COMPANY RECORD · NEW YORK, NY
Fresh Meadow Mechanical C — permit history in New York, NY
Fresh Meadow Mechanical C appears on 42 New York permit records from 2019 through 2026, most often mechanical / hvac (80% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Mechanical / HVAC | 36 | 80% |
| General construction | 9 | 20% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 1 |
| 2020 | 3 |
| 2021 | 5 |
| 2022 | 6 |
| 2023 | 12 |
| 2024 | 9 |
| 2025 | 5 |
| 2026 | 4 |
Busiest year on record: 2023, with 12 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Fresh Meadow Mech Plbg Ll | 1 | 2023-09-13 |
1 companies are named alongside Fresh Meadow Mechanical C on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 150 55 STREET | 2026-08-27 |
| 620 8 AVENUE | 2026-05-20 |
| 177 FT WASHINGTON AVENUE | 2026-03-09 |
| 530 WEST 120 STREET | 2025-10-21 |
| 9 METROTECH CENTER | 2025-10-02 |
| 355 BARD AVENUE | 2025-07-31 |
| 104 WEST 40 STREET | 2025-02-27 |
| 506 LENOX AVENUE | 2024-10-22 |
| 56-45 MAIN STREET | 2024-10-10 |
| 5645 MAIN STREET | 2024-09-30 |
| 4520 33 STREET | 2024-04-24 |
| 605 THIRD AVENUE | 2024-04-17 |
| 299 PARK AVENUE | 2024-03-07 |
| 1269 LEXINGTON AVENUE | 2024-01-18 |
33 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,000 to $6,000,000, median $500,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
42 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| B01107884-S3-MS | 2026-08-27 | Mechanical / HVAC | 150 55 STREET | NYULHB - Install new 48 diameter, 316 stainless steel chimney liner within existing boiler stack to height 175'-0, including new breeching connections serving existing low pressure | $2,000,000 |
| B01107884-S1-MS | 2026-08-26 | Mechanical / HVAC | 150 55 STREET | NYU - 150 55TH STREET - Mechanical work on first floor Associated with the installation of (2) New 49.5 HP, Dual fuel boilers. Boiler work and plumbing work filed under separate | $260,000 |
| M01003695-I1-MS | 2026-05-20 | Mechanical / HVAC | 620 8 AVENUE | NYT-RECONFIGURATION OF COGEN HEAT REJECTION SYSTEM INCLUSIVE OF SILENCER REPLACEMENT AND RELATED MECHANICAL PIPING MODIFICATIONS AS PER PLANS FILED. | $340,000 |
| M01314744-I1-MS | 2026-03-09 | Mechanical / HVAC | 177 FT WASHINGTON AVENUE | MILSTEIN CWP: MODIFICATIONS TO HVAC DUCTWORK AND PIPING INCLUDING THE INSTALLATION OF 6 CONDENSER WATER PUMPS TO ACCOMMODATE THE CHILLER REPLACEMENT IN THE EXISTING MILSTEIN HOSPIT | $4,000,000 |
| M00869564-I1-MS | 2025-10-21 | Mechanical / HVAC | 530 WEST 120 STREET | Refurbishment of the existing Heating and Ventilation (H&V) Units within the boiler plant. There are five (5) H&V Units in total. The project also includes the replacement of one ( | $2,268,000 |
| B01238145-I1-MS | 2025-10-02 | Mechanical / HVAC | 9 METROTECH CENTER | REPLACEMENT OF 4 PACKAGED UNIT WITH A TOTAL CAPACITY OF 10.5 TONS ON THE GROUND FLOOR, FLOOR 007, FLOOR 008. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. | $38,500 |
| S01259498-S1-MS | 2025-07-31 | Mechanical / HVAC | 355 BARD AVENUE | Installation / retrofit of two selective catalytic reduction systems associated with the existing cogeneration plant | $700,000 |
| S01259498-I1-GC-CX | 2025-07-24 | General construction | 355 BARD AVENUE | Structural work in conjunction with the Installation / retrofit of two selective catalytic reduction systems associated with the existing cogeneration plant | $300,000 |
| M01135927-S1-MS | 2025-02-27 | Mechanical / HVAC | 104 WEST 40 STREET | THE REMOVAL OF (2) EXISTING 310 TON STEAM ABSORPTION CHILLERS AND THEINSTALLATION OF (2) NEW 310 TON ELECTRIC CENTRIFUGAL MACHINES., A NEW SIDESTREAM SAND FILTER ON THE CONDENSER W | $200,000 |
| M01108108-I1-MS | 2024-10-22 | Mechanical / HVAC | 506 LENOX AVENUE | Installation of mechanical piping for the 3 new boilers in the cellar. | $4,000,000 |
| Q00982440-I1-GC | 2024-10-10 | General construction | 56-45 MAIN STREET | NYPQ - AC 3, 4, A 5 REPLACEMENT - GENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH INCLUDING CEILING, FLOOR, WALL AND DOOR MODIFICATIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $200,000 |
| Q00962203-I1-MS | 2024-09-30 | Mechanical / HVAC | 5645 MAIN STREET | NYPQ - AC 3, 4, 5 REPLACEMENTS - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $1,300,000 |
| M00942349-I1-GC | 2024-09-10 | General construction | 506 LENOX AVENUE | CONTRACTOR TO REMOVE ALL STEAM, WATER AND CONDENSATE PIPING,EQUIPMENT, DUCTWORK, AIR OUTLETS, ETC, WITHIN THE BOILER ROOM AND IS NOTACTIVE OR TO BE REUTILIZED. | $1,500,000 |
| M00942349-I1-GC | 2024-09-10 | Mechanical / HVAC | 506 LENOX AVENUE | CONTRACTOR TO REMOVE ALL STEAM, WATER AND CONDENSATE PIPING,EQUIPMENT, DUCTWORK, AIR OUTLETS, ETC, WITHIN THE BOILER ROOM AND IS NOTACTIVE OR TO BE REUTILIZED. | $1,500,000 |
| Q00939760-I1-MS | 2024-04-24 | Mechanical / HVAC | 4520 33 STREET | Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application. | $731,500 |
| M00965490-I1-MS | 2024-04-17 | Mechanical / HVAC | 605 THIRD AVENUE | Mechanical modifications to take place on cellar floor as per drawings filed herewith. No change in use, egress, or occupancy. | $300,000 |
| M00963752-I1-MS | 2024-03-07 | Mechanical / HVAC | 299 PARK AVENUE | Mechanical modifications taking place on the first floor as per drawings filed herewith. no change in use, egress, or occupancy. | $365,095 |
| M00826792-I1-MS | 2024-01-18 | Mechanical / HVAC | 1269 LEXINGTON AVENUE | REPLACEMENT OF 10 TON CONDENSING UNIT ON THE 6TH FLOOR. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. | $35,750 |
| M00958432-I1-GC-CX | 2023-12-05 | General construction | 506 LENOX AVENUE | Installation of (2) temporary emergency boilers | $50,000 |
| M00958432-I1-GC-CX | 2023-12-05 | Mechanical / HVAC | 506 LENOX AVENUE | Installation of (2) temporary emergency boilers | $50,000 |
| M00942349-I1-MS | 2023-11-27 | General construction | 506 LENOX AVENUE | CONTRACTOR TO REMOVE ALL STEAM, WATER AND CONDENSATE PIPING,EQUIPMENT, DUCTWORK, AIR OUTLETS, ETC, WITHIN THE BOILER ROOM AND IS NOTACTIVE OR TO BE REUTILIZED. | $1,500,000 |
| M00942349-I1-MS | 2023-11-27 | Mechanical / HVAC | 506 LENOX AVENUE | CONTRACTOR TO REMOVE ALL STEAM, WATER AND CONDENSATE PIPING,EQUIPMENT, DUCTWORK, AIR OUTLETS, ETC, WITHIN THE BOILER ROOM AND IS NOTACTIVE OR TO BE REUTILIZED. | $1,500,000 |
| M00924288-I1-GC | 2023-09-01 | General construction | 506 LENOX AVENUE | Installation of (2) temporary emergency boilers | $50,000 |
| M00622532-I1-MS | 2023-07-27 | Mechanical / HVAC | 110 ANDES ROAD | MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS TO INCLUDE HVAC INSTALLATION AND ASSOCIATED DUCT WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS | $20,000 |
| M00825698-I1-MS | 2023-06-30 | Mechanical / HVAC | 777 THIRD AVENUE | Revised chiller removal from existing CH-1 to existing CH-2. Revised location of new electric chillers in place of existing CH-2. New tags revised to align with the existing to rem | $650,000 |
| M00825665-I1-MS | 2023-06-30 | Mechanical / HVAC | 437 MADISON AVENUE | REPLACE CHILLER AND ASSOCIATED PIPING. | $480,000 |
| M00862093-I1-GC | 2023-05-17 | General construction | 1200 FDR DRIVE | Herewith filing general construction modifications for NYU Langone Access Platform. No change in use, egress, or occupancy. | $100,000 |
| M00479888-I1-MS | 2023-03-23 | Mechanical / HVAC | 89 CONVENT AVENUE | In kind replacement of rooftop unit. Addition of cooling for server room. Addition of cooling/dehumidification in lab. | $250,040 |
| M00750590-I1-MS | 2023-02-27 | Mechanical / HVAC | 731 LEXINGTON AVENUE | Filing herewith for HVAC ductwork as per plans filed herewith. | $325,000 |
| M08038543-I1-MS | 2023-02-17 | Mechanical / HVAC | 11 PENN PLAZA | Chiller replacement on sub-cellar 2 as indicated on drawings | $6,000,000 |
| M00793455-I1-MS | 2022-12-06 | Mechanical / HVAC | 1200 FDR DRIVE | ENERGY BUILDING - MECHANICAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $700,000 |
| B00634029-I1-MS | 2022-07-13 | Mechanical / HVAC | 1 METROTECH CENTER | INSTALLATION OF CHILLER UNITS WITH RELATED PIPING AS PER PLANS FILED HEREWITH. | $1,750,000 |
| B00634085-I1-MS | 2022-06-18 | Mechanical / HVAC | 2 METROTECH CENTER | APPLICATION FILED TO OBTAIN REQUIRED COC FOR CHILLERS INSTALLED UNDER #301826549 AS PER PLANS FILED HEREWITH. | $1,000 |
| M00622045-I1-MS | 2022-04-25 | Mechanical / HVAC | 3 TIMES SQUARE | Chilled Water Riser Repurposing | $3,599,993 |
| M00622021-I1-MS | 2022-02-01 | Mechanical / HVAC | 3 TIMES SQUARE | New chilled water piping for existing and future AC units. | $500,000 |
| B00644735-I1-MS | 2022-01-20 | Mechanical / HVAC | 625 ATLANTIC AVENUE | REPLACEMENT OF 4 UNITS ON THE ROOFTOP WITH A TOTAL CAPACITY OF 160 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. | $292,300 |
| M00361546-I1-MS | 2021-08-11 | Mechanical / HVAC | 415 COLUMBUS AVENUE | PROPOSE TO UPGRADE STEAM PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $800,000 |
| M00501439-I1-GC | 2021-06-25 | General construction | 305 WEST 28 STREET | EXCAVATION AND SHORING, AND SEALING OF OPENING TO RECEIVED PIPPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $20,000 |
| M00496070-I1-MS | 2021-06-15 | Mechanical / HVAC | 770 BROADWAY | Mechanical work associated with the replacement of chiller in the sub-cellar as indicated on drawings. | $883,000 |
| M00487760-I1-GC | 2021-04-09 | General construction | 424 EAST 34 STREET | This application is being filed for the removal of two silencers and existing silencer supports for support of installation of a pollution control system for two emergency generat | $323,000 |
| M00482285-I1-MS | 2021-04-07 | Mechanical / HVAC | 424 EAST 34 STREET | This application is being filed to install a pollution control system for two existing emergency generators on the Roof of Kimmel Pavilion. | $323,000 |
| M00304134-I1-MS | 2020-07-22 | Mechanical / HVAC | 1675 BROADWAY | REPLACEMENT OF AC UNITS AS SHOWN ON PLANS FILED HEREWITH AT 31st THRU 35TH FLOOR | $585,000 |
| M00265633-I1-MS | 2020-03-18 | Mechanical / HVAC | 1000 10 AVENUE | Mount Sinai - Surgical Platform Phase 5 - Mechanical modifications as per plans filed herewith. No change in use, egress, or occupancy. | $663,117 |
| M00272797-I1-MS | 2020-02-11 | Mechanical / HVAC | 641 LEXINGTON AVENUE | REPLACING STEAM DRIVEN CHILLER WITH NEW ELECTRIC DRIVE CHILLER IN THE CELLAR. NO CHANGE IS USE, EGRESS, OR OCCUPANCY | $600,000 |
| M00227080-I1-MS | 2019-11-08 | Mechanical / HVAC | 1109 5 AVENUE | Interior Renovation associated with Mechanical Scope - Chiller upgrade. No change of use, egress or occupancy. | $500,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →