COMPANY RECORD · NEW YORK, NY
Tishman Interiors Corp — permit history in New York, NY
Tishman Interiors Corp appears on 498 New York permit records from 2019 through 2026, most often general construction (52% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 261 | 52% |
| Mechanical / HVAC | 241 | 48% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 9 |
| 2020 | 28 |
| 2021 | 94 |
| 2022 | 80 |
| 2023 | 124 |
| 2024 | 74 |
| 2025 | 54 |
| 2026 | 39 |
Busiest year on record: 2023, with 124 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Sirina Fire Prot Corp | 11 | 2026-05-15 |
| Pace Plumbing Corp | 8 | 2024-12-18 |
| Manengeering Bureau Inc | 6 | 2023-11-09 |
| Olympic Plbg & Htg Svc In | 6 | 2025-10-21 |
| Lab Plbg & Htg Co Inc | 5 | 2024-04-30 |
| Abco-Peerless Sprklr Corp | 5 | 2026-08-03 |
| Ashlar Mechanical Corp | 4 | 2025-08-20 |
| Demar Plumbing Corp | 4 | 2026-04-24 |
| Par Plumbing Co., Inc | 4 | 2023-07-21 |
| Parkview P&H Inc | 3 | 2026-05-14 |
| Jcc Construction Corp | 2 | 2024-10-22 |
| George Breslaw Plbng LLC | 2 | 2023-07-10 |
17 companies are named alongside Tishman Interiors Corp on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 561 GREENWICH STREET | 2026-07-24 |
| 277 PARK AVENUE | 2026-07-24 |
| 101 HUTCHINSON RIVER PARKWAY | 2026-07-21 |
| 2885 OCEAN AVENUE | 2026-05-29 |
| 375 MADISON AVENUE | 2026-05-14 |
| 11 WALL STREET | 2026-05-01 |
| 460 PARK AVENUE | 2026-04-21 |
| 2373 TIEBOUT AVENUE | 2026-04-01 |
| 2101 WEST 12 STREET | 2026-03-03 |
| 1070 BUSHWICK AVENUE | 2026-02-05 |
| 7701 3 AVENUE | 2026-01-21 |
| 199-06 93 AVENUE | 2026-01-15 |
| 1155 6 AVENUE | 2025-12-31 |
| 5515 AVENUE I | 2025-12-31 |
138 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $217,878,621, median $428,034. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
498 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01406417-I1-MS | 2026-07-24 | Mechanical / HVAC | 561 GREENWICH STREET | This application is to capture EUPs that were missing from original MH application M00323842.Application is in conjunction with NB #121206523. Full new building energy package file | $1,000 |
| M01392768-S1-MS | 2026-07-24 | Mechanical / HVAC | 277 PARK AVENUE | additions /modifications to existing mechanical systems on 13th and 14th floor as per plans filed herewith. No change in use, egress or occupancy. | $711,000 |
| M01392768-I1-GC | 2026-07-24 | General construction | 277 PARK AVENUE | Interior renovations on the 13th floor and 14th floor as per plans filed herewith. No change in use, egress or occupancy. | $4,338,000 |
| X01375917-S1-GC | 2026-07-21 | General construction | 101 HUTCHINSON RIVER PARKWAY | Civil work associated with temp clubhouse as per plans filed herewith. MPP 550 | $0 |
| X01386951-I1-GC | 2026-06-11 | General construction | 101 HUTCHINSON RIVER PARKWAY | Filing herewith for construction trailers as per plans filed herewith. MPP 550 | $133,481 |
| X01393563-I1-GC | 2026-06-11 | General construction | 101 HUTCHINSON RIVER PARKWAY | Filing herewith for construction trailers as per plans filed herewith. MPP 550 | $511,719 |
| X01375917-I1-GC | 2026-06-03 | General construction | 101 HUTCHINSON RIVER PARKWAY | Propose to place temporary trailers on site to be used as temporary club house & restrooms for the Bally's golf course at Ferry Point Park, Bronx NY. Application filed in order to | $130,000 |
| B01239932-I1-MS | 2026-05-29 | Mechanical / HVAC | 2885 OCEAN AVENUE | Hereby filing mechanical system for installation of an 800kw generator per plans filed herewith. No change to use, egress, or occupancy | $340,270 |
| M01278028-S1-MS | 2026-05-14 | Mechanical / HVAC | 375 MADISON AVENUE | Filing herewith for additions and modifications to existing Mechanical systems and associated ducts and piping for women's and men's washrooms/restrooms. | $68,742,656 |
| M01278028-I1-GC | 2026-05-14 | General construction | 375 MADISON AVENUE | Filing herewith for partitions and related finishes for women's and men's washrooms/restrooms. No change to use, egress, or occupancy under this applications. | $22,557,090 |
| M01278020-I1-GC | 2026-05-14 | General construction | 375 MADISON AVENUE | Removal and installation of partitions, doors, and finishes for MER relocation. No change to use, egress, or occupancy. | $9,100,000 |
| M01278020-S1-MS | 2026-05-14 | Mechanical / HVAC | 375 MADISON AVENUE | Filing herewith mechanical/hvac installations, additions, and modifications to MER room Mechanical systems as per plans. No change in use, egress, or occupancy in this application. | $6,440,334 |
| M01389000-I1-GC | 2026-05-01 | General construction | 11 WALL STREET | PREPARATION OF TEMPORARY EGRESS PLANS FOR LIMITED OCCUPANCY OF 150 OCCUPANTS OR LESS ON WEEKENDS FOR USE WHILE ALTERATION WORK IS BEING PERFORMS ON WEEKEND ONLY. | $100 |
| M01277980-I1-GC | 2026-04-30 | General construction | 375 MADISON AVENUE | Alteration-CO for changes in use, occupancy, and egress on floors sub-cellar, cellar, 1, 1M, 2-11, 18, & 19 as part of full building renovation. Changes to overall building Zoning | $64,528,511 |
| M01302311-I1-GC | 2026-04-21 | General construction | 460 PARK AVENUE | Job filed herewith (in conjunction with job#M01194094) to cover interior soft demolition for the referenced floors. This work is to be filed with an ACP5 capturing the work which d | $1,000 |
| M01302311-S1-MS | 2026-04-21 | Mechanical / HVAC | 460 PARK AVENUE | Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Cons | $1,000 |
| M01372964-I1-GC | 2026-04-02 | General construction | 277 PARK AVENUE | interior demolition on 13th and 14th floor as per plans filed herewith. No change in use, egress or occupancy, | $70,000 |
| X01334122-I1-MS | 2026-04-01 | Mechanical / HVAC | 2373 TIEBOUT AVENUE | INSTALLATIION OF NEW WALL MOUNTED AC UNIT AND EXHAUST FAN DUCTWORK MODIFICATIONS IN ELEVATOR MACHINE ROOM | $44,500 |
| X01334105-I1-GC | 2026-04-01 | General construction | 2373 TIEBOUT AVENUE | filing herewith elevator modifications as per plans filed herewith. | $288,700 |
| M01277980-S2-MS | 2026-03-30 | Mechanical / HVAC | 375 MADISON AVENUE | Filing herewith mechanical/hvac installations, additions, and modifications to existing building system as per plans. | $5,210,172 |
| M01344776-I1-MS | 2026-03-09 | Mechanical / HVAC | 375 MADISON AVENUE | Early-phase Mechanical modifications to fan powered boxes and fans on Floors 27 through 29. Construction costs and filing fees included in full-floor Mechanical job # M01293931-S1. | $999 |
| M01344781-I1-MS | 2026-03-06 | Mechanical / HVAC | 375 MADISON AVENUE | Early-phase Mechanical modifications to fan powered boxes and fans on Floors 34 through 38. Construction costs and filing fees included in full-floor Mechanical job # M01293987-S1. | $998 |
| M01344754-I1-MS | 2026-03-06 | Mechanical / HVAC | 375 MADISON AVENUE | Early-phase Mechanical modifications to fan powered boxes and fans on Floors 03 through 06. Construction costs and filing fees included in full-floor Mechanical job #M01293886-S1. | $999 |
| M01344759-I1-MS | 2026-03-06 | Mechanical / HVAC | 375 MADISON AVENUE | Early-phase Mechanical modifications to fan powered boxes and fans on Floors 07 through 08. Construction costs and filing fees included in full-floor Mechanical job #M01293902-S1. | $999 |
| M01344773-I1-MS | 2026-03-05 | Mechanical / HVAC | 375 MADISON AVENUE | Early-phase Mechanical modifications to fan powered boxes and fans on Floors 24 through 26. Construction costs and filing fees included in full-floor Mechanical job # M01293926-S1. | $999 |
| M01344778-I1-MS | 2026-03-04 | Mechanical / HVAC | 375 MADISON AVENUE | Early-phase Mechanical modifications to fan powered boxes and fans on Floors 30 through 33. Construction costs and filing fees included in full-floor Mechanical job # M01293952-S1. | $1,000 |
| M01344760-I1-MS | 2026-03-04 | Mechanical / HVAC | 375 MADISON AVENUE | Early-phase Mechanical modifications to fan powered boxes and fans on Floors 09 through 11. Construction costs and filing fees included in full-floor Mechanical job #M01294935-S1. | $999 |
| M01344783-I1-MS | 2026-03-04 | Mechanical / HVAC | 375 MADISON AVENUE | Early-phase Mechanical modifications to fan powered boxes and fans on Floors 39 through 41. Construction costs and filing fees included in full-floor Mechanical job # M01293994-S1. | $1,000 |
| M01344770-I1-MS | 2026-03-04 | Mechanical / HVAC | 375 MADISON AVENUE | Early-phase Mechanical modifications to fan powered boxes and fans on Floors 20 through 23. Construction costs and filing fees included in full-floor Mechanical job # M01293923-S1. | $999 |
| M01344765-I1-MS | 2026-03-04 | Mechanical / HVAC | 375 MADISON AVENUE | Early-phase Mechanical modifications to fan powered boxes and fans on Floor 19. Construction costs and filing fees included in full-floor Mechanical job #M01293917-S1. No change in | $1,000 |
| B01273636-I1-GC | 2026-03-03 | General construction | 2101 WEST 12 STREET | INTERIOR/EXTERIOR RENOVATIONS AS PER LANS FILED HEREIWHT NO CJANGE IN USE, EGRESS OR OCCUPANCY. | $197,300 |
| B01273687-I1-MS | 2026-03-02 | Mechanical / HVAC | 2101 WEST 12 STREET | INSTALLATIION OF NEW WALL MOUNTED AC UNIT AND EXHAUST FAN DUCTWORK MODIFICATIONS IN ELEVATOR MACHINE ROOM | $140,000 |
| M01224609-I1-GC | 2026-02-20 | General construction | 375 MADISON AVENUE | Filing for installation of new facade curtain wall and Energy compliance review of building Envelope Energy Model as per plans filed herewith. No change to use, egress, or occupanc | $217,878,621 |
| B01294889-I1-MS | 2026-02-05 | Mechanical / HVAC | 1070 BUSHWICK AVENUE | INTERIOR RENOVIATIONS TO EXISTING MECHANICAL SYSTEM PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY | $121,000 |
| B01294867-I1-GC | 2026-02-05 | General construction | 1070 BUSHWICK AVENUE | INTERIOR RENOVATIONS AS PER LANS FILED HEREIWHT NO CJANGE IN USE, EGRESS OR OCCUPANCY. | $260,000 |
| M01302957-I1-GC | 2026-01-22 | General construction | 11 WALL STREET | LEVEL B1 (CELLAR): RENOVATION OF APPROXIMATELY 990 SF OF EXISTINGVAULT & STORAGE AREAS. | $1,781,021 |
| B01262417-I1-MS | 2026-01-21 | Mechanical / HVAC | 7701 3 AVENUE | ADDITIONS/MODIFICATIONS TO EXISTING PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY | $90,494 |
| Q01262564-I1-GC | 2026-01-15 | General construction | 199-06 93 AVENUE | remove existing elevator cab, joist and associated equipment and replace with a new elevator and associated equipment replacement, Minor wall penetration for electrical conduit. A | $320,892 |
| B01262397-I1-GC | 2026-01-14 | General construction | 7701 3 AVENUE | INTERIOR/EXTERIOR RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY. | $219,000 |
| M01335987-I1-MS | 2025-12-31 | Mechanical / HVAC | 1155 6 AVENUE | Filing for the replacement of (12) 12 Ton AC units, (6) 5 Ton AC units connected to the tenant Glycol Cooling system and replace (4) propeller fan closed- circuit Dry cooler system | $1,538,442 |
| B01315199-I1-MS | 2025-12-31 | Mechanical / HVAC | 5515 AVENUE I | Mechanical work related to the replacement of computer room air conditioning and dry coolers and synchronous belt retrofit as shown herewith on plans. No change to use, egress, or | $1,000,000 |
| M01336917-I1-MS | 2025-12-31 | Mechanical / HVAC | 325 HUDSON STREET | Filing for the removal and replacement of (4) AC units and related ducts. | $575,000 |
| M01332583-I1-MS | 2025-12-24 | Mechanical / HVAC | 5030 BROADWAY | MINOR INTERIOR SCOPE OF WORK ON 2ND FLOOR. THE SCOPE OF WORK ON 2ND FLOOR INCLUDES CRAC REPLACEMENT IN PHASES. NO CHANGE IN EGRESS OR OCCUPANCY. EXISTING BUILDING CORE AND SHELLSPA | $830,000 |
| M01334528-I1-MS | 2025-12-24 | Mechanical / HVAC | 32 AVENUE OF AMERICAS | Filing to replace (5) CRAC Units and related piping | $260,000 |
| M01334527-I1-GC | 2025-12-24 | General construction | 32 AVENUE OF AMERICAS | Filing for the Removal of Existing Crac Units on the 11th floor and remove and modify existing raised floor to accommodate New Floor stands and equipment Floor stands. | $243,979 |
| Q01262586-I1-MS | 2025-12-19 | Mechanical / HVAC | 199-06 93 AVENUE | ADDITIONS/ MODIFICAITIONS TO EXISTING MECHANICAL SYSTEMS AS PER PLANS FILED HEREWITH | $68,650 |
| Q01258375-I1-MS | 2025-11-12 | Mechanical / HVAC | 118-15 115 AVENUE | additions/modifications to existing mechanical systems as per plans filed herewith. No change in use, egress or occupancy. | $80,000 |
| Q01258361-I1-GC | 2025-11-12 | General construction | 118-15 115 AVENUE | removal of existing elevator cab, hoist and associated equipment and replace with a new elevator and associated equipment replacement. Interior renovations as indicated on plans fi | $331,928 |
| M01296642-I1-GC | 2025-10-24 | General construction | 375 MADISON AVENUE | Filing herewith General Construction for temporary conditions inclusive but not limited to partitions, doors, and hardware for interior non-structural debris removal through Madiso | $100,000 |
| M01186398-I1-MS | 2025-10-24 | Mechanical / HVAC | 1095 AVENUE OF THE AMERICAS | Hereby filing modifications to existing mechanical system and related duct & piping per plans filed herewith. | $1,214,108 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
