COMPANY RECORD · NEW YORK, NY
Fresh Meadow Mech Plbg Ll — permit history in New York, NY
Fresh Meadow Mech Plbg Ll appears on 37 New York permit records from 2020 through 2026, all of them plumbing.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 37 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2020 | 4 |
| 2021 | 8 |
| 2022 | 1 |
| 2023 | 3 |
| 2024 | 6 |
| 2025 | 7 |
| 2026 | 8 |
Busiest year on record: 2021, with 8 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Bond Civil & Utility Cons | 1 | 2024-10-10 |
| Fresh Meadow Mechanical C | 1 | 2023-09-13 |
| Galvin Brothers Inc | 1 | 2026-08-25 |
| James E Fitzgerald Inc | 1 | 2025-10-16 |
| Jrcruz Corp | 1 | 2026-04-07 |
| Steven Dubner Landscaping | 1 | 2026-08-10 |
6 companies are named alongside Fresh Meadow Mech Plbg Ll on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 95 PROSPECT PARK WEST | 2026-08-27 |
| 651 WEST 125 STREET | 2026-08-10 |
| 801 BAYRIDGE PARKWAY | 2026-07-23 |
| 911 3 AVENUE | 2026-07-21 |
| 1 RODMANS NECK PATH | 2026-04-07 |
| 715 EAST 40 STREET | 2026-02-23 |
| 62-27 97 PLACE | 2025-11-26 |
| 19-80 38 STREET | 2025-11-26 |
| 151 MORGAN AVENUE | 2025-10-16 |
| 8302 COLONIAL ROAD | 2025-10-15 |
| 315 WEST 25 STREET | 2025-08-20 |
| 701 BAY 32 STREET | 2025-07-02 |
| 1201 ADEE AVENUE | 2025-04-24 |
| 287 MASPETH AVENUE | 2024-10-10 |
33 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $296,782,098, median $81,380. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
37 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| B01028153-S2-PL | 2026-08-27 | Plumbing | 95 PROSPECT PARK WEST | LOWER VALE-EXTERIOR PLUMBING WORK IN CONJUNCTION WITH LANDSCAPING/SITEWORK AT THE PROSPECT PARK VALE OF CASHMERE. | $320,000 |
| B01088624-S3-PL | 2026-08-25 | Plumbing | 95 PROSPECT PARK WEST | UPPER VALE-EXTERIOR PLUMBING WORK IN CONJUNCTION WITH LANDSCAPING/SITEWORK AT THE PROSPECT PARK VALE OF CASHMERE. | $382,435 |
| B01028153-S5-PL | 2026-08-25 | Plumbing | 95 PROSPECT PARK WEST | LOWER VALE-CIVIL SITE DRAINAGE IMPROVEMENTS AT PROSPECT PARK-VALE OF CASHMERE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $320,000 |
| M01395398-S2-PL | 2026-08-10 | Plumbing | 651 WEST 125 STREET | Proposed work includes new on-site stormwater retention gallery | $842,226 |
| B00996114-I1-PL | 2026-07-23 | Plumbing | 801 BAYRIDGE PARKWAY | Installation of booster pump within basement of building. No change in use, egress or occupancy. | $50,000 |
| B01392213-I1-PL | 2026-07-21 | Plumbing | 911 3 AVENUE | Install stormwater network at existing NYC Parks D'Emic playground. Plumbing scope not attached to any existing building. All stormwater/piping/det tank/drain work done at existing | $4,000,000 |
| X08031226-S1-PL | 2026-04-07 | Plumbing | 1 RODMANS NECK PATH | Storm drainage piping/structures, sanitary sewer/forcemain, and domestic/fire-water services. Related DOB Now Job numbers include: X08028705-l1, X08031226-I1, X08031226-S1, X080330 | $296,782,098 |
| B00826999-I1-PL | 2026-02-23 | Plumbing | 715 EAST 40 STREET | Pump replacement, new secondary RPZ for irrigation | $74,326 |
| Q00894565-I1-PL | 2025-11-26 | Plumbing | 62-27 97 PLACE | INSTALATION OF NEW 2 WATER METER AND RPZ IN EXISTINGCOMFORT STATION. THE EXISTING WATER LINE WILL BE CUT AND CAPPED ANDNEW 2 WATER SERVICE WILL BE INSTALLED. THERE IS NO CHANGE IN | $34,800 |
| Q08037647-I1-PL | 2025-11-26 | Plumbing | 19-80 38 STREET | Replacement of existing RPZ and Water Meter with new lead free RPZ and Water Meter, adding new DCVs. | $73,980 |
| B00984731-S9-PL | 2025-10-16 | Plumbing | 151 MORGAN AVENUE | Proposed civil plumbing work filed in conjunction with NB application B00984731-I1 | $0 |
| B00778702-I1-PL | 2025-10-15 | Plumbing | 8302 COLONIAL ROAD | INSTALLATION OF NEW meter and 3 RPZ inside EXISTING building. Plans conform to BC 28-104.7. | $10,000 |
| M00979411-I1-PL | 2025-08-20 | Plumbing | 315 WEST 25 STREET | Replacement of Diesel generator with a new natural gas generator per plans submitted herewith. No change in use, egress or occupancy. | $400,000 |
| Q00556769-I1-PL | 2025-07-02 | Plumbing | 701 BAY 32 STREET | Architectural/ structural park improvements as per plans. Work includes Flagpole, Boardwalk, sloped walkway, boulder wall. Flood lights, play ground, kayak station. | $3,000 |
| X00843981-I1-PL | 2025-04-24 | Plumbing | 1201 ADEE AVENUE | Provide New Back flow Preventer, water-waste piping and new drinking fountain | $54,999 |
| B08050740-S2-PL | 2024-10-10 | Plumbing | 287 MASPETH AVENUE | Filing for plumbing site work in conjunction with a new building. | $735,920 |
| Q00962207-I1-PL | 2024-10-09 | Plumbing | 5645 MAIN STREET | NYPQ - AC 3,4, & 5 REPLACEMENTS - PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE N USE, EGRESS, OR OCCUPANCY. | $250,000 |
| M01075406-I1-PL | 2024-10-03 | Plumbing | 506 LENOX AVENUE | Modifications to the natural gas piping system at cellar level to support new boilers, installing new compressed air systems, and removing existing bathroom pipes. Additionally, ne | $7,000,000 |
| S00501191-I1-PL | 2024-08-22 | Plumbing | 501 BRIELLE AVENUE | installing cold water pipe on first floor inside of the building that will connect to underground water line going to outdoor plumbing fixture. | $6,000 |
| S00751028-I1-PL | 2024-07-25 | Plumbing | 450 REAR BUEL AVENUE | PROPOSED INSTALLATION OF NEW 2 RPZ TO BE LOCATED INSIDE THE MECHANICAL ROOM OF THE EXISTING COMFORT STATION INSIDE OF DONGAN PLAYGROUND. ALL AS PER PLANS FILED HEREWITH. NO CHANGE | $29,000 |
| Q01041925-I1-PL | 2024-05-13 | Plumbing | 45-20 33 STREET | ALTERATIONS TO EXISTING PLUMBING FIXTURES AS PER PLANS FILED HEREWITH | $30,000 |
| Q00496102-I1-PL | 2023-11-06 | Plumbing | 64-02 30 AVENUE | NYCHA BOILER - Installation of a New RPZ in existing Comfort Station. | $103,797 |
| M00924288-S2-PL | 2023-09-13 | Plumbing | 506 LENOX AVENUE | THIS APPLICATION IS FILED FOR THE INSTALLATION OF TWO(2) 1,000 HP TEMPORARY BOILERS, AND A CONDENSATESTORAGE TANK ALONG 136TH STREET AND WEST OF 5THAVE. NATURAL GAS PIPING IS BEING | $150,000 |
| M00750594-I1-PL | 2023-02-10 | Plumbing | 731 LEXINGTON AVENUE | Modification to existing plumbing system as per plans filed herewith. | $75,000 |
| M00476136-I1-PL | 2022-12-07 | Plumbing | 1901 FIRST AVENUE | Filed herewith underground plumbing as shown on drawings. Related civil application filed under DOBNOW #M00476128 | $6,786,000 |
| M00583861-I1-PL | 2021-12-15 | Plumbing | 251 MERCER STREET | Filing herewith application for plumbing modifications pertaining to boiler replacement. No change in use, egress or occupancy. | $800,000 |
| M00622015-I1-PL | 2021-11-05 | Plumbing | 251 MERCER STREET | MODIFICATION OF NATURAL GAS PIPING TO SERVE TWO TEMPORARY BOILERS OUTSIDE OF THE BUILDING. DOB NOW FUEL STORAGE FILING #M00622973 AND BOILER FILING #M00622725. | $15,000 |
| B00342557-I1-PL | 2021-09-29 | Plumbing | 38 BARTLETT STREET | REMOVE PL PIPING IN CITY PARK COMFORT STATION. INSTALL NE PIPING, WATER METER AND RPZ. NO CHANGE TO USE, EGRESS OR OCCUPANCY | $18,000 |
| M00552400-I1-PL | 2021-09-22 | Plumbing | 770 BROADWAY | Plumbing work associated with the replacement of chiller in the sub-cellar as indicated on drawings. | $15,000 |
| B00517158-I1-PL | 2021-08-04 | Plumbing | 2 METROTECH CENTER | PLUMBING WORK ASSOCIATED WITH BOILER INSTALLATION ON 11TH FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $190,000 |
| B00464915-I1-PL | 2021-05-26 | Plumbing | 150 55 STREET | Reactivate gas connection to existing roof top Cogen plant & Install new gas shut off valve. | $15,000 |
| B00320386-I1-PL | 2021-03-03 | Plumbing | 608 LEFFERTS AVENUE | APPLICATION FILED FOR NEW RPZ AND WATER METER AS PER PLANS | $40,000 |
| Q00439224-I1-PL | 2021-01-07 | Plumbing | 28-30 122 STREET | PROPOSED PLUMBING WORK FOR GAS SEWER LINE CONNECTIONS. | $180,000 |
| X00233936-I1-PL | 2020-07-17 | Plumbing | 499 ST ANNS AVENUE | Post Approval Amendment being filed to remove fire resistant penetrations and joints from the required items list as it is not required for this scope of work as per the approved p | $5,000 |
| S00226073-I1-PL | 2020-04-02 | Plumbing | 18B SNEDEN AVENUE | FILING HEREWITH PLUMBING WORK ASSOCIATED WITH THE INSTALLATION OF BLOOM ENERGY OUTDOOR NATURAL GAS ENERGY SERVERS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS AP | $141,810 |
| S00225998-I1-PL | 2020-03-27 | Plumbing | 18A SNEDEN AVENUE | FILING HEREWITH PLUMBING WORK ASSOCIATED WITH THE INSTALLATION OF BLOOM ENERGY OUTDOOR NATURAL GAS ENERGY SERVERS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS A | $125,400 |
| X00322526-I1-PL | 2020-03-10 | Plumbing | 355 FOOD CENTER DRIVE | Removal & Installation of Gas Piping & Gas Water Heaters. As per plans file herewith, no change to use, occupancy or egress. | $81,380 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
