COMPANY RECORD · NEW YORK, NY
Americon Construction Inc — permit history in New York, NY
Americon Construction Inc appears on 181 New York permit records from 2019 through 2026, most often mechanical / hvac (50% of the record).
Licence on record
| Number as published by the authority | Permits filed under it |
|---|---|
| 002765 | 182 |
The number is reproduced as New York published it. A licence appearing on a permit does not prove it is current: check status and expiry with the issuing authority before acting.
Business record held by the regulator
| Name as registered | AMERICON CONSTRUCTION INC |
|---|---|
| Business address on file | 120 BROADWAY SUITE 1120 NEW YORK NY 10271 |
| Business phone on file | (212) 274-0190 |
| Licence number | 2765 |
| Licence type | GENERAL CONTRACTOR |
| Status in the register | ACTIVE |
Read from DOB License Info, published by the NYC Department of Buildings; our copy is from 2026-10-31. The name, address and phone are those the company filed with the regulator, reproduced as published. A permit shows the licence was on file the day it was filed. These rows show what the regulator holds now. The record is matched to Americon Construction Inc by company name, and only where that name resolves to exactly one licence in the register — a rule measured at 99.4% correct against permits whose licence number we already know. Verify with the authority before acting on it.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Mechanical / HVAC | 91 | 50% |
| General construction | 91 | 50% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits | Addresses | Main category | Median declared value | vs previous year |
|---|---|---|---|---|---|
| 2019 | 5 | 5 | Mechanical / HVAC · 100% | $192,000 | — |
| 2020 | 11 | 11 | Mechanical / HVAC · 100% | $74,000 | +120% |
| 2021 | 28 | 12 | General construction · 62% | $140,844 | +155% |
| 2022 | 26 | 12 | General construction · 54% | $329,956 | -7% |
| 2023 | 25 | 13 | General construction · 56% | $400,030 | -4% |
| 2024 | 16 | 9 | General construction · 56% | $197,792 | -36% |
| 2025 | 36 | 14 | General construction · 53% | $325,005 | +125% |
| 2026 | 34 | 15 | Mechanical / HVAC · 50% | $724,180 | -6% |
One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Nuline Mchncl Srvcs, LLC | 7 | 2026-06-11 |
| Aggressive Fire Prot LLC | 6 | 2026-06-09 |
| A&A Plumbing Corp | 5 | 2026-04-16 |
| Tristate Plbg Svcs Corp | 5 | 2026-03-02 |
| Capital Contr P&H Corp | 5 | 2026-06-22 |
| Archer Consultants Group | 3 | 2026-06-23 |
| Par Plumbing Co., Inc | 3 | 2026-07-22 |
| Zone Mechanical LLC | 2 | 2025-02-18 |
| Donato Plumbing, Inc | 2 | 2026-06-15 |
| William C. Gerakaris P&H | 2 | 2025-07-23 |
| A & F Fire Protection Co | 1 | 2026-07-07 |
| A & M Warshaw Plbg & Htg | 1 | 2024-08-30 |
19 companies are named alongside Americon Construction Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Recent job sites and what happened there
277 PARK AVENUE
Mechanical / HVAC permit, 2026-10-02 · Mechanical Systems · declared value $778,360
“Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy”
- Oct 2025 Mechanical / HVAC — Jt Magen & Company Inc
- Oct 2025 Plumbing — Lab Plbg & Htg Co Inc
- Oct 2025 General construction — Ins Construction Corp
- Dec 2025 Fire protection — M & S Buildings Services
- Dec 2025 General construction — Accord Contr And Mgmt Cor
- Dec 2025 General construction — Accord Contr And Mgmt Cor
- Dec 2025 General construction — Accord Contr And Mgmt Cor
- Dec 2025 Plumbing — Par Plumbing Co., Inc
10 COLUMBUS CIRCLE
General construction permit, 2026-07-07 · declared value $1,149,618
“Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, occupancy or egress.”
- Jul 2025 Mechanical / HVAC — Folor Inc
- Sep 2025 Mechanical / HVAC — Structure Tone, LLC
- Oct 2025 General construction — Structure Tone, LLC
- Oct 2025 Fire protection — Abco-Peerless Sprklr Corp
- Jan 2026 Mechanical / HVAC — Structure Tone, LLC
- Jan 2026 General construction — Structure Tone, LLC
- Jan 2026 Plumbing — Tristate Plbg Svcs Corp
- Jan 2026 Fire protection — Abco-Peerless Sprklr Corp
530 WEST 120 STREET
Mechanical / HVAC permit, 2026-06-24 · Mechanical Systems · declared value $2,573,000
“MODIFYING THE EXISTING TERMINAL AIRDUCT DISTRIBUTION SYSTEM AND REPLACING PERIMETER FOUR PIPE CONSOLE FAN COIL UNITS ON 5TH AND 6TH FLOORS. THE MAIN HEATING AND COOLING MECHANICAL UNIT LOCATED ON THE BUILDING PH LEVEL EX”
- Oct 2025 Mechanical / HVAC — Fresh Meadow Mechanical C
- Feb 2026 Mechanical / HVAC — Interstate Mech Svcs Inc
- May 2026 General construction — Henry Restoration Ltd
- Jun 2026 General construction — Americon Construction Inc
- Jun 2026 Mechanical / HVAC — Americon Construction Inc
- Jul 2026 Fire protection — A & F Fire Protection Co
- Jul 2026 Plumbing — Par Plumbing Co., Inc
413 EAST 69 STREET
Mechanical / HVAC permit, 2026-06-15 · Mechanical Systems · declared value $155,000
“PROVIDE HVAC FOR MICROSCOPY LAB IN EXISTING COLLEGE BUILDING INCLUDING DISTRIBUTION FROM EXISTING AIR HANDLER, ADDITIONAL FANS, AIR VALVES, PIPINGDISTRIBUTION AND EQUIPMENT FROM CENTRAL PLANTS.”
- Mar 2026 General construction — Ace Rental Corp
- Jun 2026 General construction — Americon Construction Inc
- Jun 2026 Mechanical / HVAC — Americon Construction Inc
- Jun 2026 Plumbing — Capital Contr P&H Corp
- Jun 2026 Plumbing — Archer Consultants Group
1 BATTERY PARK PLAZA
Mechanical / HVAC permit, 2026-06-15 · Mechanical Systems · declared value $872,910
“Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy”
- Jun 2025 General construction — On-Trac Construction Asso
- Jun 2025 Mechanical / HVAC — On-Trac Construction Asso
- Jun 2025 Plumbing — Full Capacity Fire Corp
- Jun 2025 Fire protection — A&A Plumbing Corp
- Jul 2025 General construction — Structure Tone, LLC
- Jul 2025 Plumbing — Capitol Fire Sprinkler Co
- Jul 2025 Mechanical / HVAC — Structure Tone, LLC
- Jul 2025 Plumbing — A&A Plumbing Corp
72 distinct addresses on record; the 5 most recent are shown with every permit filed at the same address within a year of Americon Construction Inc's. Addresses and scope text appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Sirina Fire Prot Corp | 9 | 2019–2026 |
| William C. Gerakaris P&H | 9 | 2020–2025 |
| Par Plumbing Co., Inc | 8 | 2019–2026 |
| A&A Plumbing Corp | 7 | 2019–2026 |
| Abco-Peerless Sprklr Corp | 7 | 2020–2026 |
| Capital Contr P&H Corp | 5 | 2025–2026 |
| Tristate Plbg Svcs Corp | 5 | 2019–2026 |
| Capitol Fire Sprinkler Co | 5 | 2019–2026 |
Companies that also appear in New York permit records at addresses where Americon Construction Inc filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
181 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01452746-I1-MS | 2026-10-02 | Mechanical / HVAC | 277 PARK AVENUE | Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy | $778,360 |
| Q01441664-I1-MS | 2026-09-04 | Mechanical / HVAC | 159-30 ROCKAWAY BOULEVARD | Mechanical work during interior demolition | $75,000 |
| Q01441659-I1-GC | 2026-09-04 | General construction | 159-30 ROCKAWAY BOULEVARD | Interior demolition on cellar, 1-5 | $1,000,000 |
| M01377751-I1-GC | 2026-07-07 | General construction | 10 COLUMBUS CIRCLE | Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, occupancy or egress. | $1,149,618 |
| M01377751-S1-MS | 2026-07-07 | Mechanical / HVAC | 10 COLUMBUS CIRCLE | Modifications to mechanical systems as per plans filed herewith. No change in use, occupancy or egress. | $299,996 |
| M01361641-S1-MS | 2026-06-24 | Mechanical / HVAC | 530 WEST 120 STREET | MODIFYING THE EXISTING TERMINAL AIRDUCT DISTRIBUTION SYSTEM AND REPLACING PERIMETER FOUR PIPE CONSOLE FAN COIL UNITS ON 5TH AND 6TH FLOORS. THE MAIN HEATING AND COOLING MECHANICAL | $2,573,000 |
| M01361641-I1-GC | 2026-06-16 | General construction | 530 WEST 120 STREET | RENOVATIONS ON 5TH, 6TH & 9TH FLOORS. (AKA LEVEL 600/700/1000). DEMOLITION OF EXISTING NON-LOAD BEARING PARTITIONS, DOORS AND INTERIOR FINISHES, CONSTRUCTION OF NEW NON-LOAD BEARIN | $5,000,300 |
| M01386207-I1-GC | 2026-06-16 | General construction | 277 PARK AVENUE | Interior fit-out of the entire 17th floor including non-loadbearing partitions, offices, meeting rooms and support spaces. | $4,731,232 |
| M01387150-I1-MS | 2026-06-16 | Mechanical / HVAC | 277 PARK AVENUE | Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy. | $1,799,300 |
| M01322852-I1-MS | 2026-06-15 | Mechanical / HVAC | 413 EAST 69 STREET | PROVIDE HVAC FOR MICROSCOPY LAB IN EXISTING COLLEGE BUILDING INCLUDING DISTRIBUTION FROM EXISTING AIR HANDLER, ADDITIONAL FANS, AIR VALVES, PIPINGDISTRIBUTION AND EQUIPMENT FROM CE | $155,000 |
| M01400065-S1-MS | 2026-06-15 | Mechanical / HVAC | 1 BATTERY PARK PLAZA | Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy | $872,910 |
| M01400065-I1-GC | 2026-06-05 | General construction | 1 BATTERY PARK PLAZA | INTERTIOR RENOVATIONS ON THE 3RD FLOOR, AS SHOWN ON DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $2,030,383 |
| M01380928-I1-GC | 2026-06-04 | General construction | 140 BROADWAY | Interior modifications to interior partitions for Suite 2270 | $174,250 |
| M01380928-S1-MS | 2026-06-04 | Mechanical / HVAC | 140 BROADWAY | Modifications to existing mechanical system in suite 2270 | $58,500 |
| M01322852-S2-GC | 2026-06-03 | General construction | 413 EAST 69 STREET | Install new partitions and finishes to accommodate equipment installation on partial 1st floor in the existing lab building as per plans filed herewith only. | $1,000,000 |
| X01349187-S1-MS | 2026-05-26 | Mechanical / HVAC | 4422 THIRD AVENUE | SBH DETOX SUITE - 4422 THIRD AVENUE - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $140,000 |
| X01349187-I1-GC | 2026-05-22 | General construction | 4422 THIRD AVENUE | SBH DETOX SUITE - 4422 THIRD AVENUE - GENERAL CONSTRUCTION INCLUDING MODIFICATIONS TO EXISTING CEILINGS, FLOORS, PARTITIONS AND DOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, | $670,000 |
| M01361930-I1-GC | 2026-04-03 | General construction | 132 WEST 31 STREET | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 8th floor (HITT-Office Buildout) as per plans. No change to use, egress or occup | $1,602,743 |
| M01361894-I1-MS | 2026-04-02 | Mechanical / HVAC | 132 WEST 31 STREET | Modifications to the existing HVAC system on the 8th floor (HITT - Office Buildout) as per plans. No change to use, egress or occupancy | $449,755 |
| M01356497-I1-GC | 2026-04-01 | General construction | 542 WEST 112 STREET | Interior renovations throughout the building | $500,005 |
| B01267521-I1-GC | 2026-03-16 | General construction | 150 55 STREET | GENERAL CONSTRUCTION MODIFICATIONS TO THE INTERIOR FIT OUT PORTIONS OF THE 2ND FLOOR TO ACCOMADATE CPEP AREA INCLUDING CLOSING OFF AN EXISTING ENTRANCE AND CRETAING NEW FENESTRATIO | $1,028,337 |
| B01267521-S1-MS | 2026-03-13 | Mechanical / HVAC | 150 55 STREET | MECHANICAL MODIFICATIONS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $330,000 |
| M01348293-S1-MS | 2026-03-06 | Mechanical / HVAC | 55 HUDSON YARDS | THE NEW DUCTWORK AND PIPING WORK ON THE 29TH FLOOR | $575,900 |
| M01348293-I1-GC | 2026-03-05 | General construction | 55 HUDSON YARDS | Interior Tenant Build-Out | $1,543,987 |
| B01293279-S1-MS | 2026-03-03 | Mechanical / HVAC | 5434 2 AVENUE | Mechanical modifications on 6th floor and roof as shown on plans filed herewith. No change in egress occupancy or use. | $480,000 |
| M01346811-S3-MS | 2026-02-06 | Mechanical / HVAC | 55 HUDSON YARDS | REMOVE ALL EXISTING AIR HANDLERS, CEILING AND FLOOR MOUNTED AIRCONDITIONING UNITS WITH ALL ASSOCIATED DUCTWORK, TERMINAL BOXES,DIFFUSERS, GRILLES, HANGERS AND ACCESSORIES.C. REMOVE | $27,000 |
| M01346811-I1-GC | 2026-02-06 | General construction | 55 HUDSON YARDS | Interior Demo at Level 29 | $184,500 |
| M01285245-S1-MS | 2026-01-27 | Mechanical / HVAC | 902 BROADWAY | Herewith Filing Modification to existing Mechanical System as per plans. | $480,844 |
| B01272473-I1-GC | 2026-01-22 | General construction | 5434 2 AVENUE | INTERIOR MODIFICATION OF AN EXISTING OFFICE AREA INCLUDING INSTALLATION OF NEW NON-BEARING WALL AND DOORS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $107,000 |
| B01272473-S3-MS | 2026-01-22 | Mechanical / HVAC | 5434 2 AVENUE | Augustana - Mobile - MECHANICAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $15,000 |
| M01285245-I1-GC | 2026-01-22 | General construction | 902 BROADWAY | Herewith filing interior renovations of office suites, including new partitions millwork and finishes. | $1,116,131 |
| M01307469-I1-GC | 2026-01-08 | General construction | 776 6 AVENUE | Interior alteration of an existing business office suite for a new tenant on 3rd floor. Scope of work includes interior partitions, ceilings, lighting & decorative finish, millwork | $1,437,002 |
| B01293279-I1-GC | 2026-01-07 | General construction | 5434 2 AVENUE | Interior modificattions on 6th floor as shown on plans filed herewith. No change in egress, occupancy, or use. | $1,020,000 |
| M01307469-S1-MS | 2026-01-07 | Mechanical / HVAC | 776 6 AVENUE | Modifications to existing HVAC system & related piping for new 3rd floor tenant. No change in use, egress or occupancy. | $953,426 |
| M01315740-I1-MS | 2025-12-23 | Mechanical / HVAC | 888 SEVENTH AVENUE | Mechanical work on the 17th and 18th floor as plans filed herewith. No change in use,egress, or occupancy. | $20,000 |
| B01245380-S1-MS | 2025-12-22 | Mechanical / HVAC | 150 55 STREET | MECHANICAL MODIFICATIONS OF EXISTING DUCTWORK DISTRIBUTION TO MAKE WAY FOR INSTALLATION OF IDF CLOSET EQUIPMENT INCLUDING NEW WATER-COOLED AC UNITS AND NEW CHILLED WATER SUPPLY AND | $611,000 |
| B01245380-I1-GC | 2025-12-22 | General construction | 150 55 STREET | INTERIOR MODIFICATION OF PARTITIONS AND FINISHES TO ACCOMODATE ALTERATIONS WITHIN THE EXISTING HOSPITAL BUILDING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $266,667 |
| M01315652-I1-GC | 2025-12-19 | General construction | 888 SEVENTH AVENUE | GENERAL CONSTRUCTION ON THE 17TH AND 18TH FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $350,010 |
| M01233212-I1-GC | 2025-12-11 | General construction | 902 BROADWAY | INTERIOR RENOVATION OF SUITE 1603 ON THE 16TH FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. | $686,553 |
| M01233212-S1-MS | 2025-11-26 | Mechanical / HVAC | 902 BROADWAY | MECHANICAL WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF SUITE 1603 ON THE 16TH FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. | $102,426 |
| M01306727-S1-MS | 2025-11-20 | Mechanical / HVAC | 300 MADISON AVENUE | INTERIOR MECHANICAL MODIFICATIONS ON 12TH FLOOR FOR OFFICE RENOVATION | $135,250 |
| M01306727-I1-GC | 2025-11-06 | General construction | 300 MADISON AVENUE | INTERIOR OFFICE RENOVATION ON THE 12TH FLOOR AS INDICATED ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. | $163,520 |
| M01243573-I1-MS | 2025-10-29 | Mechanical / HVAC | 1185 AVENUE OF THE AMERICAS | Modifications to the existing HVAC system and associated ducts and piping on the 19th & 20th Floors interior office renovation (Lockton) as per plans. No change to use, egress or o | $131,790 |
| M01243483-I1-GC | 2025-10-29 | General construction | 1185 AVENUE OF THE AMERICAS | Minor interior demolition of existing conditions, and installation of new partitions, doors, ceilings, finishes, and stair on the 19th, 20th, and 21st Floors (Lockton) for full flo | $1,602,542 |
| M01277808-S1-MS | 2025-10-02 | Mechanical / HVAC | 300 MADISON AVENUE | MECHANICAL WORK AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION | $939,531 |
| X01228354-S1-MS | 2025-09-23 | Mechanical / HVAC | 4487 3 AVENUE | Herewith filing mechanical modifications for Ambulatory Care Center Renovation. No change in use, egress, or occupancy. | $300,000 |
| X01228354-I1-GC | 2025-09-23 | General construction | 4487 3 AVENUE | Modifications to Ambulatory Care Center including modifications to interior non-load bearing partitions, floors, ceilings, storefront, and related construction as per plans as well | $1,400,000 |
| M01277808-I1-GC | 2025-09-22 | General construction | 300 MADISON AVENUE | INTERIOR RENOVATION OF OFFICES ON 3RD AND 4TH FLOORS AS INDICATED ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION | $3,638,642 |
| M01224092-I1-MS | 2025-09-15 | Mechanical / HVAC | 1185 AVENUE OF THE AMERICAS | Modifications to the existing HVAC system on the 21st floor and extension of core ductwork to accommodate new office layout, as per plans. No change to use, egress or occupancy. | $208,250 |
| M01223754-I1-GC | 2025-09-08 | General construction | 1185 AVENUE OF THE AMERICAS | Installation of new partitions, doors, ceilings and finishes on the 21st Floor (Lockton) for full floor office use. No change to use, egress, or occupancy | $2,080,695 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Search these records
The 181 permits above are a static record through 2026. Select a year above to open that year’s records, or search Americon Construction Inc in New York, NY by address, trade or date range.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.