COMPANY RECORD · CHICAGO, IL
Friedler Construction Company — permit history in Chicago, IL
Friedler Construction Company appears on 249 Chicago permit records from 2006 through 2026, most often general construction (99.6% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 249 | 99.6% |
| Mechanical / HVAC | 1 | 0.4% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2006 | 13 |
| 2007 | 19 |
| 2008 | 23 |
| 2009 | 8 |
| 2010 | 12 |
| 2011 | 11 |
| 2012 | 8 |
| 2013 | 14 |
| 2014 | 9 |
| 2015 | 6 |
| 2016 | 3 |
| 2017 | 18 |
| 2018 | 7 |
| 2019 | 8 |
| 2020 | 11 |
| 2021 | 17 |
| 2022 | 18 |
| 2023 | 27 |
| 2024 | 4 |
| 2025 | 9 |
| 2026 | 5 |
Busiest year on record: 2023, with 27 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Qu-Bar, Inc | 63 | 2026-06-17 |
| Drive Construction, Inc. | 38 | 2022-08-03 |
| Broadway Electric, Inc. | 28 | 2023-04-24 |
| Northwoods, Inc | 21 | 2009-08-07 |
| Horizon Contractors, Inc. | 19 | 2025-06-10 |
| Jin Electric Company | 17 | 2009-08-07 |
| Pl195447-Plumbing Systems, Inc | 16 | 2008-06-16 |
| Plumbing Systems, Inc. | 15 | 2012-06-11 |
| Chi-Town Plumbers Inc | 14 | 2026-07-21 |
| Rj Olmen | 12 | 2026-07-21 |
| J M Polcurr, Inc. | 12 | 2015-12-01 |
| Best Plumbing, Inc. | 11 | 2015-12-01 |
108 companies are named alongside Friedler Construction Company on the same Chicago permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 5515 S LOWE AVE | 2026-07-21 |
| 2100 E 87TH ST | 2026-06-17 |
| 749 S OAKLEY BLVD | 2026-06-15 |
| 1734 N ORLEANS ST | 2026-05-14 |
| 7141 S MORGAN ST | 2026-04-08 |
| 3111 W 15TH ST | 2025-06-30 |
| 4865 N SHERIDAN RD | 2025-06-10 |
| 1420 S ALBANY AVE | 2025-05-19 |
| 4251 N CLARENDON AVE | 2025-04-16 |
| 730 N PULASKI RD | 2025-03-25 |
| 1440 S CHRISTIANA AVE | 2025-03-24 |
| 3535 E 114TH ST | 2025-02-21 |
| 5411 N LUNA AVE | 2025-01-09 |
| 2148 N LONG AVE | 2024-06-27 |
215 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $113,000,000, median $1,094,250. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
249 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 101080975 | 2026-07-21 | General construction | 5515 S LOWE AVE | SELF-CERT 2019 CBRC: ROOFING REPLACEMENT WITH SELECT MEP INTERVENTION REQUIREMENTS, REMOVE AND REPLACE 2 EXISTING EXTERIOR EXIT STAIRS. STRUCTURAL PEER REVIEW REPORT. | $5,300,000 |
| 101083024 | 2026-06-17 | General construction | 2100 E 87TH ST | CPS SCHOOL - NO CHANGE IN USE. INTERIOR RENOVATIONS AT CHICAGO VOCATIONAL CAREER ACADEMY (CVCA), CURRENT USE/OCCUPANCY SCHOOL E-1, PROPOSED USE/OCCUPANCY SCHOOL E-1, INCLUDES POOL | $4,928,800 |
| 101081466 | 2026-06-15 | General construction | 749 S OAKLEY BLVD | SELF-CERT 2019 CBC INTERIOR ALTERATION ON ALL 3 STORIES OF THE BUILDING AND MINOR MASONRY WORK ON EXTERIOR. OCCUPANCY GROUPS E. BUILDING TYPE IIA CONSTRUCTION. | $4,500,000 |
| 101079062 | 2026-05-14 | General construction | 1734 N ORLEANS ST | SELF-CERT 2019 CBRC: REPLACEMENT OF HVAC SYSTEM AND STEAM BOILERS, PATCHING OF WALLS, FLOORS, CEILING AFFECTED BY MEP WORK | $4,654,000 |
| 101078672 | 2026-04-08 | General construction | 7141 S MORGAN ST | SELF-CERT 2019 CRBC - CPS SCHOOL - NO CHANGE IN USE. EXCEL ACADAMY OF ENGLEWOOD. M.E.P. IMPROVEMENTS AT EXISTING TWO-STORY BRICK SCHOOL BUILDING | $3,308,821 |
| 101063305 | 2025-06-30 | General construction | 3111 W 15TH ST | SELF-CERT 2019 CBRC: CPS SCHOOL; NO CHANGE IN USE. ALTERATION TO EXISTING 1 STORY ANNEX BUILDING OF EXISTING JOHNSON ELEMENTARY SCHOOL. THE PROJECT INCLUDES PAINT TO CLASSROOM WALL | $1 |
| 101063305 | 2025-06-30 | Mechanical / HVAC | 3111 W 15TH ST | SELF-CERT 2019 CBRC: CPS SCHOOL; NO CHANGE IN USE. ALTERATION TO EXISTING 1 STORY ANNEX BUILDING OF EXISTING JOHNSON ELEMENTARY SCHOOL. THE PROJECT INCLUDES PAINT TO CLASSROOM WALL | $1 |
| 101068508 | 2025-06-10 | General construction | 4865 N SHERIDAN RD | SC 2019 CBRC: ALTERATIONS TO 2-STORY SCHOOL BUILDING INCLUDING ROOF REPLACEMENT AND MECHANICAL, ELECTRICAL, PLUMBING SYSTEM WORK ASSOCIATED WITH ROOF REPLACEMENT. SELECTIVE MASONRY | $2,000,000 |
| 101057140 | 2025-05-19 | General construction | 1420 S ALBANY AVE | SELF-CERT 2019 CBRC: ALTERATION TO EXISTING 4 STORY ELEMENTARY SCHOOL AND ADJACENT 1 STORY ANNEX. THE PROJECT WILL UPDATE FLOOR, WALL, AND CEILING FINISHES OF CLASSROOMS AND CORRID | $8,650,000 |
| 101061307 | 2025-04-16 | General construction | 4251 N CLARENDON AVE | SC 2019 CBRC: CHICAGO PUBLIC SCHOOL - BRENNEMANN ELEMENTARY SCHOOL RENOVATION OF EXISTING 4 CLASSROOM ADDITION INCLUDING INTERIOR AND EXTERIOR FINISHES. MAIN BUILDING WORK LIMITED | $4,000,000 |
| 101064900 | 2025-03-25 | General construction | 730 N PULASKI RD | CURRENT USE IS E1, PROPOSED USE IS E1. SCOPE INCLUDES REPAIRING/REPLACING ROOFS, REPAIRING MASONRY, REPLACING LIGHTING, REPAIRING/REPLACING VTRS AND ROOF DRAINS, AND SELECTIVE INTE | $1,956,000 |
| 101064896 | 2025-03-24 | General construction | 1440 S CHRISTIANA AVE | CURRENT USE IS E1, PROPOSED USE IS E1. SCOPE INCLUDES REPAIRING/REPLACING ROOFS, REPAIRING MASONRY, REPLACING EXHAUST FANS, REPLACING LIGHTING, REPAIRING/REPLACING VTRS AND ROOF DR | $2,505,000 |
| 101064333 | 2025-02-21 | General construction | 3535 E 114TH ST | SC 2019 CBRC: CHICAGO PUBLIC SCHOOLS - INTERIOR SELECT CORRIDOR CEILING, LIGHTING, AND LOW VOLTAGE REPLACEMENT, MINOR PAINTING | $1,300,000 |
| 101040524 | 2025-01-09 | General construction | 5411 N LUNA AVE | SELF-CERT 2019 CBRC: CPS SCHOOL PROJECT: NO CHANGE IN OCCUPANCY/USE (CURRENT OCCUPANCY: SCHOOL/E1; CURRENT CONSTRUCTION TYPE V-A) SELF-CERT 2019 IBC.RENOVATION OF EXISTING MODULAR | $1,000,000 |
| 101029374 | 2024-06-27 | General construction | 2148 N LONG AVE | **SPR, 2019 CBRC** NEW PARKING LOT AND HARD SURFACE WITHIN EXTENTS OF EXISTING PARKING LOT AREA. (OCCUPANCY GROUP E-1; CONSTRUCTION TYPE 1-B) | $1 |
| 101042679 | 2024-06-05 | General construction | 2150 S LAFLIN ST | CPS HIGH SCHOOL WITH NO CHANGE IN USE (GROUP E). SCOPE INCLUDES RENOVATION OF EXISTING NATATORIUM FACILITIES INCLUDING NEW POOL EQUIPMENT AND FINISHES. ADJACENT LOCKER ROOMS AND T | $4,500,000 |
| 101042909 | 2024-04-08 | General construction | 225 W EVERGREEN AVE | CPS SCHOOL: SELF-CERTIFICATION, 2019 CBRC, NO CHANGE IN USE (ZONING RM-5, E-1 EDUCATIONAL OCCUPANCY). INTERIOR ALTERATIONS TO EXISTING TOILET ROOMS AND SELECTIVE DRINKING FOUNTAIN | $1,500,000 |
| 101011480 | 2024-02-13 | General construction | 5501 N KEDZIE AVE | **SPR, 2019 CBRC** EXTERIOR IMPROVEMENTS INCLUDING NEW ARTIFICIAL TURF PLAY FIELD; BLEACHERS, SPORTS LIGHTING; AND LANDSCAPE AND PAVING IMPROVEMENTS. (OCCUPANCY E-1, CONSTRUCTION T | $3,500,000 |
| 101005849 | 2023-10-05 | General construction | 1035 W 74TH ST | INTERIOR RENOVATION OF EXISTING HOMESIDE BUILDING FOR ACCESSIBILITY UPGRADES AND CODE REQUIREMENTS. ADDITION OF NEW LOCKER ROOM BUILDING, NEW PARKING LOT ADDITION, NEW TRACK AND FI | $10,000,000 |
| 101019742 | 2023-09-12 | General construction | 5101 W HARRISON ST | SPR 2019 CBRC: NEW ARTIFICIAL TURF FIELD, NEW FOOTBALL FIELD (ARTIFICIAL TURF), PARKING RELOCATION, PARTIAL PAVEMENT REPLACEMENT, NEW DUMPSTER ENCLOSURE, NEW ORNAMENTAL FENCE AND G | $7,800,000 |
| 101006208 | 2023-07-21 | General construction | 330 E 133RD ST | SELF-CERT 2019 CBRC: INTERIOR AND EXTERIOR ALTERATIONS TO AN EXISTING PUBLIC SCHOOL TO REPAIR LASCAPING, FENCING, STEPS AND PAVED AREAS, ALTERATIONS, REPAIRS AND MECHANICAL UPGRADE | $2,800,000 |
| 101006231 | 2023-07-21 | General construction | 1710 E 93RD ST | SELF-CERT 2019 CBRC: INTERIOR AND EXTERIOR ALTERATIONS TO AN EXISTING PUBLIC SCHOOL TO REPAIR LASCAPING, FENCING, STEPS AND PAVED AREAS, REPLACE WINDOWS, ALTERATIONS, REPAIRS AND M | $4,400,000 |
| 101007399 | 2023-06-29 | General construction | 2332 S WESTERN AVE | SPR 2019 CBRC: NEW PLAYGROUND AREA, PARTIAL PAVEMENT REPLACEMENT, ADDITIONAL ADA PARKING SPACE AT CPS FINKL ACADEMY. EXTERIOR IMPROVEMENTS ONLY, NO INTERIOR SCOPE OF WORK. OCCUPANC | $601,000 |
| 101007330 | 2023-06-20 | General construction | 2620 S LAWNDALE AVE | SPR 2019 CBRC: REPLACE EXISTING PLAYGROUND, PARTIAL PAVEMENT AND ORNAMENTAL FENCE (5FT TALL) REPLACEMENT AT CPS LITTLE VILLAGE ACADEMY. EXTERIOR IMPROVEMENTS ONLY, NO INTERIOR SCOP | $439,000 |
| 100945242 | 2023-06-15 | General construction | 6150 S PRINCETON AVE | SPR 2019 CBC, EXTERIOR IMPROVEMENTS INCLUDING NEW DRIVER'S EDUCATION LOT AND LANDSCAPE RENOVATIONS TO AN EXISTING CPS HIGH SCHOOL LOT AS PER PLANS. | $778,000 |
| 100997348 | 2023-06-12 | General construction | 1414 E 61ST PL | EXTERIOR IMPROVEMENTS INCLUDING A NEW PLAY LOT, ASPHALT AND CONCRETE PAVING RENOVATIONS TO AN EXISTING ELEMENTARY SCHOOL. | $550,000 |
| 101002571 | 2023-06-06 | General construction | 5700 W BERTEAU AVE | SPR 2019 CBRC: REPLACE EXISTING PARKING (PAVEMENT, TREES, MARKINGS, ADA SIGNS) AT CPS RICKOVER NAVAL ACADEMY. EXTERIOR IMPROVEMENTS ONLY, NO INTERIOR SCOPE OF WORK. OCCUPANCY GROUP | $1,071,000 |
| 100945246 | 2023-05-24 | General construction | 8139 S NORMAL AVE | SPR 2019 CBC, EXTERIOR IMPROVEMENTS INCLUDING NEW DRIVER'S EDUCATION LOT AND LANDSCAPE RENOVATIONS TO AN EXISTING CPS HIGH SCHOOL LOT AS PER PLANS.AS PER PLANS . DRIVEWAY PERMIT # | $620,000 |
| 101005651 | 2023-05-23 | General construction | 1420 S ALBANY AVE | SPR 2019 CBRC: REPLACE EXISTING PLAYGROUND, PARTIAL PAVEMENT, PARTIAL REPLACEMENT OF ORNAMENTAL FENCE (5FT TALL) AT CPS JOHNSON SCHOOL OF EXCELLENCE. EXTERIOR IMPROVEMENTS ONLY, NO | $552,000 |
| 100961180 | 2023-05-22 | General construction | 1518 W GRANVILLE AVE | EXTERIOR IMPROVEMENTS INCLUDING A NEW ARTIFICIAL TURF FIELD, BASKETBALL, VOLLEYBALL, PAINTED GAMES, STORMWATER MANAGEMENT TO AN EXISTING ELEMENTARY SCHOOL. | $1,100,000 |
| 101007390 | 2023-05-19 | General construction | 2850 W 24TH BLVD | SPR 2019 CBRC: REPLACEMENT OF THE EXISTING PLAYGROUND AREA, PARTIAL PAVEMENT REPLACEMENT, PARTIAL REPLACEMENT OF THE ORNAMENTAL FENCE (5FT TALL), NEW ARTIFICIAL TURF FIELD AT CPS M | $877,000 |
| 100997781 | 2023-05-17 | General construction | 1330 E 50TH ST | SPR 2019 CBRC: REPLACE EXISTING PLAYGROUND AND PARTIAL PAVEMENT AREAS AT CPS SHOESMITH ELEMENTARY SCHOOL. EXTERIOR IMPROVEMENTS ONLY, NO SCOPE OF WORK ON THE EXISTING BUILDING. OCC | $592,800 |
| 100997350 | 2023-05-17 | General construction | 6657 S KIMBARK AVE | EXTERIOR IMPROVEMENTS INCLUDING A NEW PLAY LOT, ASPHALT AND CONCRETE PAVING, AND FENCING RENOVATIONS TO AN EXISTING ELEMENTARY SCHOOL. | $550,000 |
| 100999744 | 2023-05-11 | General construction | 3212 W GEORGE ST | SPR 2019 CBRC: REPLACE PLAYGROUND, PARTIAL PAVEMENT, AND PARKING RESTRIPPING AT CPS AVONDALE-LOGANDALE ELEMENTARY SCHOOL. EXTERIOR IMPROVEMENTS ONLY, NO INTERIOR SCOPE OF WORK. OC | $670,000 |
| 101004612 | 2023-05-04 | General construction | 4934 S WABASH AVE | CPS SCHOOL - NO CHANGE IN USE. CURRENT OCCUPANCY IS E1 AND PROPOSED OCCUPANCY IS E1. SCOPE INCLUDES CONVERTING AND COMBINING CLASSROOMS INTO LARGER OFFICE SPACES, WITH NEW FINISHES | $8,100,000 |
| 101005857 | 2023-04-24 | General construction | 3729 W LELAND AVE | CHICAGO PUBLIC SCHOOL, SELF-CERT PROJECT. NO CHANGE TO EXISTING C3, TYPE 1B SCHOOL OCCUPANCY TYPE (NOT CHANGE OF USE). RENOVATION TO EXISTING BUILDING (NO ADDITION) INCLUDING FINI | $3,000,000 |
| 101005641 | 2023-04-14 | General construction | 1424 N CLEAVER ST | SPR 2019 CBRC: REPLACE EXISTING PLAYGROUND, PARTIAL PAVEMENT, PARTIAL REPLACEMENT OF ORNAMENTAL FENCE (5FT TALL) AT CPS ROWE ELEMENTARY CHARTER SCHOOL (MAIN BUILDING). EXTERIOR IMP | $623,000 |
| 101005637 | 2023-04-11 | General construction | 2642 W 15TH PL | SPR 2019 CBRC: REPLACE AND EXPAND EXISTING PLAYGROUND AREA, PAVEMENT REPLACEMENT, PARTIAL REPLACEMENT OF THE ORNAMENTAL FENCE (5FT TALL) AT CPS PLAMONDON ES. EXTERIOR IMPROVEMENTS | $458,000 |
| 100956433 | 2023-03-28 | General construction | 1117 S CENTRAL AVE | SPR 2019 CBC INTERIOR RENOVATION OF EXISTING HOMESIDE BUILDING AND INTERIOR RENOVATIONS OF EXISTING VISITOR SIDE BUILDING TOILET ROOMS FOR ACCESSIBILITY UPGRADES & CODE REQUIREMEN | $5,900,000 |
| 100999741 | 2023-03-22 | General construction | 3501 W POTOMAC AVE | SPR 2019 CBRC: REPLACE PLAYGROUND, PARTIAL PAVEMENT, AND PARKING RESTRIPPING AT CPS CASALS ELEMENTARY SCHOOL. EXTERIOR IMPROVEMENTS ONLY, NO INTERIOR SCOPE OF WORK. OCCUPANCY GROU | $646,000 |
| 100957608 | 2023-03-16 | General construction | 5835 N LINCOLN AVE | **SPR, 2019 CBRC** SCOPE IS NEW PARKING LOT AND HARD SURFACE WITHIN EXTENTS OF EXISTING PARKING LOT AREA.(OCCUPANCY GROUP: E-1; CONSTRUCTION TYPE: 1-B) | $1,120,000 |
| 100997771 | 2023-02-23 | General construction | 5631 S KIMBARK AVE | SPR 2019 CBRC: REPLACE EXISTING PLAYGROUND, AND FENCE AT THE DUMPSTER AREA AT CPS RAY ELEMENTARY SCHOOL. EXTERIOR IMPROVEMENTS ONLY, NO INTERIOR SCOPE OF WORK. OCCUPANCY GROUP E-1 | $571,000 |
| 100997634 | 2023-02-23 | General construction | 4747 S BISHOP ST | ZONING RT-4 (NO CHANGE), E-1 EDUCATIONAL OCCUPANCY (NO CHANGE). INTERIOR RENOVATIONS INCLUDE ALTERATIONS TO MULTI-USER TOILET ROOMS, INSTALLATION OF AN ALL-GENDER TOILET ROOM, OFF | $6,000,000 |
| 100991723 | 2023-02-10 | General construction | 10347 S EWING AVE | SPR 2019 CBRC: REPLACE EXISTING PLAYGROUND, PARTIAL PAVEMENT AND FENCE AT CPS GALLISTEL LANGUAGE ACADEMY. EXTERIOR IMPROVEMENTS ONLY, NO INTERIOR SCOPE OF WORK. OCCUPANCY GROUP E-1 | $1,176,400 |
| 100997777 | 2023-02-06 | General construction | 707 E 37TH ST | SPR 2019 CBRC: REPLACE EXISTING PLAYGROUND, DUMPSTER ENCLOSURE AND PARTIAL PAVEMENT&ORNAMENTAL FENCE AT CPS UCHICAGO CHARTER DONOGHUE CAMPUS. EXTERIOR IMPROVEMENTS ONLY, NO INTERIO | $635,425 |
| 100928167 | 2022-11-01 | General construction | 4606 W MARQUETTE RD | SPR 2019 CBC: FULL PERMIT FOR VACANT LOT TO BE CONVERTED INTO OFF-SITE PARKING LOT TO BE USED BY CPS (AND CPD) WITH 78 PARKING STALLS (74 STANDARD + 4ADA). THE PROPOSED PARKING LOT | $1,500,000 |
| 100945234 | 2022-09-16 | General construction | 3044 S BONFIELD ST | SPR 2019 CBRC - PUBLIC PARK. NO OCCUPANCY CHANGES AND NO CHANGES TO THE EXISTING PARK BUILDING OTHER THAN TYING INTO THE EXISTING ELECTRICAL PANEL. THE PROJECT INCLUDES NEW CONCR | $1,095,520 |
| 100961184 | 2022-09-15 | General construction | 5411 W FULLERTON AVE | EXTERIOR IMPROVEMENTS INCLUDING TRACK AND FIELD, ARTIFICIAL TURF FIELD, AND SPORTS LIGHTING TO AN EXISTING STADIUM. | $5,000,000 |
| 100961332 | 2022-08-31 | General construction | 1104 W 31ST ST | SPR 2019 CBC CPS SCHOOL. NO CHANGE OF USE, EXISTING/PROPOSED ELEMENTARY SCHOOL/E-1. WORK INCLUDES SMALL ADDITION FOR ACCESSIBLE ELEVATOR, EXTERIOR ENVELOPE REPAIR, TOILET ROOM UPGR | $3,000,000 |
| 100962310 | 2022-08-30 | General construction | 1018 N LARAMIE AVE | SPR 2019 CBRC: REPLACE EXISTING PLAYGROUND, PARTIAL PAVEMENT AND DUMPSTER ENCLOSURE AT CPS HAY COMMUNITY ACADEMY. EXTERIOR IMPROVEMENTS ONLY, NO INTERIOR SCOPE OF WORK. OCCUPANCY G | $418,646 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Chicago permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
