COMPANY RECORD · NEW YORK, NY

Ins Construction Corp — permit history in New York, NY

Ins Construction Corp appears on 36 New York permit records from 2020 through 2026, most often general construction (60.5% of the record).

Permit categories

CategoryPermitsShare
General construction2360.5%
Mechanical / HVAC1539.5%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20201
20215
20225
202311
20249
20254
20263

Busiest year on record: 2023, with 11 permits. One project can account for several filings, so read this as filing activity rather than workload.

Named on the same permit

Name in sourceLinked permitsLast seen
Ap Plumbing & HVAC LLC12023-03-24
Crossfield Plbg.&Htg12023-12-12
Mclny Plbg & Heating LLC12022-07-22
Par Plumbing Co., Inc12026-07-01
Performance Mechancial12026-07-01

5 companies are named alongside Ins Construction Corp on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
277 PARK AVENUE2026-07-02
1251 AVENUE OF THE AMERICAS2026-04-23
641 5 AVENUE2025-11-17
390 MADISON AVENUE2025-11-06
75 NINTH AVENUE2025-06-17
38 EAST 37 STREET2024-10-29
11 WEST 42 STREET2024-08-01
529 5 AVENUE2024-06-21
750 SEVENTH AVENUE2024-01-26
104 BEDFORD STREET2023-12-19
853 BROADWAY2023-12-05
410 MADISON AVENUE2023-08-29
2047 86 STREET2023-06-26
31 EAST 12 STREET2023-03-09

24 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $675,000, median $55,500. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

36 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
M01386844-I1-GC2026-07-02General construction277 PARK AVENUEFiling herewith general construction scope for removal and installation of non-load bearing partitions and related finishes related to converting non-assembly accessory conference $350,000
M01374946-I1-MS2026-04-23Mechanical / HVAC1251 AVENUE OF THE AMERICASModifications to existing ductwork as per plans filed herewith. No change to use, egress, or occupancy.$45,000
M01374926-I1-GC2026-04-17General construction1251 AVENUE OF THE AMERICASPROJECT ENTAILS AN ALTERATION TYPE 2 OF EXISTING LEASE-HOLDSPACE LOCATED AT 1251 AVENUE OF THE AMERICAS NEW YORK, NY10020. THERE IS TO BE NO CHANGE TO EGRESS, OCCUPANCY ANDUSE. THE$502,500
M01304426-I1-MS2025-11-17Mechanical / HVAC641 5 AVENUEREPLACEMENT OF TWO CONDENSER WATER PUMPS FOR THE EXISTING CHILLED WATER SYSTEM.$162,000
M01310320-I1-GC2025-11-06General construction390 MADISON AVENUEGeneral construction modifications taking place on the 5th & 6th floors as per plans filed herewith. No change in use, egress or occupancy$250,002
M01302406-I1-GC2025-10-30General construction277 PARK AVENUERemoval/installation of interior non-bearing partitions & related finishes, no change in use, egress or occupancy.$357,000
M01194761-I1-GC2025-06-17General construction75 NINTH AVENUEDemolition of existing storefront, to be replaced by new fire-rated overhead coiling doors, Infilling a portion of wall above and widened entry ramp.$185,000
M01098483-S1-MS2024-10-29Mechanical / HVAC38 EAST 37 STREETMECHANICAL WORK FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$7,000
M01098483-I1-GC2024-10-24General construction38 EAST 37 STREETRENOVATION OF 4TH FLOOR SPACE FILED IN CONJUNCTION WITH DOB NOW MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$75,000
M00974260-I1-GC2024-08-01General construction11 WEST 42 STREETHereby filing Storefront refurbishment including replacement of mullions and glass at Retail area, recladding of metal panels, and refinishing of metal work at the facade as shown $65,000
M01060477-I1-GC2024-06-21Mechanical / HVAC529 5 AVENUEProvide non load bearing partitions, doors, ceilings and relocate diffusers in 16th floor office space. No change in egress, use or occupancy.$25,000
M01060477-I1-GC2024-06-21General construction529 5 AVENUEProvide non load bearing partitions, doors, ceilings and relocate diffusers in 16th floor office space. No change in egress, use or occupancy.$25,000
M01060477-I1-MS2024-06-21General construction529 5 AVENUEProvide non load bearing partitions, doors, ceilings and relocate diffusers in 16th floor office space. No change in egress, use or occupancy.$25,000
M01060477-I1-MS2024-06-21Mechanical / HVAC529 5 AVENUEProvide non load bearing partitions, doors, ceilings and relocate diffusers in 16th floor office space. No change in egress, use or occupancy.$25,000
M00976087-I1-MS2024-01-26Mechanical / HVAC750 SEVENTH AVENUEModifications to the existing HVAC System: Removal & cap if duct taps and diffusers; Rebalance VAV, relocate existing diffusers and VAV's on the 16th Floor as per plans (Morgan Sta$60,000
M00976036-I1-GC2024-01-22General construction750 SEVENTH AVENUEMinor interior demolition; Installation of new interior partitions, doors, flooring and finishes on the 16th Floor as per plans (Morgan Stanley Temp Clinic.) No change to use, egre$240,000
M00937982-I1-MS2023-12-19Mechanical / HVAC104 BEDFORD STREETNEW MINI-SPLIT HVAC SYSTEM FOR UNIT 5D$5,000
M00965987-I1-GC2023-12-05General construction853 BROADWAYINTERIOR ALTERATIONS OF EXISTING 17TH FLOOR OFFICE SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS$50,000
M00952917-I1-GC2023-12-05General construction104 BEDFORD STREETINTERIOR RENOVATION IN APT 5D FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$32,725
M00844230-I1-GC2023-08-29General construction410 MADISON AVENUEWork on exterior- Entry Canopy$16,765
B00861863-I1-MS2023-06-26Mechanical / HVAC2047 86 STREETLEGALIZATION OF HVAC ON 1ST FLOOR ROOF AS PER PLANS.$0
B00861860-I1-MS2023-06-22Mechanical / HVAC2047 86 STREETHEREWITH FILING FOR THE INSTALLATION OF NEW HVAC UNITS AND CONNECT TO EXISTING DUCTWORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$264,000
M00848616-I1-MS2023-04-10Mechanical / HVAC1251 AVENUE OF THE AMERICASModifications to existing mechanical systems as per plans filed herewith. No change in use, egress or occupancy$100,000
M00848591-I1-GC2023-04-10General construction1251 AVENUE OF THE AMERICASRemoval and instillation of interior non load bearing partitions and related finishes. No change in use, egress or occupancy$500,000
M08004507-I1-GC2023-03-09General construction31 EAST 12 STREETINTERIOR RENOVATION IN APT 12A FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$20,000
M00819433-I1-GC2023-02-16General construction1251 6 AVENUEGeneral Construction Modification as per plan filed herewith. No change to the use, bulk, egress, or occupancy proposed under this application$78,634
M07997946-I1-MS2023-02-09Mechanical / HVAC12 WEST 27 STREETMECHANICAL SCOPE: REPLACE AIR COMPRESSOR FOR FIRE SPRINKLER TANK. (WORK ON INSIDE SPRINKLER TANK ROOM ON ROOF).$20,000
M00760809-I1-GC2022-08-05General construction100 AVENUE OF THE AMERICASInterior renovation as per plans filed herewith. No change in use, occupancy or egress.$150,000
M00760815-I1-MS2022-08-04Mechanical / HVAC100 AVENUE OF THE AMERICASModification to Mechanical systems as per plans filed herewith. No change in use, occupancy or egress.$35,000
B00763693-I1-GC2022-07-21General construction135 EASTERN PARKWAYINTERIOR RENOVATION IN APT 7J. NO CHANGE OT USE, OCCUPANY OR EGRESS.$51,000
M00638304-I1-GC2022-05-25General construction155 6 AVENUEINTERIOR BUILDOUT AS PER PLANS .$675,000
M00657784-I1-MS2022-03-03Mechanical / HVAC100 AVENUE OF THE AMERICASMODIFICATION TO MECHANICAL SYSTEMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE OCCUPANCY OR EGRESS.$20,000
M00605885-I1-GC2021-12-17General construction100 AVENUE OF THE AMERICASINTERIOR RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE ACCUPANCY OR EGRESS.$150,000
M00579495-I1-GC2021-10-08General construction444 EAST 86 STREETINTERIOR APARTMENT RENOVATIONS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$64,000
B00514284-I1-GC2021-08-17General construction225 13 STREETINTERIOR APARTMENT RENOVATIONS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$106,000
M00390712-I1-MS2021-06-16Mechanical / HVAC610 WEST 110 STREETMECHANICAL WORK IN APT 14A FILED IN CONJUNCTION WITH DOB NOW PL AND DOB HUB FILINGS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.$7,500
B00469929-I1-GC2021-05-13General construction505 12 STREETINTERIOR APARTMENT RENOVATION. NO CHANGE TO USE EGRESS OF OCCUPANCY.$30,000
M00339119-I1-MS2020-08-28Mechanical / HVAC1585 BROADWAYModification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.$10,002

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →