COMPANY RECORD · NEW YORK, NY
Nuline Mchncl Srvcs, LLC — permit history in New York, NY
Nuline Mchncl Srvcs, LLC appears on 88 New York permit records from 2022 through 2026, most often fire protection (93.6% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Fire protection | 88 | 93.6% |
| Plumbing | 6 | 6.4% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2022 | 4 |
| 2023 | 12 |
| 2024 | 13 |
| 2025 | 39 |
| 2026 | 26 |
Busiest year on record: 2025, with 39 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Turner Construction Compa | 8 | 2026-04-29 |
| Monadnock Construction In | 8 | 2026-06-12 |
| Cross Management Corp | 7 | 2025-01-15 |
| Americon Construction Inc | 7 | 2026-06-11 |
| Lorich Construction Manag | 6 | 2025-05-28 |
| Jt Magen & Company Inc | 3 | 2025-07-21 |
| Lettire Construction Corp | 2 | 2025-12-12 |
| Benchmark Builders LLC | 2 | 2026-01-30 |
| Congress Builders LLC | 2 | 2026-07-28 |
| Monadnock Gen'l Cont Inc | 2 | 2024-10-09 |
| Nucor Construction Corp | 2 | 2026-07-02 |
| Schimenti Construction Co | 2 | 2026-04-23 |
17 companies are named alongside Nuline Mchncl Srvcs, LLC on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 35-53 41 STREET | 2026-08-25 |
| 35-10 STEINWAY STREET | 2026-07-28 |
| 202 BROOME STREET | 2026-07-02 |
| 1484 1 AVENUE | 2026-06-12 |
| 55 HUDSON YARDS | 2026-06-11 |
| 838 BROADWAY | 2026-04-29 |
| 1 WALL STREET | 2026-04-28 |
| 132 WEST 31 STREET | 2026-04-27 |
| 200 VARICK STREET | 2026-04-23 |
| 1370 AVENUE OF THE AMERICAS | 2026-04-23 |
| 148 2 STREET | 2026-03-25 |
| 29-01 216 STREET | 2026-03-02 |
| 370 7 AVENUE | 2026-02-13 |
| 335 8 AVENUE | 2026-02-11 |
60 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $487,150, median $44,544. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
88 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| Q01254595-S5-EW-SD | 2026-08-25 | Fire protection | 35-53 41 STREET | NYC DEV HUB: Sprinkler/Standpipe work in conjunction with new building construction. | $0 |
| Q01254595-S5-EW-SP | 2026-08-25 | Fire protection | 35-53 41 STREET | NYC DEV HUB: Sprinkler/Standpipe work in conjunction with new building construction. | $0 |
| Q01275800-Z1-EW-SP | 2026-07-28 | Fire protection | 35-10 STEINWAY STREET | Installation of a new sprinkler/standpipe system in conjunction with the new building. | $0 |
| Q01275800-Z1-EW-SD | 2026-07-21 | Fire protection | 35-10 STEINWAY STREET | Installation of a new sprinkler/standpipe system in conjunction with the new building. | $0 |
| M01301909-S3-EW-SP | 2026-07-02 | Fire protection | 202 BROOME STREET | FILING HEREWITH SPRINKLER WORK IN CONJUNCTION WITH INTERIOR RENOVATION AS PER PLANS. | $100,000 |
| M01128646-S8-EW-SP | 2026-06-12 | Fire protection | 1484 1 AVENUE | Sprinkler/Standpipe work in conjunction with NB # M01128646 | $0 |
| M01128646-S8-EW-SD | 2026-06-12 | Fire protection | 1484 1 AVENUE | Sprinkler/Standpipe work in conjunction with NB # M01128646 | $0 |
| M01348293-S3-EW-SP | 2026-06-11 | Fire protection | 55 HUDSON YARDS | Modification to existing fixtures | $82,325 |
| M01320152-S4-EW-SP | 2026-04-29 | Fire protection | 838 BROADWAY | MODIFICATION TO EXISTING SYSTEM AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $102,705 |
| M01302222-S3-EW-SP | 2026-04-28 | Fire protection | 1 WALL STREET | Sprinkler work in conjunction with tenant fit-out in Retail 1. Alt 1 121190086 | $44,088 |
| M01361913-I1-EW-SP | 2026-04-27 | Fire protection | 132 WEST 31 STREET | Modifications to the existing sprinkler system on the 8th floor (HITT - office Buildout) as per plans. No change to use, egress or occupancy. | $104,099 |
| M01295904-S3-EW-SP | 2026-04-23 | Fire protection | 200 VARICK STREET | Sprinkler and standpipe work as per drawings filed herewith. | $450,000 |
| M01313682-I1-EW-SP | 2026-04-23 | Fire protection | 1370 AVENUE OF THE AMERICAS | SPRINKLER MODIFICATIONS TAKING PLACE ON THE 32ND FLOOR (33RD FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $20,000 |
| M01295904-S3-EW-SD | 2026-04-23 | Fire protection | 200 VARICK STREET | Sprinkler and standpipe work as per drawings filed herewith. | $450,000 |
| B00656974-I1-EW-SD | 2026-03-25 | Fire protection | 148 2 STREET | Install combined sprinkler/standpipe system as per plans filed. No change to use, egress oroccupancy. Filed in conjunction with NB# B00640761. | $1,000 |
| B00656974-I1-EW-SP | 2026-03-25 | Fire protection | 148 2 STREET | Install combined sprinkler/standpipe system as per plans filed. No change to use, egress oroccupancy. Filed in conjunction with NB# B00640761. | $1,000 |
| Q01122030-I1-EW-SP | 2026-03-02 | Fire protection | 29-01 216 STREET | SPRINKLER SCOPED FILED FOR SPRINKLER HEAD REMOVALS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $19,350 |
| M01311824-S3-EW-SP | 2026-02-13 | Fire protection | 370 7 AVENUE | Sprinkler work as shown on plans filed herewith. No change in use egress or occupancy. | $12,000 |
| M01356114-I1-EW-SP | 2026-02-11 | Fire protection | 335 8 AVENUE | LIDL CHELSEA - FILING HEREWITH FOR THE SPRINKLER WORK RELATED TO A STORE FIT OUT. THERE WILL BE NO CHANGE IN USE, EGGRESS OR OCCUPANCY UNDER THIS APPPLICATION. | $72,250 |
| M01337860-I1-EW-SP | 2026-02-11 | Fire protection | 1155 6 AVENUE | Sprinkler work for Liberty Mutual on 10th floor | $96,998 |
| M01346811-S2-EW-SP | 2026-02-06 | Fire protection | 55 HUDSON YARDS | Modifications of existing sprinkler system | $30,000 |
| M01243586-I1-EW-SP | 2026-02-03 | Fire protection | 1185 AVENUE OF THE AMERICAS | Modifications to the existing sprinkler system on the 19th & 20th Floors (Lockton), as per plans. No change to use, egress, or occupancy. | $105,454 |
| M01344050-S3-EW-SP | 2026-01-30 | Fire protection | 45 EAST 53 STREET | REMOVE 52 SPRINKLER HEADS. INSTALL 9 NEW TEMPORARY SPRINKLER LOOP HEADS AND PIPING. INSTALL 51 NEW PERMANENT SPRINKLER HEADS AND PIPING. | $33,000 |
| M01233212-S4-EW-SP | 2026-01-23 | Fire protection | 902 BROADWAY | FILING TO INSTALL 38 SPRINKLER HEADS ON THE 16 FLOOR. | $15,000 |
| M01285245-S2-EW-SP | 2026-01-22 | Fire protection | 902 BROADWAY | Herewith filing Plumbing work and modifications to existing Sprinkler system in conjunction with office renovations. | $138,000 |
| M01285245-S2-EW-SP | 2026-01-22 | Plumbing | 902 BROADWAY | Herewith filing Plumbing work and modifications to existing Sprinkler system in conjunction with office renovations. | $138,000 |
| S01016888-S6-EW-SD | 2025-12-12 | Fire protection | 274 VICTORY BOULEVARD | IT IS PROPOSED TO INSTALL NEW SPRINKLER / STANDPIPE SYSTEM AS SHOW ON PLANS FOR PROPOSED NEW BUILDING. | $0 |
| S01016888-S6-EW-SP | 2025-12-12 | Fire protection | 274 VICTORY BOULEVARD | IT IS PROPOSED TO INSTALL NEW SPRINKLER / STANDPIPE SYSTEM AS SHOW ON PLANS FOR PROPOSED NEW BUILDING. | $0 |
| B00851732-S7-EW-SP | 2025-11-28 | Fire protection | 35 INSPIRATION LANE | SPRINKLER/STANDPIPE WORK AS PER PLANS FILED | $0 |
| B00851732-S7-EW-SD | 2025-11-26 | Fire protection | 35 INSPIRATION LANE | SPRINKLER/STANDPIPE WORK AS PER PLANS FILED | $0 |
| M01317413-S3-EW-SP | 2025-11-26 | Fire protection | 45 EAST 53 STREET | REMOVE 55 SPRINKLER HEADS & PIPING. INSTALL 11 NEW TEMPORARY SPRINKLER LOOP HEADS & PIPING. INSTALL 61 NEW PERMANENT SPRINKLER HEADS & PIPING. | $29,000 |
| M01284875-I1-EW-SP | 2025-11-14 | Fire protection | 149 FIFTH AVENUE | Propose plumbing and sprinkler work as per drawings filed herewith. No change in use, egress or occupancy. | $103,955 |
| M01284875-I1-EW-SP | 2025-11-14 | Plumbing | 149 FIFTH AVENUE | Propose plumbing and sprinkler work as per drawings filed herewith. No change in use, egress or occupancy. | $103,955 |
| M01292279-S3-EW-SP | 2025-11-06 | Fire protection | 225 LIBERTY STREET | NSTALLATION OF FIRST FLOOR SPRINKLER MAIN AND SPRINKLER HEADS TO SUPPORT TENANT PROGRAMMING LAYOUT. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $50,000 |
| M01261578-S3-EW-SP | 2025-11-03 | Fire protection | 225 LIBERTY STREET | Demo of existing sprinkler heads and associated branch piping in tenant space 127. Installation of temp SP loop. | $16,000 |
| M01245325-I1-EW-SP | 2025-10-27 | Fire protection | 224 12 AVENUE | Sprinkler modifications and associated work with bike and locker room demos and demise in cellar and floors 1-2 as per plans filed herewith. No changes in use, egress or occupancy. | $35,000 |
| M01285146-I1-EW-SP | 2025-10-01 | Fire protection | 28 LIBERTY STREET | Proposed: modification to the existing sprinkler system for Madman Espresso tenant space ( add 10 additional new sprinkler head). No change of use, egress or occupancy. | $5,000 |
| B01267466-I1-EW-SP | 2025-09-29 | Fire protection | 597 GRAND STREET | LIDL W - FILING HEREWITH FOR THE SPRINKLER WORK RELATED TO THE RENOVATION OF THE EXISTING SPACE. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY OR USE. | $50,001 |
| M01224201-I1-EW-SP | 2025-09-23 | Fire protection | 1185 AVENUE OF THE AMERICAS | Modifications and upgrade to the existing sprinkler system on the 21st floor (Lockton), as per plans. No change to use, egress, or occupancy. | $166,456 |
| B01258865-I1-EW-SP | 2025-08-15 | Fire protection | 16 DUPONT STREET | Sprinkler work for Interior Fit-out of commercial space. Filed in conjunction with application # B01233657. | $25,500 |
| M01218691-S3-EW-SP | 2025-07-24 | Fire protection | 107 GREENWICH STREET | SPRINKLER MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $73,500 |
| M01158654-Z7-EW-SP | 2025-07-21 | Fire protection | 945 MADISON AVENUE | Modification/additions to existing sprinkler system (restaurant). No change in use, egress or occupancy under this application. | $87,000 |
| B01114921-S4-EW-SD | 2025-07-15 | Fire protection | 164 WILLOUGHBY AVENUE | Sprinkler and Standpipe scope associated with the installation of a new fire protection system at Pratt ISC Building. | $481,016 |
| B01114921-S4-EW-SP | 2025-07-15 | Fire protection | 164 WILLOUGHBY AVENUE | Sprinkler and Standpipe scope associated with the installation of a new fire protection system at Pratt ISC Building. | $481,016 |
| M01232585-S5-EW-SP | 2025-06-24 | Fire protection | 595 MADISON AVENUE | 27TH FLOOR OFFICE LOCATION,HYDRAULIC SPRINKLER DESIGN FOR 986 SQ.FT.AREA. INSTALL NEW & RELOCATE SPRINKLER HEADS ,EXISTING 2''MAIN TO REMAIN.PROVIDE TEMPORARY COVERAGE DURING RENOV | $10,000 |
| M01184397-S3-EW-SP | 2025-06-16 | Fire protection | 390 PARK AVENUE | Modifications to the existing sprinkler system as per plans filed herewith. No change in egress, occupancy or use. | $58,000 |
| B01213290-I1-EW-SP | 2025-05-30 | Fire protection | 117 ADAMS STREET | Sprinkler modification to floors 3,5,7 as per plans filed herewith. No change in egress, use, or occupancy. | $61,900 |
| M01166971-S3-EW-SP | 2025-05-28 | Fire protection | 460 3 AVENUE | HEREWITH FILING SPRINKLER MODIFICATIONS IN CONJUNCTION WITH LIDL FITOUT ON THE SUBCELLAR, CELLAR AND 1ST FLR PER PLANS. | $39,934 |
| M00989388-S3-EW-SP | 2025-05-09 | Fire protection | 330 MADISON AVENUE | Installation of new sprinkler heads and related piping. No change in use, egress, or occupancy. | $35,000 |
| M01158654-S6-EW-SD | 2025-04-29 | Fire protection | 945 MADISON AVENUE | Modification/additions to existing sprinkler and standpipe system. Installation of Temporary Core Sprinkler Protection (TCSP) at cellar level only. | $412,262 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
