COMPANY RECORD · SEATTLE, WA
Interface Technologies Northwest — permit history in Seattle, WA
Interface Technologies Northwest appears on 31 Seattle permit records from 2024 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 31 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2024 | 11 |
| 2025 | 12 |
| 2026 | 8 |
Busiest year on record: 2025, with 12 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 760 ALOHA ST | 2026-07-31 |
| 400 N 34TH ST | 2026-07-16 |
| 221 YALE AVE N | 2026-06-05 |
| 1301 2ND AVE | 2026-05-19 |
| 16 W HARRISON ST | 2026-01-23 |
| 2401 ELLIOTT AVE | 2025-10-10 |
| 1200 UNIVERSITY ST | 2025-09-09 |
| 7500 SEWARD PARK AVE S | 2025-08-26 |
| 159 S JACKSON ST | 2025-07-25 |
| 449 N 35TH ST | 2025-05-21 |
| 2300 26TH AVE S | 2025-05-19 |
| 200 W THOMAS ST | 2025-03-13 |
| 809 OLIVE WAY | 2025-02-25 |
| 1700 7TH AVE | 2024-11-11 |
20 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $2,500 to $40,000, median $8,500. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
31 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7156069-EL | 2026-07-31 | Electrical | 760 ALOHA ST | Installing 40 Category 6 plenum cables | |
| 7153450-EL | 2026-07-16 | Electrical | 400 N 34TH ST | Installation of (80) Category 6 Plenum Cables | |
| 7149105-EL | 2026-06-19 | Electrical | 400 N 34TH ST | Installation of (100) new Category 6 Plenum cables. | |
| 7146571-EL | 2026-06-05 | Electrical | 221 YALE AVE N | Installation of (18) Category 6 Plenum Cables for new amenities renovation | |
| 7143937-EL | 2026-05-19 | Electrical | 1301 2ND AVE | I am installing (24) new Category 6 Plenum Cables for new workstation, WIFI, speaker and Camera Locations. Devices installed by tenant | |
| 7129147-EL | 2026-02-12 | Electrical | 400 N 34TH ST | ITN proposes to install (60) Category 6 Plenum cables for new workstation and WIFI locations. -- ITN will connect the new IDF to the existing MDF using (1) 6-strand multimode fiber | |
| 7129152-EL | 2026-02-12 | Electrical | 400 N 34TH ST | Suite# 205 ITN proposes to install (60) Category 6 Plenum cables for new workstation and WIFI locations. ITN will connect the new IDF to the existing MDF using (1) 6-strand multimo | |
| 7126243-EL | 2026-01-23 | Electrical | 16 W HARRISON ST | -- ITN proposes to use both existing and new cabling to make sure every workstation has (1) ethernet connection. This proposal includes (14) new Category 6 cables for camera locati | |
| 7111064-EL | 2025-10-10 | Electrical | 2401 ELLIOTT AVE | 4th Floor Workstation Cabling Scope of Work: -- ITN proposes to install (71) new Category 6 Plenum cables for new Room Scheduler and workstation outlets where existing cabling does | $12,000 |
| 7110487-EL | 2025-10-07 | Electrical | 2401 ELLIOTT AVE | - ITN proposes to install (110) CommScope Category 6 plenum rated (CMP) cables including (8) for wireless access points. All cabling will be 100% complete and operational as part o | $16,000 |
| 7105685-EL | 2025-09-09 | Electrical | 1200 UNIVERSITY ST | ITN will install 5000 ft of CAT 5e plenum cable for cameras. They will terminate at one 24 port patch panel. . | $5,000 |
| 7103543-EL | 2025-08-26 | Electrical | 7500 SEWARD PARK AVE S | Installing 8500ft of CAT5e cable for cameras. Cable will terminate at 2 24 port patch panels. | $3,500 |
| 7098420-EL | 2025-07-25 | Electrical | 159 S JACKSON ST | -- ITN proposes to install (44) new Category 6 CMP cables for new phase 2 workstation locations, including (3) for wireless access points in the ceiling. All cabling will terminate | $3,000 |
| 7094511-EL | 2025-07-03 | Electrical | 159 S JACKSON ST | - ITN proposes to install (44) new Category 6 CMP cables for new phase 2 workstation locations, including (3) for wireless access points in the ceiling. All cabling will terminate | $7,500 |
| 7087171-EL | 2025-05-21 | Electrical | 449 N 35TH ST | ITN proposes to install (51) CommScope Category 6 CMP cables, including (3) for wireless access points. Cabling will route back to existing rack in LAN room. | $4,500 |
| 7086975-EL | 2025-05-20 | Electrical | 400 N 34TH ST | - ITN proposes to install (51) CommScope Category 6 CMP cables, including (3) for wireless access points. Cabling will route back to existing rack in LAN room. | $4,500 |
| 7086622-EL | 2025-05-19 | Electrical | 2300 26TH AVE S | -- ITN proposes to install (95) CommScope Category 6 plenum rated (CMP) cables for wireless access points, TV's, cameras and workstations. All cabling will be 100% complete and ope | $6,500 |
| 7085473-EL | 2025-05-13 | Electrical | 2300 26TH AVE S | -- ITN proposes to install (95) CommScope Category 6 plenum rated (CMP) cables for wireless access points, TV's, cameras and workstations. All cabling will be 100% complete and ope | $15,000 |
| 7075207-EL | 2025-03-13 | Electrical | 200 W THOMAS ST | ITN proposes to install (42) Category 6A plenum rated (CMP) cables, including (2) for wireless access points in ceiling and (2) for a demarc extension. | $5,500 |
| 7072197-EL | 2025-02-25 | Electrical | 809 OLIVE WAY | Tenant improvements to existing assembly area (clubhouse) on level1 in existing mixed use building. | $2,500 |
| 7059956-EL | 2024-12-09 | Electrical | 200 W THOMAS ST | -- ITN proposes to install (45) Commscope Category 6 plenum rated (CMP) cables to new workstation and camera locations. ITN will install (60) Commscope Category 6 cables from the s | $27,000 |
| 7060074-EL | 2024-12-09 | Electrical | 809 OLIVE WAY | - ITN proposes to install (20) Category 6 CMP cable for the new Olivian renovation. Cables will terminate in existing IDF. | $15,000 |
| 7055691-EL | 2024-11-11 | Electrical | 1700 7TH AVE | Install access control on 3 doors in Suite 1610 | $3,000 |
| 7048611-EL | 2024-09-30 | Electrical | 605 5TH AVE S | ITN proposes to install (113) Commscope Category 6 plenum rated (CMP) cables for workstations and cameras. ITN will install (25) Commscope Category 6A cables for the IT Office and | $40,000 |
| 7041095-EL | 2024-08-15 | Electrical | 1000 2ND AVE | -- ITN proposes to install (16) Commscope Category 6 plenum rated (CMP) cables. ITN will install (1) wall mount rack. | $3,800 |
| 7038221-EL | 2024-07-30 | Electrical | 1000 2ND AVE | - ITN proposes to install (160) Commscope Category 6 plenum rated (CMP) cables, including (4) for wireless access points in ceiling. All cabling will be 100% complete and operatio | $37,500 |
| 7026779-EL | 2024-05-23 | Electrical | 1101 MADISON ST | -- ITN proposes to install (16) Commscope Category 6 plenum rated (CMP) cables, including (2) for wireless access points in the expansion ceiling, (2) MDF to IDF interconnects and | $9,500 |
| 7015610-EL | 2024-03-21 | Electrical | 320 N 85TH ST | ITN proposes to install (46) Commscope Category 6 plenum rated (CMP) cables, including (4) for wireless access points and (5) for cameras. All cabling will be 100% complete and op | $10,500 |
| 7015410-EL | 2024-03-20 | Electrical | 423 3RD AVE W | - ITN proposes to install (130) Commscope Category 6 plenum rated (CMP) cables, including (4) for wireless access points and (10) for cameras. All cabling will be 100% complete an | $22,750 |
| 7013942-EL | 2024-03-12 | Electrical | 2107 WESTLAKE AVE | ITN proposes to install (30) Commscope Category 6 plenum rated (CMP) cables to (30) locations, including (9) for wireless access points in ceiling. | $8,500 |
| 7013224-EL | 2024-03-07 | Electrical | 159 S JACKSON ST | 80 Category 6 CMP cables. | $18,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
