COMPANY RECORD · NEW YORK, NY
Premier Construction Inc — permit history in New York, NY
Premier Construction Inc appears on 66 New York permit records from 2021 through 2026, most often general construction (98.5% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 65 | 98.5% |
| Mechanical / HVAC | 1 | 1.5% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 3 |
| 2022 | 1 |
| 2023 | 1 |
| 2024 | 12 |
| 2025 | 27 |
| 2026 | 22 |
Busiest year on record: 2025, with 27 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Cegf & G Plumbing Corp | 36 | 2025-03-26 |
| Dual Fuel Plubing & Hting | 23 | 2026-05-07 |
| M&G Plumbing And Heating | 22 | 2025-03-25 |
| Dual Fuel Company LLC | 18 | 2025-04-21 |
| Bell Construction Svcs | 17 | 2026-07-27 |
| Leema Plbng & Heating Inc | 9 | 2026-02-12 |
| Pyramid Etc Companies, Ll | 9 | 2026-02-11 |
| Addison Plbg And Htg Corp | 3 | 2024-11-14 |
| J-J Plumbing Corp | 1 | 2022-01-19 |
9 companies are named alongside Premier Construction Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 159-48 HARLEM RIVER DRIVE | 2026-08-24 |
| 159-70 HARLEM RIVER DRIVE | 2026-08-24 |
| 159-26 HARLEM RIVER DRIVE | 2026-08-24 |
| 159-14 HARLEM RIVER DRIVE | 2026-08-24 |
| 835 WASHINGTON STREET | 2026-07-28 |
| 370 EAST 153 STREET | 2026-07-22 |
| 372 EAST 152 STREET | 2026-07-22 |
| 2533 ADAM CLAYTON POWELL JR BOULEVARD | 2026-06-18 |
| 701 WILLOUGHBY AVENUE | 2026-05-08 |
| 675 WILLOUGHBY AVENUE | 2026-04-10 |
| 671 WILLOUGHBY AVENUE | 2026-04-08 |
| 150 MALCOLM X BOULEVARD | 2026-04-03 |
| 865 GATES AVENUE | 2026-03-31 |
| 690 QUINCY STREET | 2026-03-31 |
62 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $4,000 to $10,800,000, median $1,581,460. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
66 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01272033-S2-GC | 2026-08-24 | General construction | 159-48 HARLEM RIVER DRIVE | REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STONE & TERRACOTTA ORNAMENTATION, COPING STO | $4,596,840 |
| M01272522-S2-GC | 2026-08-24 | General construction | 159-70 HARLEM RIVER DRIVE | REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STONE & TERRACOTTA ORNAMENTATION, COPING STO | $4,622,830 |
| M01271974-S2-GC | 2026-08-24 | General construction | 159-26 HARLEM RIVER DRIVE | REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STONE & TERRACOTTA ORNAMENTATION, COPING STO | $4,813,800 |
| M01270894-S2-GC | 2026-08-24 | General construction | 159-14 HARLEM RIVER DRIVE | REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STONE & TERRACOTTA ORNAMENTATION, COPING STO | $4,573,110 |
| M01278581-I1-GC | 2026-07-28 | General construction | 835 WASHINGTON STREET | REPLACEMENT OF EXISTING ROOFING FINISH. DEMOLITION OF EXISTING ROOFTOP HVAC AND DUNNAGE AS PER PLANS. NO PROPOSED CHANGE TO USE, EGRESS OR OCCUPANCY. | $123,600 |
| X01385228-I1-GC | 2026-07-22 | General construction | 370 EAST 153 STREET | CMU BLOCK PINNING. MASONRY MORTAR REPAIR. CONCRETE CRACK REPAIR.REPLACEMENT OF WINDOWS AND DOORS. NEW LED EXTERIOR LIGHTING. ROOF AND FASCIA REPAIR ATAREAS OF CRACKING. | $3,385,000 |
| X01385173-I1-GC | 2026-07-22 | General construction | 372 EAST 152 STREET | CMU BLOCK PINNING. MASONRY MORTAR REPAIR. CONCRETE SLAB CRACK REPAIR. REPLACEMENT OF WINDOWS AND DOORS. NEW LED EXTERIOR LIGHTING. ROOF AND FASCIA REPAIR AT AREAS OF CRACKING. PRO | $3,385,000 |
| M00882971-S1-GC | 2026-06-18 | General construction | 2533 ADAM CLAYTON POWELL JR BOULEVARD | LIMITED TO REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION IN CONJUNCTION WITH REQUIRED LOCAL LAW INSPECTION (FI | $1,648,479 |
| B01194047-S5-GC | 2026-05-08 | General construction | 701 WILLOUGHBY AVENUE | Exterior Facade Repair | $1,100,000 |
| B01194186-S5-GC | 2026-04-10 | General construction | 675 WILLOUGHBY AVENUE | Exterior Facade Repair | $960,000 |
| B01194144-S6-GC | 2026-04-08 | General construction | 671 WILLOUGHBY AVENUE | Exterior Facade Repair | $960,000 |
| B01193940-S6-GC | 2026-04-03 | General construction | 150 MALCOLM X BOULEVARD | Exterior Facade Repair | $3,817,000 |
| B01194865-S6-GC | 2026-03-31 | General construction | 865 GATES AVENUE | Exterior Facade Repair | $5,400,000 |
| B01194839-S5-GC | 2026-03-31 | General construction | 690 QUINCY STREET | Exterior Facade Repair | $2,700,000 |
| B01194774-S6-GC | 2026-03-31 | General construction | 835 GATES AVENUE | Exterior Facade Repair | $7,100,000 |
| B01194650-S5-GC | 2026-03-31 | General construction | 770 GATES AVENUE | Exterior Facade Repair | $3,000,000 |
| B01194554-S6-GC | 2026-03-27 | General construction | 245 LEWIS AVENUE | Exterior Facade Repair | $10,800,000 |
| M00883163-S1-GC | 2026-03-06 | General construction | 144 WEST 141 STREET | LIMITED TO REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION IN CONJUNCTION WITH REQUIRED LOCAL LAW INSPECTION (FI | $1,811,922 |
| M00883188-S2-GC | 2026-03-06 | General construction | 116 WEST 139 STREET | LIMITED EXTERIOR REPAIR & ROOF REPLACEMENT IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,053,854 |
| M00883199-S2-GC | 2026-03-06 | General construction | 112 WEST 139 STREET | LIMITED EXTERIOR REPAIR & ROOF REPLACEMENT IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,053,854 |
| M01232391-I1-GC-CX | 2026-02-18 | General construction | 415 BLEECKER STREET | STRUCTURAL REPAIRS SCOPE OF WORK FOR EXISTING FACADE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $70,000 |
| M01248431-I1-GC-CX | 2026-01-28 | General construction | 415 BLEECKER STREET | STRUCTURAL REPAIRS SCOPE OF WORK FOR EXISTING ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $31,523 |
| M00882430-S2-GC | 2025-11-06 | General construction | 141 WEST 142 STREET | LIMITED EXTERIOR REPAIR & ROOF REPLACEMENT IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,053,854 |
| M00882687-S2-GC | 2025-09-15 | General construction | 145 WEST 142 STREET | LIMITED EXTERIOR REPAIR & ROOF REPLACEMENT IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,053,854 |
| M00882733-S2-GC | 2025-09-15 | General construction | 129 WEST 142 STREET | LIMITED EXTERIOR REPAIR & ROOF REPLACEMENT IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,605,099 |
| M00882755-S2-GC | 2025-09-15 | General construction | 2441 ADAM CLAYTON POWELL JR BOULEVARD | LIMITED TO REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS OF 7-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION IN CONJUNCTION WITH REQUIRED LOCAL LAW INSPECTION (FI | $5,291,810 |
| M00882436-S1-GC | 2025-09-11 | General construction | 2449 ADAM CLAYTON POWELL JR BOULEVARD | LIMITED TO REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION IN CONJUNCTION WITH REQUIRED LOCAL LAW INSPECTION (FI | $2,061,955 |
| M00882642-S2-GC | 2025-09-11 | General construction | 143 WEST 142 STREET | LIMITED EXTERIOR REPAIR & ROOF REPLACEMENT IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,053,854 |
| M00883050-S1-GC | 2025-09-08 | General construction | 135 WEST 143 STREET | LIMITED TO REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION IN CONJUNCTION WITH REQUIRED LOCAL LAW INSPECTION (FI | $1,755,916 |
| M00883057-S1-GC | 2025-09-08 | General construction | 131 WEST 143 STREET | LIMITED TO REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION IN CONJUNCTION WITH REQUIRED LOCAL LAW INSPECTION (FI | $1,755,916 |
| M00882803-S1-GC | 2025-08-06 | General construction | 149 WEST 142 STREET | LIMITED EXTERIOR REPAIR & ROOF REPLACEMENT IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,053,854 |
| M00882986-S1-GC | 2025-07-10 | General construction | 2537 ADAM CLAYTON POWELL JR BOULEVARD | LIMITED TO REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION IN CONJUNCTION WITH REQUIRED LOCAL LAW INSPECTION (FI | $1,853,439 |
| M00883157-S1-GC | 2025-07-02 | General construction | 143 WEST 143 STREET | LIMITED TO REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION IN CONJUNCTION WITH REQUIRED LOCAL LAW INSPECTION (FI | $1,510,796 |
| M00883145-S1-GC | 2025-07-02 | General construction | 145 WEST 143 STREET | LIMITED TO REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION IN CONJUNCTION WITH REQUIRED LOCAL LAW INSPECTION (FI | $1,510,796 |
| M00882395-S1-GC | 2025-06-26 | General construction | 2473 ADAM CLAYTON POWELL JR BOULEVARD | LIMITED EXTERIOR REPAIR & ROOF REPLACEMENT IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,401,835 |
| M00882425-S1-GC | 2025-06-26 | General construction | 2465 ADAM CLAYTON POWELL JR BOULEVARD | LIMITED EXTERIOR REPAIR & ROOF REPLACEMENT IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,401,835 |
| M00882746-S2-GC | 2025-06-20 | General construction | 2453 ADAM CLAYTON POWELL JR BOULEVARD | LIMITED TO REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION IN CONJUNCTION WITH REQUIRED LOCAL LAW INSPECTION (FI | $2,197,352 |
| M00882379-S2-GC | 2025-06-20 | General construction | 2477 ADAM CLAYTON POWELL JR BOULEVARD | LIMITED EXTERIOR REPAIR & ROOF REPLACEMENT IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,826,664 |
| M00883033-S1-GC | 2025-06-20 | General construction | 2529 ADAM CLAYTON POWELL JR BOULEVARD | LIMITED TO REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION IN CONJUNCTION WITH REQUIRED LOCAL LAW INSPECTION (FI | $1,648,479 |
| M00883173-S2-GC | 2025-06-20 | General construction | 2409 ADAM CLAYTON POWELL JR BOULEVARD | LIMITED EXTERIOR REPAIR & ROOF REPLACEMENT IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,081,476 |
| M00882819-S1-GC | 2025-06-18 | General construction | 645 MALCOLM X BOULEVARD | LIMITED TO REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION IN CONJUNCTION WITH REQUIRED LOCAL LAW INSPECTION (FI | $1,557,820 |
| M00883180-S2-GC | 2025-06-18 | General construction | 2407 ADAM CLAYTON POWELL JR BOULEVARD | LIMITED EXTERIOR REPAIR & ROOF REPLACEMENT IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,081,476 |
| M00883045-S1-GC | 2025-06-18 | General construction | 2525 ADAM CLAYTON POWELL JR BOULEVARD | LIMITED TO REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION IN CONJUNCTION WITH REQUIRED LOCAL LAW INSPECTION (FI | $1,648,479 |
| M00882415-S1-GC | 2025-06-18 | General construction | 2469 ADAM CLAYTON POWELL JR BOULEVARD | LIMITED EXTERIOR REPAIR & ROOF REPLACEMENT IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,401,835 |
| M00882775-S1-GC | 2025-06-18 | General construction | 649 MALCOLM X BOULEVARD | LIMITED TO REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION IN CONJUNCTION WITH REQUIRED LOCAL LAW INSPECTION (FI | $1,557,820 |
| M00882813-S1-GC | 2025-06-17 | General construction | 2461 ADAM CLAYTON POWELL JR BOULEVARD | LIMITED EXTERIOR REPAIR & ROOF REPLACEMENT IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,784,385 |
| M00882710-S1-GC | 2025-04-30 | General construction | 163 WEST 143 STREET | LIMITED EXTERIOR REPAIR & ROOF REPLACEMENT IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,306,261 |
| M00883121-S1-GC | 2025-04-17 | General construction | 162 WEST 144 STREET | LIMITED EXTERIOR REPAIR & ROOF REPLACEMENT IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,311,345 |
| M00883113-S1-GC | 2025-04-17 | General construction | 158 WEST 144 STREET | LIMITED TO REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION IN CONJUNCTION WITH REQUIRED LOCAL LAW INSPECTION (FI | $1,632,466 |
| M00883091-S2-GC | 2024-12-30 | General construction | 129 WEST 144 STREET | LIMITED TO REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION IN CONJUNCTION WITH REQUIRED LOCAL LAW INSPECTION (FI | $1,846,914 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
