COMPANY RECORD · NEW YORK, NY
George Breslaw Plbng LLC — permit history in New York, NY
George Breslaw Plbng LLC appears on 160 New York permit records from 2019 through 2026, most often plumbing (84.2% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 160 | 84.2% |
| Fire protection | 30 | 15.8% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 10 |
| 2020 | 20 |
| 2021 | 28 |
| 2022 | 31 |
| 2023 | 37 |
| 2024 | 31 |
| 2025 | 16 |
| 2026 | 17 |
Busiest year on record: 2023, with 37 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Benchmark Builders LLC | 7 | 2025-11-25 |
| Clune Construction Co LP | 4 | 2026-02-25 |
| John Gallin & Son, Inc | 3 | 2025-06-12 |
| Core Four Construction In | 3 | 2025-12-22 |
| A.W. & S. Construction Co | 2 | 2024-03-04 |
| Tishman Interiors Corp | 2 | 2023-07-10 |
| Liebhaber Company Inc | 2 | 2025-12-12 |
| Wolf Construction Corp 20 | 2 | 2026-05-20 |
| Dk Construction One, Corp | 2 | 2024-06-20 |
| Accord Contr And Mgmt Cor | 1 | 2023-11-14 |
| Bura Construction Corp | 1 | 2025-06-27 |
| Richter & Ratner Contract | 1 | 2024-07-24 |
18 companies are named alongside George Breslaw Plbng LLC on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 229 WEST 43 STREET | 2026-08-04 |
| 437 MADISON AVENUE | 2026-07-14 |
| 777 3 AVENUE | 2026-07-09 |
| 1000 3 AVENUE | 2026-06-08 |
| 200 LIBERTY STREET | 2026-05-20 |
| 882 3 AVENUE | 2026-04-29 |
| 1251 6 AVENUE | 2026-04-06 |
| 4 BRYANT PARK | 2026-03-25 |
| 430 PARK AVENUE | 2026-02-25 |
| 1345 6 AVENUE | 2026-02-06 |
| 500 5 AVENUE | 2026-02-05 |
| 777 THIRD AVENUE | 2025-12-22 |
| 781 5 AVENUE | 2025-12-12 |
| 650 MADISON AVENUE | 2025-11-25 |
97 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,500 to $1,491,620, median $57,500. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
160 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01420961-S2-PL | 2026-08-04 | Plumbing | 229 WEST 43 STREET | PLUMBING TAKING PLACE ON FLOORS 7,11,12,14 AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY. | $40,632 |
| M01415043-I1-PL | 2026-07-14 | Plumbing | 437 MADISON AVENUE | Modification to Plumbing, Sprinkler and Standpipe Systems as per plans filed herewith. | $1,491,620 |
| M01415043-I1-PL | 2026-07-14 | Fire protection | 437 MADISON AVENUE | Modification to Plumbing, Sprinkler and Standpipe Systems as per plans filed herewith. | $1,491,620 |
| M01395442-S3-PL | 2026-07-09 | Plumbing | 777 3 AVENUE | REPLACE: 7LAVS,7WC&2URINALS ON EXISTING ROUGHING ON FLOORS 7,10,11&12. NEW: INSTALL 1 WC, 1 LAV , 1 HWH NON GAS, 1 WATER PIPING & 1 SANITARY PIPING ON FLOORS 7,10,11&12. | $35,000 |
| M01395706-S2-PL | 2026-06-15 | Plumbing | 437 MADISON AVENUE | REMOVE 1 SINK, 2 DISHWASHERS, 1 HWH NON GAS, WATER PIPING & SANITARY PIPING AND CAP LINES AT SOURCE AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $5,000 |
| M01212649-I1-PL | 2026-06-08 | Plumbing | 1000 3 AVENUE | Modification of sprinkler, standpipe and plumbing systems on 4th floor | $568,050 |
| M01212649-I1-PL | 2026-06-08 | Fire protection | 1000 3 AVENUE | Modification of sprinkler, standpipe and plumbing systems on 4th floor | $568,050 |
| M01336775-S4-PL | 2026-05-20 | Plumbing | 200 LIBERTY STREET | Plumbing work as shown on plans filed herewith for BPCA space. No change to use, egress or occupancy. | $30,000 |
| M01336113-S2-PL | 2026-05-20 | Plumbing | 200 LIBERTY STREET | Plumbing work as shown on plans filed herewith for PMO & Common Corridor . No change to use, egress or occupancy. | $15,000 |
| B01316693-S1-PL | 2026-04-29 | Plumbing | 882 3 AVENUE | HEREWITH FILING PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY | $30,000 |
| M01375622-I1-PL | 2026-04-06 | Plumbing | 1251 6 AVENUE | PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY. | $139,000 |
| M01237554-I1-PL | 2026-03-25 | Plumbing | 4 BRYANT PARK | Plumbing work on the 6th and 7th floor (Sony/Sharp) as indicated on drawings. | $50,000 |
| M01333224-I1-PL | 2026-02-25 | Plumbing | 229 WEST 43 STREET | PLUMBING MODIFICATIONS TAKING PLACE ON THE 11TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $13,200 |
| M01319269-S3-PL | 2026-02-25 | Plumbing | 430 PARK AVENUE | INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.. | $30,000 |
| M01326604-S2-PL | 2026-02-06 | Plumbing | 1345 6 AVENUE | Plumbing modifications taking place on the 9th floor as indicated on the drawings. | $275,000 |
| M01314623-S2-PL | 2026-02-05 | Plumbing | 500 5 AVENUE | Plumbing and Sprinkler scope associated with the renovation of the one-tenant office space on 34M/33C floor. No change of use, egress, or occupancy. | $161,000 |
| M01314623-S2-PL | 2026-02-05 | Fire protection | 500 5 AVENUE | Plumbing and Sprinkler scope associated with the renovation of the one-tenant office space on 34M/33C floor. No change of use, egress, or occupancy. | $161,000 |
| M01285552-S2-PL | 2025-12-22 | Plumbing | 777 THIRD AVENUE | REMOVE EXISTING PANTRY FIXTURES AND CAP LINES AT SOURCE. INSTALL 1 SINK, 1 DISHWASHER, 1 HWH NON GAS, 1 FUNNEL DRAIN, 1 WATER FILTER, 1 SANITARY PIPING & 1 WATER PIPING. | $20,000 |
| M01211891-S2-PL | 2025-12-17 | Plumbing | 437 MADISON AVENUE | INSTALL PLUMBING FIXTURES AND PIPING. | $575,000 |
| M01135374-S2-PL | 2025-12-12 | Plumbing | 781 5 AVENUE | Plumbing modifications to an existing apartment as per plans | $60,000 |
| M01187953-S2-PL | 2025-11-25 | Plumbing | 650 MADISON AVENUE | Interior alterations for the modifications to the Plumbing and Sprinkler systems on the 6th floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress. | $180,000 |
| M01187953-S2-PL | 2025-11-25 | Fire protection | 650 MADISON AVENUE | Interior alterations for the modifications to the Plumbing and Sprinkler systems on the 6th floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress. | $180,000 |
| M01224430-I1-PL | 2025-08-25 | Plumbing | 401 WEST 25 STREET | PLUMBING WORK ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGER, EGRESS, OR OCCUPANCY. | $22,500 |
| M01213503-S1-PL | 2025-06-27 | Plumbing | 142 EAST 16 STREET | PL WORK FILED IN APT 5D FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $12,500 |
| M01211350-S2-PL | 2025-06-12 | Plumbing | 747 3 AVENUE | REMOVE EXISTING PLUMBING FIXTURES AND CAP LINES AT SOURCE. | $25,000 |
| M01181223-I1-PL | 2025-04-18 | Plumbing | 1290 AVENUE OF THE AMERICAS | Plumbing demolition on part of the 34th floor (Linklaters) as indicated on drawings | $3,825 |
| M01187941-S2-PL | 2025-03-10 | Fire protection | 650 MADISON AVENUE | Modifications to the existing Sprinkler and Plumbing systems on the 5th and 7th floor as per plans submitted herewith. No Change to the Use, Occupancy or Egress. | $180,000 |
| M01187941-S2-PL | 2025-03-10 | Plumbing | 650 MADISON AVENUE | Modifications to the existing Sprinkler and Plumbing systems on the 5th and 7th floor as per plans submitted herewith. No Change to the Use, Occupancy or Egress. | $180,000 |
| M01166414-S2-PL | 2025-03-09 | Plumbing | 55 EAST 52 STREET | Plumbing Modifications taking place on the 35-37th floors as indicated on the drawings. (Build-out) 39-41st Marketing floors. | $565,000 |
| M01090084-I1-PL | 2025-02-13 | Plumbing | 463 SEVENTH AVENUE | Plumbing work on the 10th floor (bathrooms) as indicated on drawings. | $100,000 |
| M01141837-I1-PL | 2025-02-06 | Plumbing | 16 MADISON SQUARE WEST | Plumbing work on the 5th floor (6th floor CO) (The Lab) as indicated on drawings | $100,000 |
| M01098527-S2-PL | 2025-02-03 | Plumbing | 161 EAST 63 STREET | HEREWITH FILING PLUMBING DEMO WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $10,000 |
| M01135435-I1-PL | 2025-01-07 | Plumbing | 620 8 AVENUE | DATADOG-- REMOVAL OF PLUMBING FIXTURES WITH RELATED PIPING MODIFICATIONS; CAP LINES AS NEEDED. | $61,450 |
| M01130706-I1-PL | 2024-12-13 | Plumbing | 1 PENN PLAZA | Plumbing work on the 28th floor (Weaver & Tidwell) as indicated on drawings. | $40,756 |
| M01024008-I1-PL | 2024-10-31 | Plumbing | 317 EAST 34 STREET | Lobby renovations (323 E. 34th Street entrance) - Plumbing work on the 1st floor as indicated on drawings. | $15,000 |
| M01111691-S2-PL | 2024-10-07 | Plumbing | 650 MADISON AVENUE | Modifications to the existing Sprinkler and Plumbing systems as per plans submitted herewith. No Change to the Use, Occupancy or Egress. | $230,000 |
| M01111691-S2-PL | 2024-10-07 | Fire protection | 650 MADISON AVENUE | Modifications to the existing Sprinkler and Plumbing systems as per plans submitted herewith. No Change to the Use, Occupancy or Egress. | $230,000 |
| M01074833-I1-PL | 2024-09-04 | Plumbing | 770 BROADWAY | plumbing modifications taking place on the 13-15th floors as per plans filed herewith. No change in use, egress or occupancy | $70,000 |
| M00996528-S3-PL | 2024-07-24 | Plumbing | 10 HUDSON YARDS | Filing herewith for Plumbing modification and installation of plumbing fixtures and associated piping as per plans. No change to use, egress or occupancy. | $358,146 |
| M00993173-I1-PL | 2024-07-08 | Plumbing | 620 8 AVENUE | DATADOG ROOF- PLUMBING INSTALLATIONS RELATED TO ROOF TERRACE CONSTRUCTION. | $77,000 |
| M00979609-I1-PL | 2024-06-26 | Plumbing | 28 LIBERTY STREET | Plumbing removals and sprinkler temp loop installation as per plans filed herewith. No change to use, egress, or occupancy. | $24,000 |
| M00979609-I1-PL | 2024-06-26 | Fire protection | 28 LIBERTY STREET | Plumbing removals and sprinkler temp loop installation as per plans filed herewith. No change to use, egress, or occupancy. | $24,000 |
| M01042399-I1-PL | 2024-06-20 | Plumbing | 360 MADISON AVENUE | installation of plumbing fixtures along with related piping. | $135,000 |
| M00952543-S2-PL | 2024-06-20 | Plumbing | 51 MADISON AVENUE | Filing herewith plumbing and sprinkler work, pre build suites, in existing 30th floor space. No change in use, egress or occupancy. | $210,080 |
| M00952543-S2-PL | 2024-06-20 | Fire protection | 51 MADISON AVENUE | Filing herewith plumbing and sprinkler work, pre build suites, in existing 30th floor space. No change in use, egress or occupancy. | $210,080 |
| M01011718-I1-PL | 2024-06-12 | Plumbing | 111 EIGHTH AVENUE | Filing for installation of new floor drain as per plans filed herewith. No change in use, egress, or occupancy. | $35,200 |
| M00811986-I1-PL | 2024-06-12 | Plumbing | 2 GANSEVOORT STREET | REMOVE 2 SINKS, 7 WC, 6 LAVS, 2 URINALS & 2 SHOWERS AND CAP LINES AT SOURCE. | $35,000 |
| M01038896-I1-PL | 2024-06-06 | Plumbing | 4 WEST 40 STREET | Removal of plumbing fixtures, sprinkler heads and related piping as shown on plan. | $20,000 |
| M01038896-I1-PL | 2024-06-06 | Fire protection | 4 WEST 40 STREET | Removal of plumbing fixtures, sprinkler heads and related piping as shown on plan. | $20,000 |
| M01022108-I1-PL | 2024-05-20 | Plumbing | 28 LIBERTY STREET | Plumbing modifications as per plans filed herewith. No change to use, egress, occupancy | $210,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
