COMPANY RECORD · NEW YORK, NY
Monadnock Gen'l Cont Inc — permit history in New York, NY
Monadnock Gen'l Cont Inc appears on 80 New York permit records from 2023 through 2026, most often general construction (82.5% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 66 | 82.5% |
| Mechanical / HVAC | 14 | 17.5% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2023 | 5 |
| 2024 | 43 |
| 2025 | 16 |
| 2026 | 16 |
Busiest year on record: 2024, with 43 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Cegf & G Plumbing Corp | 38 | 2025-03-26 |
| M&G Plumbing And Heating | 22 | 2025-03-25 |
| Dual Fuel Company LLC | 20 | 2025-04-21 |
| Dual Fuel Plubing & Hting | 20 | 2025-04-21 |
| Bell Construction Svcs | 17 | 2026-07-27 |
| G.N.T. Mechanical LLC | 4 | 2025-12-01 |
| Ro-Sal Plumbing & Heating | 3 | 2026-02-02 |
| Addison Plbg And Htg Corp | 3 | 2024-11-14 |
| Rael Automatic Spr. Co.In | 3 | 2025-02-05 |
| Aspro Plumbing Inc | 2 | 2025-02-04 |
| D.D.S. Mech Pbg&Htg | 2 | 2026-07-28 |
| Nuline Mchncl Srvcs, LLC | 2 | 2024-10-09 |
20 companies are named alongside Monadnock Gen'l Cont Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 145 BROOME STREET | 2026-08-10 |
| 2533 ADAM CLAYTON POWELL JR BOULEVARD | 2026-08-04 |
| 2529 ADAM CLAYTON POWELL JR BOULEVARD | 2026-08-04 |
| 665 NEW YORK AVENUE | 2026-07-09 |
| 135 WEST 143 STREET | 2026-06-05 |
| 649 MALCOLM X BOULEVARD | 2026-06-02 |
| 2537 ADAM CLAYTON POWELL JR BOULEVARD | 2026-05-28 |
| 30 INSPIRATION LANE | 2026-05-18 |
| 97-10 SUTPHIN BOULEVARD | 2026-04-09 |
| 148 2 STREET | 2026-03-17 |
| 275 CHESTNUT STREET | 2026-02-03 |
| 809 EAST 140 STREET | 2026-01-22 |
| 240 HUNTINGTON STREET | 2025-12-17 |
| 33 WEST 138 STREET | 2025-11-05 |
58 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $16,705,000, median $1,219,872. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
80 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01420464-I1-GC | 2026-08-10 | General construction | 145 BROOME STREET | Field office in cellar and first floor during construction of new building applicationM01003420. No change in use, occupancy, or egress | $50,000 |
| M01153084-I1-GC | 2026-08-04 | General construction | 2533 ADAM CLAYTON POWELL JR BOULEVARD | ALT-CO FILED FOR MINOR INTERIOR ALTERATION OF THE NYCHA MULTIPLE DWELLING, CORRECT UNIT COUNT AND TO AMEND THE CERTIFICATE OF OCCUPANCY IN CONJUNCTION WITH ALT APPLICATION #M008829 | $2,000 |
| M01152957-I1-GC | 2026-08-04 | General construction | 2529 ADAM CLAYTON POWELL JR BOULEVARD | ALT-CO FILED FOR MINOR INTERIOR ALTERATION AND TO OBTAIN A FINAL CO IN CONJUNCTION WITH ALT APPLICATION #M00883033: INSTALL NEW CLOSET DOORS & HARDWARE IN 1ST FLOOR. NO CHANGE TO B | $19,600 |
| B00683860-I1-GC | 2026-07-09 | General construction | 665 NEW YORK AVENUE | Renovation of existing residential building and establishing new residential amenity spaces. | $16,705,000 |
| B00683860-S3-MS | 2026-07-09 | Mechanical / HVAC | 665 NEW YORK AVENUE | Mechanical work in conjunction with Alt-CO # B00683860. | $2,799,604 |
| M01146073-I1-GC | 2026-06-05 | General construction | 135 WEST 143 STREET | ALT-CO FILED TO AMEND CO TO CONVERT 17 DWELLING UNITS TO 16 DWELLING UNITS IN CONJUNCTION WITH ALT APPLICATION #M00883050. NO CHANGE TO BUILDING BULK,STRUCTURAL WORK OR PARTIAL DEM | $10,000 |
| M01153468-I1-GC | 2026-06-02 | General construction | 649 MALCOLM X BOULEVARD | ALT-CO FILED FOR MINOR INTERIOR ALTERATION OF THE NYCHA MULTIPLE DWELLING, REVISE CELLAR EGRESS AND TO AMEND THE CERTIFICATE OF OCCUPANCY IN CONJUNCTION WITH ALT APPLICATION M00883 | $2,000 |
| M01153174-I1-GC | 2026-05-28 | General construction | 2537 ADAM CLAYTON POWELL JR BOULEVARD | ALT-CO FILED FOR MINOR INTERIOR ALTERATION AND TO OBTAIN A FINAL CO IN CONJUNCTION WITH ALT APPLICATION #M00882986. NO CHANGE TO BUILDING BULK,STRUCTURAL WORK OR PARTIAL DEMOLITION | $2,000 |
| B01397566-I1-GC | 2026-05-18 | General construction | 30 INSPIRATION LANE | THIS APPLICATION IS FILED FOR TEMPORARY USE PERMIT FOR A SALES OFFICE INCLUDING MODEL APARTMENTS PURSUANT TO SECTION AC 28-111 AND BUILDING BULLETIN 2010-002. | $6,000 |
| Q01369503-I1-MS | 2026-04-09 | Mechanical / HVAC | 97-10 SUTPHIN BOULEVARD | Adjustment to CFM of kitchen exhaust. No change in use, occupancy or egress. In conjunction with NB Q00641359 | $10,500 |
| B00640761-S4-MS | 2026-03-17 | Mechanical / HVAC | 148 2 STREET | Mechanical work as per plans filed. | $1,000 |
| B00640761-I1-GC | 2026-02-25 | General construction | 148 2 STREET | CONTRUCT NEW 22 STORY BUILDING PER PLANS FILED HEREWITH. | $1,000 |
| B00972461-Z5-MS | 2026-02-03 | Mechanical / HVAC | 275 CHESTNUT STREET | INSTALLATION OF MECHANICAL VENTILATION AND RISER FOR AN ACTIVE SUB-SLAB DEPRESSURIZATION SYSTEM. NO CHANGE IN USE EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #B00972461-I1 | $0 |
| X01296686-I1-GC-CX | 2026-01-22 | General construction | 809 EAST 140 STREET | THE PLANS ENCLOSED DEPICT THE PROPOSED STRUCTURAL REPAIR & REINFORCEMENT AT THE 1-STORY BUILDING LOCATED AT 809 EAST 140 STREET, BRONX, NY 10454 | $35,000 |
| M01003420-S4-MS | 2026-01-07 | Mechanical / HVAC | 145 BROOME STREET | INSTALL MECHANICAL EQUIPMENT AND FIXTURES AS PER PLANS FILED IN CONJUNCTION WITH NB M01003420-I1. | $0 |
| B00972461-I1-GC | 2026-01-07 | General construction | 275 CHESTNUT STREET | CONSTRUCT NEW FOURTEEN (14) STORY MIXED-USE BUILDING AS PER PLANS FILED. | $0 |
| B01310354-S3-MS | 2025-12-17 | Mechanical / HVAC | 240 HUNTINGTON STREET | Mechanical application interior Tenant Fit out work on the 5th Floor as per plans filed in conjunction with #NB 321588885 | $1,000 |
| B01191265-S3-MS | 2025-12-09 | Mechanical / HVAC | 240 HUNTINGTON STREET | Mechanical Tenant Fit out work as per plans filed in conjunction with 321588885 | $1,000 |
| B01310354-I1-GC | 2025-12-05 | General construction | 240 HUNTINGTON STREET | General Construction Tenant Fit out work o the 5th Floor as per plans filed in conjunction with #NB 321588885 | $750,000 |
| M01003420-I1-GC | 2025-11-25 | General construction | 145 BROOME STREET | CONSTRUCT NEW SIXTEEN (16) STORY MIXED-USE BUILDING. | $0 |
| M00517312-I1-GC | 2025-11-05 | General construction | 33 WEST 138 STREET | HEREWITH FILING DEMO & CONSTRUCTION WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $1,296,892 |
| M00948794-I1-GC | 2025-10-29 | General construction | 203 WEST 131 STREET | ALT-CO FILED TO INCREASE THE TOTAL NUMBER OF DWELLING UNITS FROM NINE TO TEN UNITS. PROPOSED INTERIOR RENOVATION AS PER PLANS FILED. NEW C OF O TO BE OBTAINED. | $715,125 |
| B01191265-I1-GC | 2025-07-30 | General construction | 240 HUNTINGTON STREET | General Construction Tenant Fit out work work as per plans filed in conjunction with #NB 321588885 | $1,000,000 |
| B00640786-Z2-MS | 2025-03-19 | Mechanical / HVAC | 254 EUCLID AVENUE | INSTALLATION OF MECHANICAL VENTILATION AND RISER FOR AN ACTIVE SUB-SLAB DEPRESSURIZATION SYSTEM. NO CHANGE IN USE EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #B00640786-I1. | $0 |
| M00882755-I1-GC | 2025-03-07 | General construction | 2441 ADAM CLAYTON POWELL JR BOULEVARD | INTERIOR RENOVATION OF 7-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INTERIOR RENOVATION OF KITCHEN AND BATHROOM THROUGHOUT, REPLACE OF CASEWORK, COUNTERS A | $6,046,216 |
| M00883113-I1-GC | 2025-03-07 | General construction | 158 WEST 144 STREET | INTERIOR RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DOO | $1,865,192 |
| M00882710-I1-GC | 2025-03-07 | General construction | 163 WEST 143 STREET | INTERIOR RENOVATION OF 5-STORY NYCHA BUILDING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DOORS AND W | $1,492,483 |
| Q01066737-I1-GC | 2025-02-04 | General construction | 97-10 SUTPHIN BOULEVARD | Interior fit out for a health care facility. No change in use or occupancy. | $3,519,000 |
| Q01066737-S1-MS | 2025-02-04 | Mechanical / HVAC | 97-10 SUTPHIN BOULEVARD | Mechanical fit out for a health care facility. including installation of HVAC system/units and related piping. No change in use, egress or occupancy. | $1,378,500 |
| M00725682-I1-GC | 2025-01-27 | General construction | 220 LENOX AVENUE | ALT-CO filed herewith to renovation of existing multifamily residential building, 4 stories over basement plus cellar to obtain the new certificate of occupancy. | $2,201,621 |
| M00883057-I1-GC | 2025-01-10 | General construction | 131 WEST 143 STREET | INTERIOR RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INTERIOR RENOVATION OF KITCHEN AND BATHROOM THROUGHOUT, REPLACE OF CASEWORK, COUNTERS A | $2,006,241 |
| M00883180-I1-GC | 2025-01-09 | General construction | 2407 ADAM CLAYTON POWELL JR BOULEVARD | INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DOO | $1,235,652 |
| M00883091-I1-GC | 2024-12-27 | General construction | 129 WEST 144 STREET | INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INTERIOR RENOVATION OF KITCHEN AND BATHROOM THROUGHOUT, REPLACE OF CASEWORK, COUNTERS A | $2,110,212 |
| M00883096-I1-GC | 2024-12-27 | General construction | 133 WEST 144 STREET | INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INTERIOR RENOVATION OF KITCHEN AND BATHROOM THROUGHOUT, REPLACE OF CASEWORK, COUNTERS A | $2,110,212 |
| M00883121-I1-GC | 2024-12-24 | General construction | 162 WEST 144 STREET | INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DOO | $1,498,291 |
| M00883069-I1-GC | 2024-11-26 | General construction | 113 WEST 144 STREET | INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DOO | $2,110,212 |
| B01080936-I1-GC | 2024-11-22 | General construction | 16 DUPONT STREET | THIS APPLICATION IS FILED FOR A TEMPORARY USE PERMIT FOR A SALES OFFICE IN PURSUANT 28-111 AND BUILDING BULLETIN 2010-002 FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION #B00604 | $1,000 |
| M00883050-I1-GC | 2024-10-11 | General construction | 135 WEST 143 STREET | INTERIOR RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INTERIOR RENOVATION OF KITCHEN AND BATHROOM THROUGHOUT, REPLACE OF CASEWORK, COUNTERS A | $2,006,241 |
| M00883080-I1-GC | 2024-10-11 | General construction | 117 WEST 144 STREET | INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INTERIOR RENOVATION OF KITCHEN AND BATHROOM THROUGHOUT, REPLACE OF CASEWORK, COUNTERS A | $2,110,212 |
| M00883105-I1-GC | 2024-10-02 | General construction | 148 WEST 144 STREET | INTERIOR RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INTERIOR RENOVATION OF KITCHEN AND BATHROOM THROUGHOUT, REPLACE OF CASEWORK, COUNTERS A | $1,865,192 |
| M00883128-I1-GC | 2024-10-02 | General construction | 151 WEST 143 STREET | INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DOO | $1,492,483 |
| M00883173-I1-GC | 2024-10-02 | General construction | 2409 ADAM CLAYTON POWELL JR BOULEVARD | INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DOO | $1,235,652 |
| M00883163-I1-GC | 2024-10-02 | General construction | 144 WEST 141 STREET | INTERIOR RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DOO | $2,070,231 |
| M00883188-I1-GC | 2024-10-02 | General construction | 116 WEST 139 STREET | INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DOO | $1,204,093 |
| M00883199-I1-GC | 2024-10-02 | General construction | 112 WEST 139 STREET | INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DOO | $1,204,093 |
| M00883137-I1-GC | 2024-10-02 | General construction | 159 WEST 143 STREET | INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DOO | $1,492,483 |
| M00882642-I1-GC | 2024-10-02 | General construction | 143 WEST 142 STREET | INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DO | $1,204,093 |
| M00882425-I1-GC | 2024-10-02 | General construction | 2465 ADAM CLAYTON POWELL JR BOULEVARD | INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DO | $1,601,682 |
| M00883145-I1-GC | 2024-10-02 | General construction | 145 WEST 143 STREET | INTERIOR RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DOO | $1,726,176 |
| M00883157-I1-GC | 2024-10-02 | General construction | 143 WEST 143 STREET | INTERIOR RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DOO | $1,726,176 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
