COMPANY RECORD · SEATTLE, WA
Sequoyah Electric LLC — permit history in Seattle, WA
Sequoyah Electric LLC appears on 2,485 Seattle permit records from 2015 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 2485 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 165 |
| 2016 | 174 |
| 2017 | 215 |
| 2018 | 309 |
| 2019 | 353 |
| 2020 | 371 |
| 2021 | 275 |
| 2022 | 154 |
| 2023 | 79 |
| 2024 | 158 |
| 2025 | 143 |
| 2026 | 89 |
Busiest year on record: 2020, with 371 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 5500 PHINNEY AVE N | 2026-08-26 |
| 60 YESLER WAY | 2026-08-24 |
| 1420 S TRENTON ST | 2026-07-28 |
| 8319 8TH AVE S | 2026-07-23 |
| 804 9TH AVE | 2026-07-20 |
| 100 S KING ST | 2026-07-08 |
| 2001 6TH AVE | 2026-07-06 |
| 7561 63RD AVE NE | 2026-06-09 |
| 1229 MADISON ST | 2026-06-05 |
| 1101 MADISON ST | 2026-05-29 |
| 3204 SW MORGAN ST | 2026-05-17 |
| 7755 EAST MARGINAL WAY S | 2026-05-14 |
| 4020 NE 55TH ST | 2026-05-11 |
| 2901 WESTERN AVE | 2026-05-08 |
612 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $12,404,075, median $3,500. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
2,485 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7159928-EL | 2026-08-26 | Electrical | 5500 PHINNEY AVE N | Provide & install (1) 200-amp feeder, (2) 20-amp circuits, and data conduit | |
| 7159487-EL | 2026-08-24 | Electrical | 60 YESLER WAY | Install Receptacle at Reception Lobby - SEQ #7318704 | |
| 7155196-EL | 2026-07-28 | Electrical | 1420 S TRENTON ST | Install 225A subpanel. Feed (1) 20A receptacle, (1) 30A receptacle & Disco, (1) 100A receptacle & disco. SEQ #203756 | |
| 7154582-EL | 2026-07-23 | Electrical | 8319 8TH AVE S | (1) new 60A circuit - SEQ #306567 | |
| 7153942-EL | 2026-07-20 | Electrical | 804 9TH AVE | Temp Power for Special Event (Annual Picnic) - SEQ #7318588 | |
| 7151963-EL | 2026-07-08 | Electrical | 100 S KING ST | Install (1) 20A Circuit for a flow meter in the beverage storage room, fed from electrical panel in the Mechanical room next door. SEQ #7318510 | |
| 7151391-EL | 2026-07-06 | Electrical | 2001 6TH AVE | Installing (1) 20A 120v circuit - SEQ #531366 | |
| 7145584-EL | 2026-06-16 | Electrical | 2001 6TH AVE | New IO64 subpanel being installed to monitoring the replaced CRAC units. Sub panel will relay alarm, supervisory and trouble signals to the house panel. J 297818 associated mechani | $6,000 |
| 7147160-EL | 2026-06-09 | Electrical | 7561 63RD AVE NE | Install one (1) 120V 20A circuit for (24) LED 2X4 troffers in a drop ceiling - SEQ 306532 | |
| 7146689-EL | 2026-06-05 | Electrical | 1229 MADISON ST | Load Bank Test - SEQ #7318383 | |
| 7145358-EL | 2026-05-29 | Electrical | 1101 MADISON ST | Load Bank Test, 600kw,480vac - SEQ #7318357[CF 6/2/2026 - Address changed to 1101 MADISON ST to match load bank test for accurate. Was performed at satellite building, not main cam | |
| 7143547-EL | 2026-05-17 | Electrical | 3204 SW MORGAN ST | Load Bank Test - SEQ #7318296 | |
| 7137996-EL | 2026-05-14 | Electrical | 7755 EAST MARGINAL WAY S | (1) 75kVA Xfmr, (1) 225A Panel, (1) 400hz converter, (1) 125A panel. (1) 50A breaker in existing, (12) 30A ckts, (5) 20A ckts - SEQ #203639 [5/14/26 KEF - Plan set approved.] | $180,000 |
| 7142856-EL | 2026-05-12 | Electrical | 5500 PHINNEY AVE N | Extend 6 existing circuits - SEQ #7318183 | |
| 7142563-EL | 2026-05-11 | Electrical | 4020 NE 55TH ST | Generator Load Bank Test - SEQ #7318264 | |
| 7142196-EL | 2026-05-08 | Electrical | 2901 WESTERN AVE | Install (3) Light Fixtures | |
| 7141520-EL | 2026-05-05 | Electrical | 1918 8TH AVE | Install 14 cat6 cables, 2 per location, and 4 WAPs - SEQ #404260 | |
| 7141292-EL | 2026-05-04 | Electrical | 6900 37TH AVE S | Load Bank Test 150KW/208V, 3PHASE - SEQ #7318199 | |
| 7141089-EL | 2026-05-01 | Electrical | 7755 EAST MARGINAL WAY S | (1) 30A circuit under raised floor - SEQ #203668 | |
| 7141116-EL | 2026-05-01 | Electrical | 207 BOREN AVE N | Installation of (1) 30A 120V receptacle, (1) 20A 120V duplex, new conduit pathway and rough-in for AV cabling by others. Rough-in for (1) secure door, rough-in for (4) HVAC devices | |
| 7141144-EL | 2026-05-01 | Electrical | 6105 ROOSEVELT WAY NE | Replace existing (8) door access control system. Modify (1) existing 20amp circuit to replace existing power supplies with new - SEQ #7418158 | |
| 7141186-EL | 2026-05-01 | Electrical | 1420 S TRENTON ST | (1) additional 120V 20A circuit to feed air products devices on exterior of building - SEQ #203672 | |
| 7140150-EL | 2026-04-27 | Electrical | 11616 AURORA AVE N | Load Bank Test - SEQ 7318152 | |
| 7139923-EL | 2026-04-24 | Electrical | 13537 AURORA AVE N | Generator 2hr Load Bank Test - SEQ #7318145 | |
| 7139463-EL | 2026-04-21 | Electrical | 4209 WEST MARGINAL WAY SW | Install three (3) 60A 1-phase 208V circuits from brand new panel for Level 2 EV chargers - SEQ #306479 | |
| 7139129-EL | 2026-04-20 | Electrical | 207 BOREN AVE N | Conduit and rough-in for (2) new secure doors, (1) new 20A 120V duplex receptacle, (1) 20A 120V circuit for new security panel, relocation of (2) exit signs - SEQ #306471 | |
| 7139253-EL | 2026-04-20 | Electrical | 2810 S MCCLELLAN ST | Install (1) 20A Circuit - SEQ #7318112 | |
| 7139034-EL | 2026-04-18 | Electrical | 922 MCGILVRA BLVD E | Demo & re-route 90A 208V 3-ph branch circuit - SEQ #7318032 Demo & re-feed 40A 208V 3-ph branch circuit Demo & re-feed 50A 208V 1-ph branch circuit | |
| 7138391-EL | 2026-04-15 | Electrical | 116 FAIRVIEW AVE N | Installation of (7) category 6 cabling for additional WAP's to support wireless Point of Sale system - SEQ #7417562 | |
| 7138205-EL | 2026-04-14 | Electrical | 6133 6TH AVE S | (1) 20A Circuit for Ductless Split - SEQ #7318079 | |
| 7138169-EL | 2026-04-14 | Electrical | 818 S DAKOTA ST | Raise overhead feeders to accommodate roof maintenance - SEQ #7317663 | |
| 7138350-EL | 2026-04-14 | Electrical | 505 1ST AVE S | Provide electrical support for 2-hr load bank testing - SEQ #7318084 | |
| 7137593-EL | 2026-04-09 | Electrical | 306 QUEEN ANNE AVE N | Replace existing (10) door Access Control system with new. Includes modifying (1) 120vac 20amp circuit to power new ACS power supply - SEQ #7417945 | |
| 7137590-EL | 2026-04-09 | Electrical | 2334 ELLIOTT AVE | Replace existing (32) door Access Control system with new. Includes modifying (2) 120vac 20amp circuits to power new ACS power supplies - SEQ #7417875 | |
| 7137587-EL | 2026-04-09 | Electrical | 315 1ST AVE W | Replace DoorKing Intercom with ButterflyMX Intercom. Add long range vehicle reader to garage gate - SEQ 7417931 | |
| 7137574-EL | 2026-04-09 | Electrical | 7320 EAST GREEN LAKE DR N | Install (2) 40A 240V circuits for owner provided EV chargers and make connections - SEQ #7318041 | |
| 7137455-EL | 2026-04-08 | Electrical | 5500 PHINNEY AVE N | Install conduit for data by others - SEQ #7318042 | |
| 7137385-EL | 2026-04-08 | Electrical | 3600 4TH AVE S | Alter (2) 208V 40A circuits. Alter (1) 480V 350A circuit - SEQ #306477 | |
| 7136923-EL | 2026-04-06 | Electrical | 310 15TH AVE | 4hr Load Bank Test, M#5V5078 / S #SNA06832 - SEQ #7318029 | |
| 7136995-EL | 2026-04-06 | Electrical | 5018 OHIO AVE S | (3) 120V/20A Circuits - SEQ #7318025 | |
| 7136914-EL | 2026-04-06 | Electrical | 125 16TH AVE | 4hr Load Bank Test for Caterpillar M #5N6870 / S #17100600 - SEQ #7318027 | |
| 7136917-EL | 2026-04-06 | Electrical | 125 16TH AVE | 4hr Load Bank Test, M #SR4 / S #6FA04416 - SEQ #7318028 | |
| 7136555-EL | 2026-04-02 | Electrical | 950 N 72ND ST | Replace existing (12) door Access Control system with new. Includes modifying (1) 120vac circuit to power new ACS power supply - SEQ 7417456 | |
| 7136349-EL | 2026-04-01 | Electrical | 7755 EAST MARGINAL WAY S | Add (3) additional 120v 20A circuits (running under raised floor) - SEQ #203632 | |
| 7136051-EL | 2026-03-31 | Electrical | 960 REPUBLICAN ST | Install (1) new circuit and disconnect to serve new 208V 3ph motor, Install (4) 20A duplex receptacles and (3) 20A circuits | |
| 7135887-EL | 2026-03-30 | Electrical | 804 9TH AVE | Install (1) 60A 3Ph breaker and (1) surge suppressor in MDP - SEQ 7317851 | |
| 7135657-EL | 2026-03-27 | Electrical | 2121 7TH AVE | Relocate (3) existing light fixtures and install (5) new fixtures, modify lighting controls. Install (2) duplexes (2) quadraplexes and (1) poke through floor box. Relocate power co | |
| 7134446-EL | 2026-03-20 | Electrical | 2212 7TH AVE | Demo (6) existing fixtures, install (5) new lights, Install (1) 208v/30a circuit for espresso machine, Install (1) 20a/120v circuit. Provide security pathways at new gate - SEQ #30 | |
| 7134151-EL | 2026-03-19 | Electrical | 1414 12TH AVE | Install a 1" EMT conduit from garage to rooftop for a security camera installed by others - SEQ #306498[Project scope changed permit withdrawn with no work completed] | |
| 7134264-EL | 2026-03-19 | Electrical | 4570 TEXAS WAY W | Install two Level 2 EV Chargers from an existing load manager and circuit - SEQ #306432 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
