COMPANY RECORD · SEATTLE, WA
Valley Electric Co. Of Mount Vernon Inc — permit history in Seattle, WA
Valley Electric Co. Of Mount Vernon Inc appears on 1,110 Seattle permit records from 2015 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 1110 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 125 |
| 2016 | 129 |
| 2017 | 112 |
| 2018 | 77 |
| 2019 | 164 |
| 2020 | 105 |
| 2021 | 76 |
| 2022 | 79 |
| 2023 | 46 |
| 2024 | 61 |
| 2025 | 85 |
| 2026 | 51 |
Busiest year on record: 2019, with 164 permits. One project can account for several filings, so read this as filing activity rather than workload.
PROJECTS AHEAD SEARCH
Search every Seattle permit, not only this company's
This page is a snapshot of Valley Electric Co. Of Mount Vernon Inc. The search behind it holds more than 400,977 Seattle permits naming a contractor, since 2015: 251,769 electrical permits, 143,940 mechanical (HVAC) permits, 5,268 fire protection permits.
- Search the full history by company, address, permit type or date range.
- Set an alert and get an email when a new permit matches — the next permit Valley Electric Co. Of Mount Vernon Inc files, or any new electrical permit in Seattle. A new permit is an early signal of work to bid on, supply or finance.
- Export to CSV for your CRM or spreadsheet.
Free account: newest 7 days of records, 10 searches a day and 1 daily alert. Full history, CSV export and instant alerts on paid plans from $49 a month ($24.50 for the first 3 months). Compare plans
Where they worked
| Address in source | Most recent permit |
|---|---|
| 500 BOREN AVE N | 2026-10-26 |
| 2200 7TH AVE | 2026-10-20 |
| 325 9TH AVE | 2026-10-19 |
| 503 3RD AVE | 2026-10-15 |
| 504 NE 95TH ST | 2026-10-14 |
| 10330 MERIDIAN AVE N | 2026-09-29 |
| 1550 N 115TH ST | 2026-09-22 |
| 2401 S IRVING ST | 2026-09-15 |
| 3410 FREMONT AVE N | 2026-09-03 |
| 5149 S GRAHAM ST | 2026-08-31 |
| 2021 7TH AVE | 2026-08-24 |
| 3928 S GRAHAM ST | 2026-08-14 |
| 2820 S ORCAS ST | 2026-08-13 |
| 1959 NE PACIFIC ST | 2026-08-07 |
500 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $42,200,000, median $18,110. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Ec Electric | 89 | 2015–2026 |
| Mckinstry Co LLC | 87 | 2015–2026 |
| Prime Electric | 84 | 2015–2026 |
| Cochran Inc | 77 | 2015–2026 |
| Johnson Controls Fire Protection | 71 | 2015–2026 |
| Titan Electric Inc | 56 | 2015–2026 |
| Sequoyah Electric LLC | 48 | 2015–2026 |
| Guardian Security Systems Inc | 48 | 2015–2026 |
Companies that also appear in Seattle permit records at addresses where Valley Electric Co. Of Mount Vernon Inc filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
1,110 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7169130-EL | 2026-10-26 | Electrical | 500 BOREN AVE N | 21850 TI Refresh on the HVAC controls system | |
| 7168392-EL | 2026-10-20 | Electrical | 2200 7TH AVE | 21853. Adding controls to 2 EF and new HVAC units | |
| 7166576-EL | 2026-10-19 | Electrical | 325 9TH AVE | Valley Electric permit for project 16763 EWR 4 [10/19/26 KEF - Plan set approved.] | $50,000 |
| 7167664-EL | 2026-10-15 | Electrical | 503 3RD AVE | Replacing 10 lights, multiple LED strip lights, adding an enclosure for LED drivers in the electrical room and intercepting existing load side conductors for the driver enclosure. | |
| 7167317-EL | 2026-10-14 | Electrical | 504 NE 95TH ST | Installation of new CCTV, audio, visual, and telecommunication devices at Olympic View Elem. We will also be swapping out existing access control systems. VE Job # 40003-39(OLV) | |
| 7163727-EL | 2026-09-29 | Electrical | 10330 MERIDIAN AVE N | Valley Electric job # 50059 EWR 022 [9/29/26 BGO - Approved Plan Set for Relocatable MRI Building] | $60,000 |
| 7162746-EL | 2026-09-22 | Electrical | 1550 N 115TH ST | Valley Electric project WO#10004278 [9/22/26 KEF - Plan set approved.] | $15,000 |
| 7162645-EL | 2026-09-15 | Electrical | 2401 S IRVING ST | Installation of new CCTV, audio, visual, and telecommunication devices at Thurgood Marshall Elem. We will also be swapping out existing access control systems. VE Job # 40003-28(TH | |
| 7161226-EL | 2026-09-03 | Electrical | 3410 FREMONT AVE N | #10004289- One Meter R&R and PVC conduit repair. Repair directed by SCL to Toba Group. Valley Electric directed by TOBA Group- Sam Nashed was the SCL representative/contact. | |
| 7160652-EL | 2026-08-31 | Electrical | 5149 S GRAHAM ST | Installation of new CCTV, audio, visual, and telecommunication devices at Graham Hill Elem. We will also be swapping out existing access control systems. VE Job # 40003-02-(GRA). | |
| 7159498-EL | 2026-08-24 | Electrical | 2021 7TH AVE | Adding controls to 3 new units and re-terminating 2 existing units | |
| 7136516-EL | 2026-08-14 | Electrical | 3928 S GRAHAM ST | Modernization and building addition at Aki Kurose Middle School | $19,000,000 |
| 7158068-EL | 2026-08-13 | Electrical | 2820 S ORCAS ST | Installation of new CCTV, audio, visual, and telecommunication devices at Dearborn Park Elem. We will also be swapping out existing access control systems. VE Job # 40003-02-34(DPK | |
| 7154112-EL | 2026-08-07 | Electrical | 1959 NE PACIFIC ST | Valley Electric job# 50163 | $5,000 |
| 7138466-EL | 2026-07-22 | Electrical | 1959 NE PACIFIC ST | INTERIOR RENOVATION OF TWO PROCEDURE ROOMS TOTALING APPROXIMATELY 620 SQUARE FEET ON LEVEL THREE OF THE EXISTING SURGERY PAVILION. NORA Building Permit 7134676-CN [7/13/2026 | $227,000 |
| 7153599-EL | 2026-07-17 | Electrical | 2122 7TH AVE | 21828 Moving one FTU adding 4 new and an AC unit | |
| 7152425-EL | 2026-07-10 | Electrical | 1111 EXPEDIA GROUP WAY W | [7-10-26 D Rankin - plan review waved and permit issued] VE Job# 50080 - Repair 26kV Air Switch at Expedia, Seattle MATERIALS Needed for repair: (12' | $75,000 |
| 7152127-EL | 2026-07-09 | Electrical | 700 BROADWAY | Make safe electrical for demolition on levels 1 and 3. Level 3 build out a corridor | |
| 7151990-EL | 2026-07-08 | Electrical | 1111 EXPEDIA GROUP WAY W | Repair of SCL Medium Voltage Cabinet / Switch[7/10/2026 JBC Credited 225- 399amp Service and changed this permit to a Get Started Permit contractor is appling for a plan review per | |
| 7148381-EL | 2026-07-02 | Electrical | 1959 NE PACIFIC ST | Valley Electric job#50164 [7/2/26 KEF - Plan set approved.] | $18,000 |
| 7151088-EL | 2026-07-02 | Electrical | 615 WESTLAKE AVE N | Adding outlets for lab space. | |
| 7151147-EL | 2026-07-02 | Electrical | 1301 E YESLER WAY | Installation of new CCTV, audio, visual, and telecommunication devices at Bailey Gatzert Elem. We will also be swapping out existing access control systems. VE Job # 40003-02-25(GA | |
| 7150408-EL | 2026-06-29 | Electrical | 615 WESTLAKE AVE N | provide and install qty-3 outlets for lobby display. | |
| 7147033-EL | 2026-06-08 | Electrical | 11650 BEACON AVE S | Installation of new CCTV, audio, visual, and telecommunication devices at Rainier View Elem. We will also be swapping out existing access control systems. VE Job # 40003-02-24(RVU) | |
| 7144713-EL | 2026-06-08 | Electrical | 1111 13TH AVE | Valley Project #40005 Upgrades to the Gym building's rooftop units. Converting from gas to electric. We will be adding a new 600A panel to the roof which is fed from the MSB in th | $300,000 |
| 7139892-EL | 2026-05-11 | Electrical | 3928 S GRAHAM ST | Valley Job# 14754 800A temp power service for the Aki Kurose Middle School project. The 800A feed will come off an SCL transformer located on a nearby pole, into a CT cabinet, whi | $150,000 |
| 7142522-EL | 2026-05-11 | Electrical | 100 S KING ST | VE # 10004200 ADDING ELECTRICAL OUTLETS FOR OWNER | |
| 7140711-EL | 2026-04-29 | Electrical | 5251 SAND POINT WAY NE | VE#50147 - Changing existing light fixtures for new in various locations in the existing building . | |
| 7139772-EL | 2026-04-27 | Electrical | 4500 40TH AVE NE | Valley Electric permit for job#50158 [4/27/26 KEF - Plan set approved.] | $54,000 |
| 7134810-EL | 2026-04-23 | Electrical | 1959 NE PACIFIC ST | Valley Electric permit for job #50146 | $600,000 |
| 7139647-EL | 2026-04-22 | Electrical | 3928 S GRAHAM ST | Valley Project #14754 200A Temp power service for the AKMS trailer yard. We will be installing a 200A, 2PH, MCB panelboard with (6) 50A 2P breakers, and (4) 20A 1P breakers. | |
| 7139099-EL | 2026-04-20 | Electrical | 2101 7TH AVE | Adding low voltage controls to one new terminal unit | |
| 7137127-EL | 2026-04-17 | Electrical | 1959 NE PACIFIC ST | Valley Electric Project 30004 ASI 7 | $55,000 |
| 7138229-EL | 2026-04-14 | Electrical | 5425 24TH AVE NW | Temp Power for work provided at the Ballard Conveyance Diversion Structure - VE#19206 | |
| 7137999-EL | 2026-04-13 | Electrical | 7201 BEACON AVE S | Installation of new CCTV, audio, visual, and telecommunication devices at Van Asselt. We will also be swapping out existing access control systems. VE Job # 40003-02-23(VAN) | |
| 7137408-EL | 2026-04-08 | Electrical | 5425 24TH AVE NW | Temp Power for additional manholes and diversion structure construction at the Ballard Conveyance site | |
| 7137435-EL | 2026-04-08 | Electrical | 1919 S JACKSON ST | replace an existing 200A Panel with a new 200A Panel | |
| 7135285-EL | 2026-03-26 | Electrical | 303 S JACKSON ST | VE # 10004126 - Adding receptacle for coffee cart | |
| 7132537-EL | 2026-03-09 | Electrical | 723 S CONCORD ST | Installation of new CCTV, audio, visual, and telecommunication devices at Concord International. We will also be swapping out existing access control systems. VE Job # 40003-02-26( | |
| 7131260-EL | 2026-02-27 | Electrical | 4800 S HENDERSON ST | Installation of new CCTV, audio, visual, and telecommunication devices at South Shore. We will also be swapping out existing access control systems. VE Job # 40003-02-30(SSH). | |
| 7129441-EL | 2026-02-16 | Electrical | 12015 31ST AVE NE | VE #10004134 Install new circuit for managers office | |
| 7129448-EL | 2026-02-16 | Electrical | 1415 SUMMIT AVE | VE #10004097 Going through the lighting system and reprogram. Replace modules as needed, if needed | |
| 7129173-EL | 2026-02-12 | Electrical | 11016 8TH AVE NE | VE# 10004107 I am not adding any circuits, i am only swapping out (3) pole light heads | |
| 7127662-EL | 2026-02-03 | Electrical | 6185 4TH AVE S | VE Job #19189 KC SM Works - Rewired and extended heat trace circuits for different indication lighting and installed the associated raceway system. | |
| 7126874-EL | 2026-01-28 | Electrical | 1730 MINOR AVE | ||
| 7126965-EL | 2026-01-28 | Electrical | 111 TERRY AVE N | Meter Stack Replacement | |
| 7124636-EL | 2026-01-20 | Electrical | 325 9TH AVE | Electrical scope to construct alterations and install diagnostic equipment at ground level lab of institutional building [1/20/26 BGO - Approved Plan Set] [2/2/26 BGO - Approved Re | $356,875 |
| 7125484-EL | 2026-01-19 | Electrical | 1431 2ND AVE N | ||
| 7125485-EL | 2026-01-19 | Electrical | 3528 S FERDINAND ST | ||
| 7125093-EL | 2026-01-15 | Electrical | 9237 12TH AVE NW |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
