COMPANY RECORD · NEW YORK, NY
A.W. & S. Construction Co — permit history in New York, NY
A.W. & S. Construction Co appears on 386 New York permit records from 2019 through 2026, most often mechanical / hvac (51.4% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Mechanical / HVAC | 199 | 51.4% |
| General construction | 188 | 48.6% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 9 |
| 2020 | 22 |
| 2021 | 63 |
| 2022 | 77 |
| 2023 | 46 |
| 2024 | 57 |
| 2025 | 73 |
| 2026 | 40 |
Busiest year on record: 2022, with 77 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| A + Sprinkler Corp | 19 | 2025-10-14 |
| A Plus Plumbing Corp | 12 | 2026-08-27 |
| A&A Plumbing Corp | 12 | 2026-05-08 |
| William C. Gerakaris P&H | 7 | 2026-08-07 |
| Arco Plbg And Htg Inc | 3 | 2025-03-11 |
| Addison Plbg And Htg Corp | 2 | 2025-09-18 |
| George Breslaw Plbng LLC | 2 | 2024-03-04 |
| Bedrock Mechanical Inc | 2 | 2026-07-28 |
| Bedrock Plbg. & Htg., Inc | 2 | 2025-02-05 |
| Bedrock Plumbing & Heating Inc | 2 | 2026-07-28 |
| Standard Plbg Svs LLC | 2 | 2024-07-10 |
| Psi Partners, LLC | 2 | 2026-06-11 |
21 companies are named alongside A.W. & S. Construction Co on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 204 ELIZABETH STREET | 2026-08-13 |
| 225 WEST 34 STREET | 2026-08-05 |
| 650 FIFTH AVENUE | 2026-08-03 |
| 111 5 AVENUE | 2026-07-22 |
| 1330 AVENUE OF THE AMERICAS | 2026-07-15 |
| 575 5 AVENUE | 2026-06-03 |
| 120 EAST 23 STREET | 2026-05-29 |
| 100 PARK AVENUE | 2026-05-21 |
| 61 9 AVENUE | 2026-05-20 |
| 1407 BROADWAY | 2026-05-13 |
| 26 WEST 9 STREET | 2026-04-01 |
| 445 PARK AVENUE | 2026-03-30 |
| 641 LEXINGTON AVENUE | 2026-02-25 |
| 300 EAST 42 STREET | 2026-02-19 |
130 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $4,710,600, median $165,444. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
386 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01409262-S1-MS | 2026-08-13 | Mechanical / HVAC | 204 ELIZABETH STREET | Modification of the mechanical system to install new ducts and associated piping as shown on the drawings filed herewith. No change in use, egress, or occupancy. | $0 |
| M01409262-I1-GC | 2026-08-13 | General construction | 204 ELIZABETH STREET | 5th floor office renovation as shown on the drawings filed herewith. No change in use, egress, or occupancy. | $174,152 |
| M01424080-S1-MS | 2026-08-05 | Mechanical / HVAC | 225 WEST 34 STREET | APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 13TH FL (JAN BROWN LAW) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $33,500 |
| M01400997-I1-MS | 2026-08-03 | Mechanical / HVAC | 204 ELIZABETH STREET | Modification of the mechanical system to install new ducts and associated piping as shown on the drawings filed herewith. No change in use, egress, or occupancy. | $95,000 |
| M01424080-I1-GC | 2026-08-03 | General construction | 225 WEST 34 STREET | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 13TH FL (JAN BROWN LAW) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRES | $102,375 |
| M01424472-I1-MS | 2026-08-03 | Mechanical / HVAC | 650 FIFTH AVENUE | Modification to the existing HVAC system on the 32nd floor as per plans. No change to use, egress or occupancy. | $209,984 |
| M01395391-I1-GC | 2026-08-03 | General construction | 204 ELIZABETH STREET | 4th floor office renovation as shown on the drawings filed herewith. No change in use, egress, or occupancy. | $144,120 |
| M01424455-I1-GC | 2026-08-03 | General construction | 650 FIFTH AVENUE | Minor demolition. Installation of interior partitions, fixtures, suspended ceilings & floor finishes on the 32nd floor as per plans. No change to use, egress or occupancy. | $989,944 |
| M01417152-I1-GC | 2026-07-22 | General construction | 225 WEST 34 STREET | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 16TH FL (HGF) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCU | $194,545 |
| M01417152-S1-MS | 2026-07-22 | Mechanical / HVAC | 225 WEST 34 STREET | APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 16TH FL (HGF) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $58,500 |
| M01401250-S1-MS | 2026-07-22 | Mechanical / HVAC | 111 5 AVENUE | INSTALLATION OF NEW MECHANICAL SYSTEMS AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $271,950 |
| M01423920-I1-GC | 2026-07-22 | General construction | 650 FIFTH AVENUE | Removal and disposal of interior partitions, fixtures, suspended ceilings & floor finishes on the 31st floor as per plans. No change to use, egress or occupancy. | $102,204 |
| M01424096-I1-MS | 2026-07-22 | Mechanical / HVAC | 650 FIFTH AVENUE | Removal of existing units and associated piping and ductwork on the 31st floor as per plans. No change to use, egress or occupancy. | $19,992 |
| M01401250-I1-GC | 2026-07-15 | General construction | 111 5 AVENUE | REMOVAL & INSTALLATION OF NON-LOAD BEARING PARTITIONS AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $2,000,000 |
| M01423891-I1-GC | 2026-07-15 | General construction | 1330 AVENUE OF THE AMERICAS | General construction modifications taking place on the 32 fl construction/ 33 fl marketing floor as per plans filed herewith. No change in use, egress or occupancy | $101,400 |
| M01423891-S1-MS | 2026-07-14 | Mechanical / HVAC | 1330 AVENUE OF THE AMERICAS | Mechanical modifications taking place on the 32 construction /33 marketing floor as per plans filed herewith. No change in use, egress or occupancy | $7,200 |
| M01407211-S1-MS | 2026-06-03 | Mechanical / HVAC | 575 5 AVENUE | MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS IN 11TH FLOOR OFFICE SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS | $75,000 |
| M01407211-I1-GC | 2026-06-01 | General construction | 575 5 AVENUE | INTERIOR ALTERATIONS OF EXISTING 11TH FLOOR COMMERCIAL OFFICE SPACE TO INCLUDE NON-LOAD BEARING DEMO, PARTITION AND FINISHES WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS | $128,000 |
| M01373819-I1-GC | 2026-05-29 | General construction | 120 EAST 23 STREET | Filing for storefront modification, removal of convenience stair/platform and new opening for new convenience stair. No change to use, egress, or occupancy. | $210,000 |
| M01351744-S2-MS | 2026-05-29 | Mechanical / HVAC | 120 EAST 23 STREET | Filing for new mechanical work at the cellar and 1st floor. No change to use, egress, or occupancy. | $800,000 |
| M01351744-I1-GC | 2026-05-28 | General construction | 120 EAST 23 STREET | Filing for interior renovation at the cellar and 1st floor. Work includes installation of interior non load bearing partitions, doors, finish work. No change to use, egress, or occ | $1,100,031 |
| M01330569-S2-MS | 2026-05-28 | Mechanical / HVAC | 204 ELIZABETH STREET | Modification of the mechanical system to install new ducts and associated piping as shown on the drawings filed herewith. No change in use, egress, or occupancy. | $40,000 |
| M01366204-I1-GC | 2026-05-21 | General construction | 100 PARK AVENUE | Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans. | $90,000 |
| M01366251-I1-MS | 2026-05-21 | Mechanical / HVAC | 100 PARK AVENUE | Mechanical changes as indicated on plans. | $45,000 |
| M01378222-S1-MS | 2026-05-20 | Mechanical / HVAC | 61 9 AVENUE | REMOVAL AND INSTALLATION OF DUCTWORK, DIFFUSERS, FANS AND RELATED MECHANICAL PIPING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $70,000 |
| M01387002-I1-GC | 2026-05-13 | General construction | 1407 BROADWAY | Interior demolition as per plans filed herewith. No change to use, egress, or occupancy. | $63,500 |
| M01378222-I1-GC | 2026-05-13 | General construction | 61 9 AVENUE | INTERIOR RENOVAION OF COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.. | $1,000,000 |
| M01386603-I1-GC | 2026-05-13 | General construction | 100 PARK AVENUE | Interior renovation as per plans. No change in use, egress or occupancy | $300,000 |
| M01342040-I1-MS | 2026-05-12 | Mechanical / HVAC | 100 PARK AVENUE | Mechanical changes as indicated on plans. | $150,000 |
| M01387022-I1-MS | 2026-05-11 | Mechanical / HVAC | 1407 BROADWAY | Mechanical demolition as per plans filed herewith. | $9,500 |
| M01365909-I1-GC | 2026-04-01 | General construction | 26 WEST 9 STREET | THIS APPLICATION IS FILED FOR A TEMPORARY USE PERMIT FOR A SALES OFFICE ON THE 4TH FLOOR INCLUDING MODEL APARTMENTS PURSUANT TO SECTION AC-28-111 AND BUILDING BULLETIN 2010-22 | $500 |
| M01363996-I1-GC | 2026-03-30 | General construction | 445 PARK AVENUE | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 17TH FL (GABRIEL CAPITAL) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGR | $505,700 |
| M01363996-S1-MS | 2026-03-30 | Mechanical / HVAC | 445 PARK AVENUE | APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 17TH FL (GABRIEL CAPITAL) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $144,000 |
| M01330569-I1-GC | 2026-03-26 | General construction | 204 ELIZABETH STREET | 6th floor office renovation as shown on the drawings filed herewith. No change in use, egress, or occupancy. | $122,966 |
| M01356272-S1-MS | 2026-02-25 | Mechanical / HVAC | 641 LEXINGTON AVENUE | FILING FOR MECHANICAL WORK ASSOCIATED WITH INTERIOR RENOVATION OF 11TH AND 12TH FLOOR PEERLESS CLOTHING OFFICE AS PER PLANS SUBMITTED HEREWITH. | $35,000 |
| M01356272-I1-GC | 2026-02-24 | General construction | 641 LEXINGTON AVENUE | FILING FOR INTERIOR RENOVATION OF 11TH & 12TH FLOOR PEERLESS CLOTHING OFFICE SPACE AS PER PLANS SUBMITTED HEREWITH. | $1,809,000 |
| M01285650-S2-MS | 2026-02-19 | Mechanical / HVAC | 300 EAST 42 STREET | INSTALLATION OF HIGH, MEDIUM & LOW PRESSURE DUCTWORK, DEDICATEDOUTDOOR AIR HANDLING UNIT, VARIABLE VOLUME TERMINAL BOXES,DIFFUSERS AND ASSOCIATED MECHANICAL PIPING & ACCESSORIES | $200,000 |
| M01285650-I1-GC | 2026-01-23 | General construction | 300 EAST 42 STREET | INTERIOR FIT-OUT FOR EXISTING OFFICE SPACE ON PARTIAL 5TH FLOOR AND PARTIAL 1ST FLOOR STREET LOBBY. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $775,000 |
| M01321484-I1-GC | 2026-01-08 | General construction | 24 UNION SQUARE EAST | HEREWITH FILING FOR INTERIOR RENOVATIONS ON THE 4TH FLOOR AS PER PLANS. NO CHANGE TO SE COCUPANCY OR EGRESS. | $83,795 |
| M01321513-I1-MS | 2026-01-08 | Mechanical / HVAC | 24 UNION SQUARE EAST | HEREWITH FILING FOR MECHANICAL MODIFICATIONS ON 4TH FLOOR AS PER PLANS. NO CHANGE TO USE, OCCUPANY, OR EGRESS UNDER THIS APPLICATION. | $19,000 |
| M01289973-S2-MS | 2025-12-30 | Mechanical / HVAC | 4 PARK AVENUE | Filing for mechanical work at the 2nd floor. No change to use, egress, or occupancy. | $226,044 |
| M01290632-I1-MS | 2025-12-23 | Mechanical / HVAC | 100 BROADWAY | MECHANICAL MODIFICATIONS ON 11TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $25,057 |
| M01289973-I1-GC | 2025-12-18 | General construction | 4 PARK AVENUE | Filing for the renovation of an existing commercial space at the 2nd floor. Work includes installation of interior non load bearing partitions, doors, finish work. No change to use | $400,023 |
| M01298887-I1-MS | 2025-12-18 | Mechanical / HVAC | 100 BROADWAY | MECHANICAL MODIFICATIONS ON 20TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $339,967 |
| M01298864-I1-GC | 2025-12-17 | General construction | 100 BROADWAY | GENERAL CONSTRUCTION ON 20TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $1,799,901 |
| M01290621-I1-GC | 2025-12-16 | General construction | 100 BROADWAY | GENERAL CONSTRUCTION ON 11TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $828,615 |
| M01292502-I1-MS | 2025-12-12 | Mechanical / HVAC | 810 SEVENTH AVENUE | Modifications to the existing HVAC system on the 20th floor (Suite 2000- Made by Gather) as per plans. No change to use, egress or occupancy. | $99,981 |
| M01292483-I1-GC | 2025-12-12 | General construction | 810 SEVENTH AVENUE | Installation of new partitions, doors, ceilings and finishes on the 20th floor (Suite 2000- Made by Gather) as per plans. No change to use, egress or occupancy | $224,940 |
| M01289275-I1-MS | 2025-12-03 | Mechanical / HVAC | 1 WEST 39 STREET | Installation of new AC units, associated piping, low pressure ductwotk, piping, & associated air outlets | $250,000 |
| M01285185-I1-GC | 2025-12-02 | General construction | 1 WEST 39 STREET | Removal and installation of partitions doors, suspended ceilings for new office restrooms and locker rooms as per plans filed herewith | $400,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
