COMPANY RECORD · SEATTLE, WA

Pride Electric, Inc — permit history in Seattle, WA

Pride Electric, Inc appears on 1,377 Seattle permit records from 2018 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical1377100%

Activity by year

YearPermits issued
2018178
2019253
2020144
2021219
2022186
2023178
2024155
202562
20262

Busiest year on record: 2019, with 253 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
3901 9TH AVE S2026-04-17
600 STEWART ST2026-03-09
955 ALASKAN WAY W2025-09-02
601 UNION ST2025-08-13
511 BOREN AVE N2025-08-12
701 5TH AVE2025-08-11
901 5TH AVE2025-08-04
401 UNION ST2025-07-22
1000 OLIVE WAY2025-07-02
1700 7TH AVE2025-06-30
6500 1ST AVE S2025-06-24
3101 WESTERN AVE2025-06-10
1301 5TH AVE2025-06-10
705 5TH AVE S2025-06-10

541 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $1,014,813, median $3,700. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

1,377 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
7138688-EL2026-04-17Electrical3901 9TH AVE Sreplace 1600A breaker that has failed, with like in kind. [4/17/26 BGO - Approved Plan Set for Service Disconnect circuit breaker replacement]$18,000
7129653-EL2026-03-09Electrical600 STEWART STJ00288003 - Full floor TI with all new notification. 26 Speaker strobes, 11 speakers, new power supply in electrical closet.$19,000
7101344-EL2025-09-02Electrical955 ALASKAN WAY WInstallation of CHEM SUPRESSION system per drawings. JOB#436219$250,000
7101348-EL2025-08-13Electrical601 UNION STTenant improvement using existing circuits. JOB#433991$30,000
7101269-EL2025-08-12Electrical511 BOREN AVE Nrun power for the replacement of 3 RTU's$18,000
7100908-EL2025-08-11Electrical701 5TH AVEInstalling two L6-30 outlets in the server room using existing panel board. JOB#438368$2,300
7099837-EL2025-08-04Electrical901 5TH AVETenant improvement using existing circuits. JOB # 437777$6,350
7097471-EL2025-07-22Electrical401 UNION STTenant improvement using existing circuits. JOB#438939$1,400
7094840-EL2025-07-07Electrical901 5TH AVETenant improvement using existing panel board and circuits. JOB#437777$8,250
7094415-EL2025-07-02Electrical1000 OLIVE WAYWe are installing (2) speaker/strobes for a 1st floor TI.$8,688
7085164-EL2025-06-30Electrical1700 7TH AVETI, FA, adding (13) devices, including new power supply, existing system.$10,312
7093533-EL2025-06-27Electrical1000 OLIVE WAYTenant improvement using existing panel boards and circuits. JOB#433983$16,000
7092070-EL2025-06-26Electrical601 UNION STTenant improvement using existing panel boards and circuits. [6.26.25 VR, CN permit 7084324-BK]$55,000
7092837-EL2025-06-24Electrical955 ALASKAN WAY WInstall feeder to mobile trailer.$3,673
7092894-EL2025-06-24Electrical6500 1ST AVE SReplace service entrance conductors due to a fire over the top of the Seattle city light transformer damaging conductors serving 2 different meters on the same property.$42,680
7090270-EL2025-06-10Electrical3101 WESTERN AVEPermit correction for permit 7087071-EL, it has been pulled. Load bank test one 200kW, 480V, 300A generator$864
7088369-EL2025-06-10Electrical1301 5TH AVETenant improvement using existing load centers. JOB#433973$228,265
7090333-EL2025-06-10Electrical705 5TH AVE STenant Improvement using existing load centers and circuits. Furniture panel to panel connections x 24. Job# 438332$55,000
7090323-EL2025-06-10Electrical159 S JACKSON STTenant improvement of rest rooms using existing load centers and circuits, Install 2 fixtures and 2 receptacles. Job#433893$9,397
7090303-EL2025-06-10Electrical159 S JACKSON STTenant improvement using existing load centers, relocate 28 linear fixtures, install 9 new fixtures, replace 3 pendants, install 23 receptacles, 5 furniture feeds.$71,259
7090363-EL2025-06-10Electrical2211 ELLIOTT AVEReplace 100 sub-panel for breaker space, install 7 L14-30 outlets. Job# 438508$11,000
7087415-EL2025-05-30Electrical600 UNIVERSITY STTenant improvement using existing load centers and circuits. 18th floor. Job #433974 5/22/25 BGO - Get Started Permit] [5/27/25 KEF - Plan set approved. See permit 7087420-EL for 1$164,220
7088226-EL2025-05-29Electrical1325 4TH AVETenant improvement using existing load centers and circuits. Job#433972$26,640
7088128-EL2025-05-28Electrical2001 6TH AVELoad bank test 2 generators. one 600kW, 480V, 900A and one 1250kW, 480V, 1,875A generator$1,287
7087459-EL2025-05-22Electrical4009 STONE WAY NReplace an existing garage door with new, power already brought to the door by the construction electricians$864
7087071-EL2025-05-21Electrical3301 WesternAVELoad bank one 200kW, 480V, 300A generator$786
7085470-EL2025-05-13Electrical1325 4TH AVEADD 2 AV DEVICES TO SUITE 103 [7/21/2025 PGF Changed fire alarm device count from 2 to 1 per contractor request (Katie).]$2,500
7085659-EL2025-05-13Electrical221 18TH AVE Sprovide 120v power for 2 exterior gates$12,000
7084157-EL2025-05-13Electrical1700 7TH AVETenant Improvement using existing load centers and circuits. JOB # 438331$99,855
7083998-EL2025-05-05Electrical1700 WESTLAKE AVE NTenant improvement using existing load centers and circuits. JOB # 436589$51,250
7083488-EL2025-05-01Electrical333 ELLIOTT AVE WLoad bank test one 90kW, 480V, 150A generator$864
7083247-EL2025-04-30Electrical2034 NW 56TH STInstall 2- 100 amp Circuits for new hot water tanks JOB # 437419$9,500
7082846-EL2025-04-28Electrical1101 4TH AVETenant improvement / lighting up grade using existing load centers and circuits. Job # 436572$19,000
7082853-EL2025-04-28Electrical1700 WESTLAKE AVE NTenant improvement using existing load centers and circuits. Job # 436588$21,330
7082287-EL2025-04-23Electrical701 5TH AVEWe are adding one (1) access control relay to the 47th floor of the Columbia Center building.$6,592
7080812-EL2025-04-22Electrical401 5TH AVETenant Improvement, adding 50amp ups with bypass and load center. [4/21/25 BGO - Approved UPS/Bypass and Panelboard Plan]$7,750
7080786-EL2025-04-15Electrical1099 STEWART STTenant Improvement using existing load center and circuits. Job#437756$5,275
7078902-EL2025-04-11Electrical701 5TH AVETenant improvement using existing load centers and circuits. JOB#436580$115,950
7072168-EL2025-04-09Electrical1215 4TH AVEINSTALL NEW AV DEVICES IN SUITE 1900$7,800
7079124-EL2025-04-04Electrical1420 5TH AVETenant improvement using existing load centers and circuits. JOB#433955$17,900
7079132-EL2025-04-04Electrical4245 ROOSEVELT WAY NETennant Improvement using existing load centers and circuits. JOB#435003$3,337
7076898-EL2025-04-04Electrical2505 2ND AVETenant improvement using existing load centers and circuits. Job#436584$32,583
7076432-EL2025-03-20Electrical1700 WESTLAKE AVE NTenant improvement using existing load centers and circuits. Job# 436587$65,240
7076237-EL2025-03-19Electrical1099 STEWART STTenant Improvement using existing load centers and circuits. 6)receptacles, 6)fixture relocates, 1)exit sign relocate. Job#437756$6,350
7074153-EL2025-03-07Electrical701 5TH AVECut in (1) dedicated duplex receptacle for the copier power at the new location using existing load center.$850
7073190-EL2025-03-03Electrical845 NE 125TH STReplace 100A Zinsco House Panel with new due to insurance requirements to keep insurance$1,860
7073219-EL2025-03-03Electrical1099 STEWART STTenant Improvement using existing circuits.$5,500
7069193-EL2025-02-28Electrical901 5TH AVE7th Floor TI using existing panel boards, load centers, and circuits.$215,345
7071963-EL2025-02-24Electrical1200 6TH AVETenant Improvement using existing load centers and circuits.$7,350
7072059-EL2025-02-24Electrical705 5TH AVE Sinstall 2 circuits, one for each office powered furniture section and one for a wall receptacle$3,232

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →