624772025-04-15Mechanical / HVAC2347 S WABASH AVESC 2019 CBRC: CHICAGO PUBLIC SCHOOLS - RENOVATION OF AN EXISTING 4-CLASSROOM CHICAGO PUBLIC SCHOOLS MODULAR BUILDING, MINOR SITE WORK$3,000,000
1010654932025-04-15Mechanical / HVAC7831 S PRAIRIE AVESELF-CERT 2019 CBRC: CHICAGO PUBLIC SCHOOL FACILITY. NO CHANGE IN USE. LOCALIZED CLASSROOM MODIFICATIONS. NEW FINISHES.$1,704,000
1010647642025-04-10Mechanical / HVAC4136 S CALIFORNIA AVESELF-CERT 2019 CBRC: ALTERATIONS TO EXISTING OFFICE AREAS INCLUDING ALL ASSOCIATED MECHANICAL AND ELECTRICAL WORK AT 3 STORY SCHOOL. (OCCUPANCY GROUP E-1; TYPE IB CONSTRUCTION)$500,000
1010637882025-04-01Mechanical / HVAC6543 S CHAMPLAIN AVERENOVATION OF 1ST FLOOR GIRLS AND BOYS TOILET ROOMS, A NEW ALL-GENDER TOILET ROOM, ADA UPGRADES AT ENTRANCE #3, AND KEYLESS ACCESS. THE WORK ALSO INVOLVES MEP UPGRADES RELATED TO T$554,000
1010617772025-02-20Mechanical / HVAC1140 W 66TH STEXISTING CPS SCHOOL, NO CHANGE IN USE. RENOVATION OF (5) TOILET ROOMS, INCLUDING PLUMBING AND ELECTRICAL FIXTURES AND INTERIOR FINISHES, IN AN EXISTING ELEMENTARY SCHOOL.$350,000
1010405242025-01-09Mechanical / HVAC5411 N LUNA AVESELF-CERT 2019 CBRC: CPS SCHOOL PROJECT: NO CHANGE IN OCCUPANCY/USE (CURRENT OCCUPANCY: SCHOOL/E1; CURRENT CONSTRUCTION TYPE V-A) SELF-CERT 2019 IBC.RENOVATION OF EXISTING MODULAR $1,000,000
1010439882024-05-28Mechanical / HVAC1140 W 66TH STEXISTING CPS SCHOOL, NO CHANGE IN USE. ROOF REPLACEMENT, WINDOW REPLACEMENT, MASONRY REPAIRS AND INTERIOR RENOVATION OF AN EXISTING ELEMENTARY SCHOOL.$2,400,000
1010435912024-04-23Mechanical / HVAC4706 N MENARD AVESELF-CERT 2019 CBC-CPS SCHOOL - NO CHANGE IN USE-MODULAR BUILDING LIFE SAFETY UPGRADES AT ERNST PRUSSING ELEMENTARY SCHOOL$948,000
1010435902024-04-23Mechanical / HVAC4704 N MENARD AVESELF-CERT 2019 CBC-CPS SCHOOL - NO CHANGE IN USE-MODULAR BUILDINGS LIFE SAFETY UPGRADES AT ERNST PRUSSING ELEMENTARY SCHOOL$1,681,000
1010435892024-04-23Mechanical / HVAC3854 N NEW ENGLAND AVESELF-CERT 2019 CBC-CPS SCHOOL - NO CHANGE IN USE-MODULAR BUILDINGS LIFE SAFETY UPGRADES AT BRIDGE ELEMENTARY SCHOOL$509,000
1010435872024-04-23Mechanical / HVAC3838 N NEW ENGLAND AVESELF-CERT 2019 CBC-CPS SCHOOL - NO CHANGE IN USE-MODULAR BUILDINGS LIFE SAFETY UPGRADES AT BRIDGE ELEMENTARY SCHOOL$1,237,000
1010435732024-04-23Mechanical / HVAC3800 N NEW ENGLAND AVESELF-CERT 2019 CBC-CPS SCHOOL - NO CHANGE IN USE-MODULAR BUILDINGS RENOVATION AT BRIDGE ELEMENTARY SCHOOL$2,593,000
1010435782024-04-23Mechanical / HVAC4650 N MENARD AVESELF-CERT 2019 CBC-CPS SCHOOL - NO CHANGE IN USE-MODULAR BUILDINGS RENOVATION AT ERNST PRUSSING ELEMENTARY SCHOOL$2,935,000
1010124272023-07-18Mechanical / HVAC3116 W BELDEN AVESC 2019 CBRC: EXISTING CPS SCHOOL - NO CHANGE IN USE. ROOF REPAIR, WINDOW REPAIR, MASONRY REPAIRS, PLUMBING WORK, MECHANICAL WORK, ELECTRICAL WORK AND NEW EXTERIOR MECHANICAL EQUIP$7,500,000
1010083492023-05-05Mechanical / HVAC7350 S EVANS AVEPLUMBING PIPING REPLACEMENT, MECHANICAL UPGRADES, MINOR ELECTRICAL UPGRADES, FINISHES AT CPS SCHOOL.$800,000
1010083442023-05-04Mechanical / HVAC6938 S EAST END AVEMECHANICAL UPGRADES, MINOR ELECTRICAL UPGRADES, PLUMBING PIPING, FINISHES AT CPS SCHOOL.$800,000
1010046122023-05-04Mechanical / HVAC4934 S WABASH AVECPS SCHOOL - NO CHANGE IN USE. CURRENT OCCUPANCY IS E1 AND PROPOSED OCCUPANCY IS E1. SCOPE INCLUDES CONVERTING AND COMBINING CLASSROOMS INTO LARGER OFFICE SPACES, WITH NEW FINISHES$8,100,000
1010046122023-05-04Mechanical / HVAC4934 S WABASH AVECPS SCHOOL - NO CHANGE IN USE. CURRENT OCCUPANCY IS E1 AND PROPOSED OCCUPANCY IS E1. SCOPE INCLUDES CONVERTING AND COMBINING CLASSROOMS INTO LARGER OFFICE SPACES, WITH NEW FINISHES$8,100,000
1010051932023-04-07Mechanical / HVAC2410 S LEAVITT STSELF-CERT 2019 CBRC: CPS RUIZ SCHOOL, NO CHANGE IN USE, OCCUPANCY GROUP E-1 (TO REMAIN), TYPE I-B CONSTRUCTION (TO REMAIN). MEP BUILDING UPGRADES FOR 3-STORY BUILDING / 44FT IN HEI$4,641,000
1009976342023-02-23Mechanical / HVAC4747 S BISHOP STZONING RT-4 (NO CHANGE), E-1 EDUCATIONAL OCCUPANCY (NO CHANGE). INTERIOR RENOVATIONS INCLUDE ALTERATIONS TO MULTI-USER TOILET ROOMS, INSTALLATION OF AN ALL-GENDER TOILET ROOM, OFF$6,000,000
1010039802023-02-23Mechanical / HVAC2084 S CANALPORT AVECPS SCHOOL / NO CHANGE IN USE. ROOF REPAIR/REPLACEMENT. MECHANICAL SYSTEM UPGRADES. LIMITED INTERIOR FINISH REPLACEMENT.$3,319,000
1009976342023-02-23Mechanical / HVAC4747 S BISHOP STZONING RT-4 (NO CHANGE), E-1 EDUCATIONAL OCCUPANCY (NO CHANGE). INTERIOR RENOVATIONS INCLUDE ALTERATIONS TO MULTI-USER TOILET ROOMS, INSTALLATION OF AN ALL-GENDER TOILET ROOM, OFF$6,000,000
1009643752022-08-03Mechanical / HVAC4747 S BISHOP STEXISTING MASONRY PARAPET COPINGS, ROOFTOP EQUIPMENT, ROOF DRAINS, AND BUILT-UP ROOFING SYSTEM ARE TO BE DEMOLISHED IN THEIR ENTIRELY DOWN TO STRUCTURE AND REPLACED IN KIND. EXISTIN$950,000
1009643752022-08-03Mechanical / HVAC4747 S BISHOP STEXISTING MASONRY PARAPET COPINGS, ROOFTOP EQUIPMENT, ROOF DRAINS, AND BUILT-UP ROOFING SYSTEM ARE TO BE DEMOLISHED IN THEIR ENTIRELY DOWN TO STRUCTURE AND REPLACED IN KIND. EXISTIN$950,000
1009690742022-07-06Mechanical / HVAC512 S LAVERGNE AVEROOF REPLACEMENT, MECHANICAL UPGRADES INCLUDING NEW CHILLER, UNIT VENTILATOR REPLACEMENTS, LIGHTING REPLACEMENT, PLUMBING SUPPLY LINE REPLACEMENTS AND ARCHITECTURAL WORK RELATED RE$11,000,000
1009676632022-06-15Mechanical / HVAC431 N TROY STMEP UPGRADES TO INCLUDE REMOVAL OF EXISTING AHU, EF'S, WATER HEATERS AND INSTALLATION OF NEW EF'S, RTU, WATER HEATERS AND CHILLER AT GRADE W/ MASONRY ENCLOSURE, REPLACEMENT OF CEIL$7,063,800
1009587082022-05-20Mechanical / HVAC6634 W RAVEN STSELF-CERT 2019 CBRC - CHICAGO PUBLIC SCHOOLS - NO CHANGE IN OCCUPANCY OR USE - ROOF REPLACEMENT, ROOF DRAIN REPLACEMENT, PARAPET REPAIRS AND EXTENSION, EXTERIOR BUILDING LIGHTING R$2,000,000
1009650152022-05-10Mechanical / HVAC7411 S ABERDEEN STCPS SCHOOL WITH NO CHANGE IN USE: EXTERIOR ROOF REPLACEMENT, LINTEL REPLACEMENT IN KIND AND EXISTING PARKING LOT ASPHALT REPLACEMENT. INTERIOR RENOVATIONS TO EXISTING TOILET ROOMS$2,180,000
1009650002022-05-10Mechanical / HVAC7050 S MAY STCPS SCHOOL WITH NO CHANGE IN USE: EXTERIOR ROOF REPLACEMENT. INTERIOR RENOVATIONS TO EXISTING TOILET ROOMS. ELECTRICAL, MECHANICAL AND PLUMBING PER PLAN.$1,800,000
1009658342022-04-20Mechanical / HVAC955 W GARFIELD BLVDCPS SCHOOL (ELEMENTARY), ZONING:RT-4, NO CHANGE IN USE (E-1 EDUCATIONAL OCCUPANCY). SITE IMPROVEMENTS INCLUDE ALTERATIONS TO PROVIDE ACCESSIBLE PARKING STALLS AND THE REPLACEMENT $3,250,000
1009606232022-03-24Mechanical / HVAC2250 N CLIFTON AVECHICAGO PUBLIC SCHOOL FACILITY. NO CHANGE IN USE. NEW ROOFING SYSTEM. MISC. MASONRY REPAIRS. MISC. INTERIOR FINISHES.$2,800,000
1009580372022-03-10Mechanical / HVAC2345 S CHRISTIANA AVEROOFING REPLACEMENT, ROOF DRAINS, SOME WINDOWS, 3 CLASSROOM RENOVATIONS, FINISHES, SITE CONCRETE/RAMPS/STAIRS, LOCALIZED MASONRY TUCKPOINTING AND REPLACEMENT$6,000,000
1009593772022-03-02Mechanical / HVAC12607 S UNION AVECPS SCHOOL : INTERIOR CLASSROOM AND TOILET ROOM RENOVATION. WORK TO INCLUDE FINISHES, MILLWORK, AND REPLACEMENT OF PLUMBING FIXTURES IN THE TOILET ROOM, CLASSROOM SINK, AND DRINKIN$1
1009582082022-02-22Mechanical / HVAC917 W 88TH STCPS SCHOOL WITH NO CHANGE IN USE: SELF CERTIFICATION 2019 CBRC: INTERIOR RENOVATIONS TO AN EXISTING PUBLIC ELEMENTARY SCHOOL. MEP WORK INCLUDED AS PER PLANS. (OCCUPANY GROUP E-1; C$360,131
1009330402021-09-21Mechanical / HVAC3535 E 114TH STONE OCCUPIED SPACE - FINISHES, NEW ROOFTOP UNIT, ELECTRICAL WORK WITH PANEL, LOW VOLTAGE AND COMMUNICATIONS DEVICES, ROOF HYDRANT$400,000
1009216812021-06-29Mechanical / HVAC3535 E 114TH STSELF-CERT PERMIT, CHICAGO PUBLIC SCHOOLS, ROOF REPLACEMENT, EXHAUST FAN REPLACEMENT, MINOR INTERIOR FINISHES$4,000,000
1009105722021-06-11Mechanical / HVAC3010 S PARNELL AVECPS SCHOOL. NO CHANGE OF USE, EXISTING/PROPOSED ELEMENTARY SCHOOL/E-1. WORK INCLUDES MECHANICAL UPGRADES AND REPLACEMENT, ELECTRICAL UPGRADES, PLUMBING UPGRADES, INTERIOR FINISHES,$4,425,565
1009156692021-05-14Mechanical / HVAC7240 S WABASH AVECPS SCHOOL / NO CHANGE IN USE. MEP UPGRADES AND INTERIOR RENOVATIONS.$2,136,000
1009098332021-04-15Mechanical / HVAC3319 N CLIFTON AVECPS ELEMENTARY SCHOOL WITH NO CHANGE IN OCCUPANCY USE: INTERIOR FINISHES, ROOFING REPLACEMENT, EXTERIOR MASONRY RESTORATION, LIMITED PLUMBING RELATED TO ROOFING SCOPE, LIMITED MECH$2,685,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Chicago permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →