COMPANY RECORD · NEW YORK, NY
Accord Contr And Mgmt Cor — permit history in New York, NY
Accord Contr And Mgmt Cor appears on 172 New York permit records from 2019 through 2026, most often general construction (51.2% of the record).
Licence on record
| Number as published by the authority | Permits filed under it |
|---|---|
| 007932 | 172 |
The number is reproduced as New York published it. A licence appearing on a permit does not prove it is current: check status and expiry with the issuing authority before acting.
Business record held by the regulator
| Name as registered | ACCORD CONTR AND MGMT COR |
|---|---|
| Business address on file | 132 WEST 31ST ST NEW YORK NY 10001 |
| Business phone on file | (212) 290-1777 |
| Licence number | 7932 |
| Licence type | GENERAL CONTRACTOR |
| Status in the register | ACTIVE |
Read from DOB License Info, published by the NYC Department of Buildings; our copy is from 2026-10-31. The name, address and phone are those the company filed with the regulator, reproduced as published. A permit shows the licence was on file the day it was filed. These rows show what the regulator holds now. The record is matched to Accord Contr And Mgmt Cor by company name, and only where that name resolves to exactly one licence in the register — a rule measured at 99.4% correct against permits whose licence number we already know. Verify with the authority before acting on it.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 88 | 51.2% |
| Mechanical / HVAC | 84 | 48.8% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 2 |
| 2020 | 7 |
| 2021 | 26 |
| 2022 | 26 |
| 2023 | 36 |
| 2024 | 24 |
| 2025 | 30 |
| 2026 | 21 |
Busiest year on record: 2023, with 36 permits. One project can account for several filings, so read this as filing activity rather than workload.
PROJECTS AHEAD SEARCH
Search every New York permit, not only this company's
This page is a snapshot of Accord Contr And Mgmt Cor. The search behind it holds more than 352,308 New York permits naming a contractor, since 2019: 151,351 building permits, 117,270 plumbing permits, 72,431 mechanical (HVAC) permits, 43,000 fire protection permits.
- Search the full history by company, address, permit type or date range.
- Set an alert and get an email when a new permit matches — the next permit Accord Contr And Mgmt Cor files, or any new building permit in New York. A new permit is an early signal of work to bid on, supply or finance.
- Export to CSV for your CRM or spreadsheet.
Free account: newest 7 days of records, 10 searches a day and 1 daily alert. Full history, CSV export and instant alerts on paid plans from $49 a month ($24.50 for the first 3 months). Compare plans
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Metrotech Mechanical Corp | 17 | 2026-08-18 |
| Universal Fire Spr LLC | 8 | 2026-06-17 |
| Five Borough Nyc LLC | 7 | 2026-08-20 |
| Metro Fire Protection Inc | 4 | 2024-05-15 |
| Mac Felder Inc | 4 | 2024-02-09 |
| Jam Service Co., Inc | 3 | 2026-06-12 |
| Ward Piping Company Inc | 2 | 2025-05-08 |
| United Plbg Mechanical In | 2 | 2026-06-23 |
| Bedrock Plbg. & Htg., Inc | 1 | 2025-05-19 |
| Bedrock Mechanical Inc | 1 | 2025-05-20 |
| A&A Plumbing Corp | 1 | 2024-03-15 |
| George Breslaw Plbng LLC | 1 | 2023-11-14 |
12 companies are named alongside Accord Contr And Mgmt Cor on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 480 CANAL STREET | 2026-10-02 |
| 257 PARK AVENUE SOUTH | 2026-09-22 |
| 132 WEST 31 STREET | 2026-09-15 |
| 841 BROADWAY | 2026-08-17 |
| 200 WEST 57 STREET | 2026-06-26 |
| 122 EAST 42 STREET | 2026-06-23 |
| 277 PARK AVENUE | 2026-04-21 |
| 551 5 AVENUE | 2026-04-15 |
| 570 LEXINGTON AVENUE | 2026-03-04 |
| 145 WEST 30 STREET | 2025-09-29 |
| 853 BROADWAY | 2025-08-11 |
| 100 AVENUE OF THE AMERICAS | 2025-06-25 |
| 1500 BROADWAY | 2025-06-20 |
| 488 MADISON AVENUE | 2025-05-07 |
31 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,950 to $3,599,690, median $108,325. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Metrotech Mechanical Corp | 7 | 2022–2026 |
| Universal Mgmt & Cont Cor | 6 | 2021–2026 |
| Bedrock Plbg. & Htg., Inc | 6 | 2020–2026 |
| Mora Fire Protection LLC | 5 | 2021–2026 |
| Universal Fire Spr LLC | 4 | 2022–2026 |
| Abco-Peerless Sprklr Corp | 4 | 2019–2024 |
| Sean Coakley P & H Inc | 3 | 2020–2026 |
| Mac Felder Inc | 3 | 2020–2025 |
Companies that also appear in New York permit records at addresses where Accord Contr And Mgmt Cor filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
172 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01460288-I1-MS | 2026-10-02 | Mechanical / HVAC | 480 CANAL STREET | Install new HVAC units and modify existing mechanical exhaust/ventilation for kitchen as per plans. | $75,000 |
| M01436323-I1-GC | 2026-09-22 | General construction | 257 PARK AVENUE SOUTH | General construction work for Interior renovation to include demolition of existing and construction of new partitions in existing office space. no change in use, egress, or occupa | $780,000 |
| M01435622-I1-GC | 2026-09-15 | General construction | 132 WEST 31 STREET | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 17th floor (Pre-build) as per plans. No change to use, egress or occupancy. | $142,500 |
| M01435631-I1-MS | 2026-09-15 | Mechanical / HVAC | 132 WEST 31 STREET | Modifications to the existing HVAC system on the 17th floor (Modifications) as per plans. No change to use, egress or occupancy | $40,000 |
| M01395433-I1-GC | 2026-08-17 | General construction | 841 BROADWAY | Demolition work completed under application # M01385345-I1 . Work under this application consist of construction building of interior partitions as shown on plans no change to use | $3,599,690 |
| M01374332-I1-GC | 2026-06-26 | General construction | 200 WEST 57 STREET | Interior renovation to include demolition of existing and construction of new partitions in suite 607 for existing office space. no change in use, egress, or occupancy. | $103,051 |
| M01345235-S1-MS | 2026-06-23 | Mechanical / HVAC | 122 EAST 42 STREET | Remove Existing Air Conditioning Unit & Associated Ductwork, Install Air Conditioning Ductwork, Supply Air Diffusers, Return Air Grilles and Volume Dampers on Part of the 40th Floo | $65,000 |
| M01345235-I1-GC | 2026-06-23 | General construction | 122 EAST 42 STREET | Minor Demolition of Partitions & Doors, Installation of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes on Part of 40th Floor (Suite 4000). No Change to Occup | $120,000 |
| M01374332-S1-MS | 2026-06-10 | Mechanical / HVAC | 200 WEST 57 STREET | Mechanical work as shown on plans filed herewith. No change in use, egress or occupancy. | $23,000 |
| M01385345-I1-GC | 2026-05-08 | General construction | 841 BROADWAY | interior renovation to include demolition of existing partitions. No change in use, egress or occupancy. | $279,931 |
| M01365312-I1-GC | 2026-04-21 | General construction | 277 PARK AVENUE | REMOVAL OF INTERIOR NON-LOAD BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $240,000 |
| M01365307-I1-GC | 2026-04-21 | General construction | 277 PARK AVENUE | REMOVAL OF INTERIOR NON-LOAD BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $240,000 |
| M01228098-I1-GC | 2026-04-15 | General construction | 551 5 AVENUE | Interior renovation to include demolition of existing and construction of new partitions for existing office space. no change in use, egress, or occupancy. | $1,300,000 |
| M01228098-S1-MS | 2026-04-02 | Mechanical / HVAC | 551 5 AVENUE | Mechanical work as shown on plans filed herewith. No change in use, egress or ocupancy | $420,000 |
| M08037509-S3-GC | 2026-03-16 | General construction | 480 CANAL STREET | INTERIOR RENOVATION TO PARTIAL 11 FLOOR TENANT SPACE (CATERING/BANQUET HALL) AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY. | $110,000 |
| M01336875-I1-GC | 2026-03-04 | General construction | 570 LEXINGTON AVENUE | general construction work as per plans filed herewith. No change in use, egress or occupancy. | $98,000 |
| M01306051-I1-GC | 2026-03-02 | General construction | 570 LEXINGTON AVENUE | Interior renovation to include demolition of existing and construction of new partitions for existing office space. no change in use, egress, or occupancy. | $279,954 |
| M01336875-S1-MS | 2026-02-26 | Mechanical / HVAC | 570 LEXINGTON AVENUE | mechanical work as shown on plans filed herewith. No change in use, egress or occupancy. | $9,000 |
| M01306051-S1-MS | 2026-02-20 | Mechanical / HVAC | 570 LEXINGTON AVENUE | Mechanical work as shown on plans filed herewith. No change in use, egress or occupancy. | $94,999 |
| M01281952-I1-GC | 2026-02-05 | General construction | 570 LEXINGTON AVENUE | Interior renovation to include demolition of existing and construction of new partitions in suite 500 for existing office space. no change in use, egress, or occupancy. | $889,929 |
| M01281952-S1-MS | 2026-01-09 | Mechanical / HVAC | 570 LEXINGTON AVENUE | Mechanical work as shown on plans filed herewith. No change in use, egress or occupancy. | $202,625 |
| M01259525-I1-GC | 2025-12-12 | General construction | 277 PARK AVENUE | REMOVAL OF INTERIOR NON-LOAD BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $240,000 |
| M01310573-I1-GC | 2025-12-11 | General construction | 277 PARK AVENUE | REMOVAL OF INTERIOR NON-LOAD BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $1,350,000 |
| M01319487-I1-GC | 2025-12-11 | General construction | 277 PARK AVENUE | REMOVAL OF INTERIOR NON-LOAD BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $704,000 |
| M01231845-S1-MS | 2025-10-24 | Mechanical / HVAC | 551 5 AVENUE | Mechanical work as shown on plans filed herewith. No Change in use, egress or occupancy. | $84,968 |
| M01231845-I1-GC | 2025-10-24 | General construction | 551 5 AVENUE | respectfully requesting to submit revised plans showing new field changes. | $279,973 |
| M01246315-I1-GC | 2025-09-29 | General construction | 145 WEST 30 STREET | Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy. | $690,476 |
| M01246315-S1-MS | 2025-09-15 | Mechanical / HVAC | 145 WEST 30 STREET | Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy. Work to include demolition of two condensing units on the roof. | $202,339 |
| M01232273-I1-GC | 2025-09-15 | General construction | 570 LEXINGTON AVENUE | Interior renovation to include demolition of existing and construction of new partitions in suite 4100 for existing office space. no change in use, egress, or occupancy. | $316,983 |
| M01232273-S1-MS | 2025-09-10 | Mechanical / HVAC | 570 LEXINGTON AVENUE | Interior renovation to include demolition of existing and construction of new partitions in suite 4100 for existing office space. no change in use, egress, or occupancy. | $68,388 |
| M01168078-S1-MS | 2025-09-02 | Mechanical / HVAC | 145 WEST 30 STREET | Modifications to existing Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy. | $165,000 |
| M01239548-I1-GC | 2025-08-11 | General construction | 853 BROADWAY | Interior renovations as per plans herewith. No change to use, egress, or occupancy. | $499,950 |
| M01239548-S1-MS | 2025-08-11 | Mechanical / HVAC | 853 BROADWAY | mechanical work as shown here on plans filed herewith. No change in use, egress or occupancy. | $299,970 |
| M01259804-I1-GC | 2025-08-06 | General construction | 132 WEST 31 STREET | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 4th floor (Suite 401) as per plans. No change to use, egress or occupancy. | $9,060 |
| M01232235-I1-GC | 2025-07-29 | General construction | 551 5 AVENUE | Interior renovation of existing offices on the 8th floor. No change to egress, use, or occupancy. | $660,000 |
| M01232235-S1-MS | 2025-07-28 | Mechanical / HVAC | 551 5 AVENUE | Modifications to existing Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy. | $302,000 |
| M01252328-I1-GC | 2025-07-25 | General construction | 122 EAST 42 STREET | Demolition & Construction of Partitions, Doors, Suspended Ceiling, Millwork & Floor Finishes and Paint on Part of 22nd Floor (Suites 2200-2210). No Change to Occupancy, Use or Egre | $64,000 |
| M01168078-I1-GC | 2025-07-22 | General construction | 145 WEST 30 STREET | Interior renovation of 5th floor office. Work to include demolition and construction of interior, non-loadbearing partitions. No change in use, egress, or occupancy. | $156,288 |
| M01206548-I1-MS | 2025-07-17 | Mechanical / HVAC | 551 5 AVENUE | Modifications to existing Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy. | $300,000 |
| M01236099-I1-GC | 2025-06-25 | General construction | 100 AVENUE OF THE AMERICAS | Minor interior demo: removal of existing office front and partitions; patch and paint existing wall and ceiling after demo, patch and replace carpet tiles on the 10th Floor as per | $22,305 |
| M01201257-I1-GC | 2025-06-20 | General construction | 1500 BROADWAY | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 33rd floor (SCG America) as per plans. No change to use, egress or occupancy. | $167,637 |
| M01201269-I1-MS | 2025-06-20 | Mechanical / HVAC | 1500 BROADWAY | Modifications to the existing HVAC system on the 33rd floor (SCG America) as per plans. No change to use, egress or occupancy. | $29,697 |
| M01187162-I1-GC | 2025-06-12 | General construction | 145 WEST 30 STREET | Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy. | $263,883 |
| M01187162-S1-MS | 2025-05-20 | Mechanical / HVAC | 145 WEST 30 STREET | Modifications to existing Mechanical System as per plans filed herewith. No change in use, egress or occupancy. | $205,749 |
| M01115585-S1-MS | 2025-05-07 | Mechanical / HVAC | 488 MADISON AVENUE | Modifications to existing Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy. | $150,000 |
| M01115585-I1-GC | 2025-05-02 | General construction | 488 MADISON AVENUE | Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application. | $900,000 |
| M01172434-I1-GC | 2025-04-18 | General construction | 261 WEST 34 STREET | PROPOSED BUILDOUT OF THE 4TH FLOOR AND LOBBY AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY. | $180,000 |
| M01194959-I1-MS | 2025-04-17 | Mechanical / HVAC | 261 WEST 34 STREET | PROPOSE TO INSTALL NEW DUCTWORK AND ADD ADDITIONAL AIR HANDLER UNITS AS PER PLANS FILED HEREWITH. | $16,000 |
| M01157887-I1-GC | 2025-03-25 | General construction | 145 WEST 30 STREET | Application filed for interior renovations including installation of non-load bearing partitions and finishes, as shown on plans herewith. | $398,402 |
| M01157887-S1-MS | 2025-03-19 | Mechanical / HVAC | 145 WEST 30 STREET | Modifications to existing Mechanical System as per plans filed herewith. No change in use, egress or occupancy. | $269,990 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
