COMPANY RECORD · NEW YORK, NY
Dk Construction One, Corp — permit history in New York, NY
Dk Construction One, Corp appears on 230 New York permit records from 2019 through 2026, most often general construction (53.6% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 125 | 53.6% |
| Mechanical / HVAC | 108 | 46.4% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 2 |
| 2020 | 4 |
| 2021 | 28 |
| 2022 | 12 |
| 2023 | 31 |
| 2024 | 56 |
| 2025 | 46 |
| 2026 | 54 |
Busiest year on record: 2024, with 56 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Dependable Mech Corp | 34 | 2026-07-15 |
| Dependable Mechanical Cor | 31 | 2026-07-15 |
| George Breslaw Plbng LLC | 2 | 2024-06-20 |
| Sirina Fire Prot Corp | 2 | 2024-06-12 |
| P.S.I. Mechanical | 1 | 2023-03-07 |
| Plumbing Works Corp | 1 | 2025-07-16 |
| Wnw & Sons Plbg & Htg Inc | 1 | 2025-04-23 |
| Zatos Plbg And Htg Inc | 1 | 2026-03-17 |
8 companies are named alongside Dk Construction One, Corp on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 444 MADISON AVENUE | 2026-08-28 |
| 180 WATER STREET | 2026-08-27 |
| 40 WEST 35 STREET | 2026-08-14 |
| 41-20 39 STREET | 2026-07-28 |
| 51 WEST 52 STREET | 2026-07-14 |
| 485 FIFTH AVENUE | 2026-06-17 |
| 240 WEST 35 STREET | 2026-06-16 |
| 60 CHARLTON STREET | 2026-06-12 |
| 685 THIRD AVENUE | 2026-06-09 |
| 625 BROADWAY | 2026-05-11 |
| 132 WEST 31 STREET | 2026-04-30 |
| 630 FIFTH AVENUE | 2026-04-09 |
| 70 EAST 55 STREET | 2026-03-31 |
| 1369 BROADWAY | 2026-03-30 |
92 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,500 to $2,100,000, median $99,990. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
230 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01444167-I1-GC | 2026-08-28 | General construction | 444 MADISON AVENUE | General Construction for prebuild office renovation. Plumbing, mechanical, sprinkler filed as subsequent applications. No change to use, egress, or occupancy. | $418,000 |
| M01375346-I1-GC | 2026-08-27 | General construction | 180 WATER STREET | FILED HEREWITH TO RENOVATE EXISTING LOBBY TO INCLUDE MILLWORK AND NEW FINISHES. | $954,000 |
| M00998616-I1-GC | 2026-08-14 | General construction | 40 WEST 35 STREET | To extend one of the existing elevator shafts bulkhead to provide an elevator stop at existing Penthouse floor of an existing 12 story & Penthouse apartment Hotel. No proposed enl | $6,000 |
| Q01238894-I1-GC | 2026-07-28 | General construction | 41-20 39 STREET | HEREWITH FILE ALTERATION CO FOR THE CHANGE OF USE TO AN EXISTING FOUR-STORY, MIXED USED COMMERCIAL BUILDING TO COVERT THE FIRST FLOOR WAREHOUSE TO EATING AND DRINKING ESTABLISHMENT | $711,800 |
| M01384938-I1-GC | 2026-07-14 | General construction | 51 WEST 52 STREET | General Construction buildout to existing 8th floor office space as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress | $2,100,000 |
| M01401726-S1-MS | 2026-07-13 | Mechanical / HVAC | 51 WEST 52 STREET | Modifications to the existing Mechanical systems on the 13th and 14th floors as per plans submitted herewith. No Change to Use, Occupancy, or Egress. | $150,000 |
| M01406658-I1-MS | 2026-06-17 | Mechanical / HVAC | 485 FIFTH AVENUE | Replacement of existing rooftop unit with new | $50,000 |
| M01412966-I1-GC | 2026-06-16 | General construction | 240 WEST 35 STREET | Minor partition and lighting work in suite 405. No change to use, egress or occupancy. | $96,560 |
| M01400160-I1-GC | 2026-06-12 | General construction | 60 CHARLTON STREET | General construction modifications taking place on the 10th fl Construction/ 11th fl marketing as per plans filed herewith. No change in use, egress or occupancy | $900,000 |
| M01400160-S1-MS | 2026-06-12 | Mechanical / HVAC | 60 CHARLTON STREET | Mechanical modifications taking place on the 10th Construction / 11th marketing floor as per plans filed herewith. No change in use, egress or occupancy | $190,050 |
| M01401726-I1-GC | 2026-06-10 | General construction | 51 WEST 52 STREET | Interior alterations to the 13th and 14th floor office space to include general construction work as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress | $300,000 |
| M01392716-S1-MS | 2026-06-09 | Mechanical / HVAC | 685 THIRD AVENUE | FILING FOR MECHANICAL WORK ASSOCIATED WITH INTERIOR DEMO OF 3RD THROUGH 7TH FLOORS AS PER PLANS SUBMITTED HEREWITH. | $102,500 |
| M01392716-I1-GC | 2026-06-04 | General construction | 685 THIRD AVENUE | FILING FOR INTERIOR DEMO OF 3RD THROUGH 7TH FLOORS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $703,000 |
| M01348320-S1-MS | 2026-05-14 | Mechanical / HVAC | 51 WEST 52 STREET | Modifications to the existing Mechanical systems equipment and ductwork on the 5th floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress. | $325,000 |
| M01361450-S1-MS | 2026-05-13 | Mechanical / HVAC | 51 WEST 52 STREET | Modifications to the existing Mechanical systems and ductwork on the 3rd floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress. | $500,000 |
| M01348320-I1-GC | 2026-05-13 | General construction | 51 WEST 52 STREET | Interior alterations to the 5th floor office space to include general construction work as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress | $2,100,000 |
| M01361458-S1-MS | 2026-05-13 | Mechanical / HVAC | 51 WEST 52 STREET | Modifications to the Mechanical systems on the 2nd floor as per plans submitted herewith. No Change to Use, Occupancy or Egress. | $500,000 |
| M01387149-I1-MS | 2026-05-11 | Mechanical / HVAC | 625 BROADWAY | REPLACEMENT OF EXISTING HVAC UNITS ON 6TH & 7TH FLOORS WITHIN MECHANICAL ROOMS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $40,000 |
| M01361450-I1-GC | 2026-05-05 | General construction | 51 WEST 52 STREET | General Construction buildout to existing 3rd floor office space as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress | $1,500,000 |
| M01361458-I1-GC | 2026-05-05 | General construction | 51 WEST 52 STREET | General Construction buildout to existing 2nd floor office space as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress | $1,500,000 |
| M01377985-I1-MS | 2026-04-30 | Mechanical / HVAC | 132 WEST 31 STREET | Modifications to the existing HVAC system on the 13th floor as per plans. No change to use, egress or occupancy | $50,968 |
| M01351244-I1-MS | 2026-04-27 | Mechanical / HVAC | 132 WEST 31 STREET | Modifications to the existing HVAC system on the 8th floor (Demo) as per plans. No change to use, egress or occupancy | $21,915 |
| M01373003-I1-GC | 2026-04-21 | General construction | 444 MADISON AVENUE | Full floor demolition of all interior non load bearing partitions and floor finishes on floors 15 16, 20 & 24. | $250,000 |
| M01377979-I1-GC | 2026-04-15 | General construction | 132 WEST 31 STREET | Minor demolition. Installation of partitions, doors ceilings on the 13th floor (Buildout) as per plans. No change to use, egress or occupancy. | $555,705 |
| M01370268-I1-GC | 2026-04-09 | General construction | 630 FIFTH AVENUE | Demolition and general construction work on partial 25th floor as per plans. No change to use. egress or occupancy. | $258,375 |
| M01344204-S1-MS | 2026-03-31 | Mechanical / HVAC | 70 EAST 55 STREET | FILING HEREWITH MECHANICAL WORK AS PER PLANS FOR OFFICE RENOVATION. | $62,960 |
| M01344204-I1-GC | 2026-03-31 | General construction | 70 EAST 55 STREET | FILING HEREWITH RENOVATION OF EXISTING OFFICE AS PER PLANS. | $158,910 |
| M01373742-I1-MS | 2026-03-31 | Mechanical / HVAC | 240 WEST 35 STREET | Mechanical work in conjunction with minor partition work in Suite 301. No change to use, egress or occupancy. | $30,000 |
| M01364657-I1-MS | 2026-03-30 | Mechanical / HVAC | 1369 BROADWAY | INSTALLATION OF NEW HVAC AIR-CONDITIONING HEAT PUMP SPLIT SYSTEM FOR GROUND FLOOR RETAIL TEANT C | $10,000 |
| M01369162-I1-GC | 2026-03-25 | General construction | 240 WEST 35 STREET | Minor partition and lighting work in suite 301. No change to use, egress or occupancy. | $100,800 |
| M01252040-I1-MS | 2026-03-20 | Mechanical / HVAC | 123 WILLIAM STREET | Propose to perform mechanical work. No change in use, egress or occupancy. | $68,500 |
| M01330151-I1-GC-CX | 2026-03-19 | General construction | 1693 BROADWAY | INTERIOR RENOVATION AND INSTALLATION OF COMMERCIAL EXHAUST SYSTEM FOR TAKE OUT PIZZERIA, NO CHANGE IN USE OCCUPANCY OR EGRESS | $129,950 |
| M01330151-I1-GC-CX | 2026-03-19 | Mechanical / HVAC | 1693 BROADWAY | INTERIOR RENOVATION AND INSTALLATION OF COMMERCIAL EXHAUST SYSTEM FOR TAKE OUT PIZZERIA, NO CHANGE IN USE OCCUPANCY OR EGRESS | $129,950 |
| M01364019-S1-MS | 2026-03-17 | Mechanical / HVAC | 70 EAST 55 STREET | FILING HEREWITH MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF EXISITNG OFFICE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $60,800 |
| M01364019-I1-GC | 2026-03-16 | General construction | 70 EAST 55 STREET | FILING HEREWITH RENOVATION OF EXISTING OFFICE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCPANCY. | $98,724 |
| M01362333-I1-MS | 2026-03-16 | Mechanical / HVAC | 1 ROCKEFELLER PLAZA | Mechanical changes as indicated on plans. | $50,000 |
| M01255315-I1-GC | 2026-03-10 | General construction | 123 WILLIAM STREET | Propose to perform interior renovations. No change in use, egress or occupancy. | $378,250 |
| M01350058-I1-MS | 2026-03-10 | Mechanical / HVAC | 1 ROCKEFELLER PLAZA | Mechanical changes as indicated on plans. | $74,180 |
| M01350050-I1-GC | 2026-03-10 | General construction | 1 ROCKEFELLER PLAZA | Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans, | $148,360 |
| M01356104-S1-MS | 2026-03-09 | Mechanical / HVAC | 685 THIRD AVENUE | FILING FOR MECHANICAL WORK ASSOCIATED WITH INTERIOR RENOVATION OF 28TH FLOOR GALLET DRYER BERKEY OFFICE AS PER PLANS SUBMITTED HEREWITH. | $136,000 |
| M01347179-I1-MS | 2026-03-06 | Mechanical / HVAC | 575 FIFTH AVENUE | Modifications to the existing HVAC System; Installation of new supplemental unit and ductwork on the Cellar & 1st Floor as per plans (Retail Space - Renovations.) No change to use, | $296,380 |
| M01347045-I1-GC | 2026-03-06 | General construction | 575 FIFTH AVENUE | Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the Cellar & Ground Floors as per plans (CBRE Retail Space.) | $115,590 |
| M01356104-I1-GC | 2026-03-03 | General construction | 685 THIRD AVENUE | FILING FOR INTERIOR RENOVATION OF 28TH FLOOR GALLET DRYER BERKEY OFFICE AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $747,812 |
| M01362499-I1-GC | 2026-02-27 | General construction | 580 5 AVENUE | Renovation of office suite 2508. No change to use, egress or occupancy. | $79,100 |
| M01294653-I1-MS | 2026-02-13 | Mechanical / HVAC | 141 EAST 26 STREET | MECHANICAL LOUVERS, DUCTWORK AND DAMPERS TO ALLOW FOR DRYER VENTILATION. NO CHANGE IN EGRESS, USE OR OCCUPANCY. | $2,500 |
| M01339408-I1-GC | 2026-02-13 | General construction | 1 ROCKEFELLER PLAZA | Interior demo & reno of non-load bearing partitions, walls, doors, ceiling & finishes as indicated on plans. | $201,020 |
| M01343514-S1-MS | 2026-02-12 | Mechanical / HVAC | 51 WEST 52 STREET | Modifications to the existing Mechanical Systems on the 4th floor as per plans submitted herewith. No Change to Use, Occupancy or Egress. | $300,000 |
| M01343514-I1-GC | 2026-02-09 | General construction | 51 WEST 52 STREET | Interior alterations to the 4th floor office space to include general construction work as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress | $2,000,000 |
| M01335906-I1-GC | 2026-02-09 | General construction | 51 WEST 52 STREET | Interior Demo to existing 2nd floor office space as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress | $70,000 |
| M01335906-S1-MS | 2026-02-09 | Mechanical / HVAC | 51 WEST 52 STREET | Interior Demo of existing Mechanical Ductwork and related equipment on thr 2nd floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress. | $40,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
