COMPANY RECORD · NEW YORK, NY
S.B.A. Plumbing Corp — permit history in New York, NY
S.B.A. Plumbing Corp appears on 283 New York permit records from 2019 through 2026, most often plumbing (77.3% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 249 | 77.3% |
| Fire protection | 73 | 22.7% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 24 |
| 2020 | 61 |
| 2021 | 57 |
| 2022 | 64 |
| 2023 | 32 |
| 2024 | 32 |
| 2025 | 39 |
| 2026 | 13 |
Busiest year on record: 2022, with 64 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Variant Services Inc | 13 | 2026-04-15 |
| Icon Interiors Inc | 5 | 2026-07-30 |
| John Gallin & Son, Inc | 3 | 2026-06-30 |
| Ambassador Construction C | 2 | 2023-06-23 |
| Plaza Construction LLC | 2 | 2024-06-27 |
| Primary Built LLC | 2 | 2026-06-03 |
| Ny Skills Construction In | 1 | 2024-06-27 |
| Spk/Lewis Construction Ll | 1 | 2025-02-24 |
| Structure Tone, LLC | 1 | 2025-04-08 |
| Unity Construction Group | 1 | 2026-05-07 |
| W5 Group LLC | 1 | 2026-06-04 |
11 companies are named alongside S.B.A. Plumbing Corp on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 575 MADISON AVENUE | 2026-07-30 |
| 475 RIVERSIDE DRIVE | 2026-06-30 |
| 595 MADISON AVENUE | 2026-06-25 |
| 1290 AVENUE OF THE AMERICAS | 2026-06-04 |
| 66 HUDSON BOULEVARD EAST | 2026-06-03 |
| 1700 BROADWAY | 2026-05-07 |
| 650 FIFTH AVENUE | 2026-01-26 |
| 12 EAST 49 STREET | 2025-10-24 |
| 9 WEST 57 STREET | 2025-09-19 |
| 717 FIFTH AVENUE | 2025-07-29 |
| 767 5 AVENUE | 2025-07-28 |
| 1345 6 AVENUE | 2025-07-28 |
| 225 LIBERTY STREET | 2025-07-09 |
| 530 FIFTH AVENUE | 2025-06-30 |
94 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,000 to $1,326,200, median $40,112. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
283 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01375108-S3-PL | 2026-07-30 | Plumbing | 575 MADISON AVENUE | plumbing modifications to the 17th floor as per plans filed herewith. No change is use, egress or occupancy. | $39,000 |
| M01397591-S3-PL | 2026-06-30 | Plumbing | 475 RIVERSIDE DRIVE | PLUMBING PIPING MODIFICATIONS FOR FIRST FLOOR MEETING ROOM SPACES AS PER PLANS FILED HEREWITH. | $15,385 |
| M01397591-S4-EW-SP | 2026-06-30 | Fire protection | 475 RIVERSIDE DRIVE | SPRINKLER MODIFICATIONS FOR GROUND FLOOR MEETING ROOMS AS PER PLANS FILED HEREWITH. | $47,880 |
| M01405792-I1-PL | 2026-06-25 | Plumbing | 595 MADISON AVENUE | Plumbing work on part of the 4th floor (Aerin) as indicated on drawings. | $22,000 |
| M01405812-I1-EW-SP | 2026-06-23 | Fire protection | 595 MADISON AVENUE | Sprinkler work on the 4th floor (Aerin) as indicated on drawings. | $26,000 |
| M01380191-S2-PL | 2026-06-04 | Plumbing | 1290 AVENUE OF THE AMERICAS | Herewith Filing removal of plumbing fixtures in conjunction with interior demolition spaces as per plans. No change in use, egress or occupancy. | $17,964 |
| M01367219-S3-EW-SP | 2026-06-03 | Fire protection | 66 HUDSON BOULEVARD EAST | INSTALLATION OF NEW SPRINKLER HEADS & INSTALLATION OF FIRE HOSE RACKS TO THE STANDPIPE AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $325,000 |
| M01367219-S2-PL | 2026-06-03 | Plumbing | 66 HUDSON BOULEVARD EAST | INSTALLATION OF NEW PLUMBING FIXTURES AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $650,000 |
| M01369804-S2-PL | 2026-05-07 | Plumbing | 1700 BROADWAY | REMOVAL OF FIXTURES IN KITCHEN, RESTROOMS WITH ALL ASSOCIATED PIPING.ALL ROUGH-INS TO REMAIN.NEW FIXTURES CONNECT TO EXISTING ROUGH-INS AND INSTALLATION OF PANTRY SINKS, APPLIANCES | $50,000 |
| M01268133-S1-PL | 2026-04-15 | Plumbing | 575 MADISON AVENUE | Plumbing modifications to the 19C/20M floor as per plans filed herewith. No change is use, egress or occupancy. | $99,000 |
| M01268133-S3-EW-SP | 2026-04-15 | Fire protection | 575 MADISON AVENUE | Sprinkler modifications to the 19C/20M floor as per plans filed herewith. No change is use, egress or occupancy. | $94,999 |
| M01323190-I1-PL | 2026-01-26 | Plumbing | 650 FIFTH AVENUE | Modifications to the existing plumbing system on the 19th floor (Buildout) as per plans. No change to use, egress or occupancy | $86,392 |
| M01333284-I1-PL | 2026-01-26 | Plumbing | 650 FIFTH AVENUE | Modifications to the existing plumbing system on the 29th floor (Sapient Capital) as per plans. No change to use, egress or occupancy | $64,686 |
| M01245459-I1-PL | 2025-11-06 | Plumbing | 595 MADISON AVENUE | Plumbing work on the 5th floor (MB&F) as indicated on drawings | $13,500 |
| M01245464-I1-EW-SP | 2025-11-05 | Fire protection | 595 MADISON AVENUE | Sprinkler work on the 5th floor (MB&F) as indicated on drawings. | $11,000 |
| M01250239-I1-PL | 2025-10-29 | Plumbing | 595 MADISON AVENUE | Plumbing work on part of the 18th floor (Tom Ford) as indicated on drawings. | $26,000 |
| M01277175-I1-PL | 2025-10-24 | Plumbing | 12 EAST 49 STREET | Plumbing work on the 30th floor (31st floor marketing) as indicated on drawings. | $42,000 |
| M01277183-I1-EW-SP | 2025-10-24 | Fire protection | 12 EAST 49 STREET | Sprinkler work on the 30th floor construction (31st floor marketing) as indicated on drawings. | $25,000 |
| M01275681-I1-PL | 2025-09-19 | Plumbing | 9 WEST 57 STREET | PLUMBING MODIFICATIONS TAKING PLACE ON 29 FLOOR CONSTRUCTON (30 FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $139,152 |
| M01244601-I1-EW-SP | 2025-09-12 | Fire protection | 595 MADISON AVENUE | Sprinkler work on part of the 38th floor (Maple Park turnkey) as indicated on drawings. | $3,700 |
| M01227853-I1-PL | 2025-09-03 | Plumbing | 12 EAST 49 STREET | Plumbing work on the 21st floor (22nd floor marketing) (Industrious office) as indicated on drawings. | $160,000 |
| M01249853-I1-EW-SP | 2025-08-13 | Fire protection | 595 MADISON AVENUE | Sprinkler work on part of the 7th floor (MER relocation) as indicated on drawings. | $8,492 |
| M01249844-I1-PL | 2025-08-07 | Plumbing | 595 MADISON AVENUE | Plumbing work on part of the 7th floor (MER relocation) as indicated on drawings. | $14,562 |
| M01248289-I1-PL | 2025-08-07 | Plumbing | 595 MADISON AVENUE | Plumbing work on the 7th floor (Briony Raymond) as indicated on drawings. | $21,000 |
| M01154485-I1-PL | 2025-07-29 | Plumbing | 717 FIFTH AVENUE | PLUMBING MODIFICATIONS TAKING PLACE ON THE 14TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $79,516 |
| M01246704-S2-PL | 2025-07-28 | Plumbing | 767 5 AVENUE | Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy. | $70,000 |
| M01246704-S3-EW-SP | 2025-07-28 | Fire protection | 767 5 AVENUE | Modification/addition to sprinkler system and related piping. Remove Temporary Core Sprinkler Protection as shown on drawings. No change in use, egress or occupancy. | $25,000 |
| M01227897-I1-EW-SP | 2025-07-28 | Fire protection | 1345 6 AVENUE | Sprinkler Modifications to take place on the 10th floor as per drawings filed herewith. No change in use, egress, or occupancy. | $84,233 |
| M01227981-I1-PL | 2025-07-28 | Plumbing | 1345 6 AVENUE | Plumbing Modifications to take place on the 10th floor as per drawings filed herewith. No change in use, egress, or occupancy. | $23,500 |
| M01154487-I1-EW-SP | 2025-07-24 | Fire protection | 717 FIFTH AVENUE | SPRINKLER MODIFICATIONS TAKING PLACE ON THE 14th FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $27,009 |
| M01227896-I1-PL | 2025-07-17 | Plumbing | 12 EAST 49 STREET | Plumbing work on the 31st floor (NW suite) as indicated on drawings. | $20,000 |
| M01227899-I1-EW-SP | 2025-07-15 | Fire protection | 12 EAST 49 STREET | Sprinkler work on the 31st floor (NW suite) as indicated on drawings. | $17,000 |
| M01235680-S2-PL | 2025-07-09 | Plumbing | 225 LIBERTY STREET | Plumbing work as shown on plans filed herewith. No change to use egress or occupancy. | $142,092 |
| M01200592-I1-EW-SP | 2025-06-30 | Fire protection | 530 FIFTH AVENUE | Sprinkler modifications taking place on the 10th floor as per drawings filed herewith. No change in use, egress or occupancy. | $6,500 |
| M01192456-I1-PL | 2025-06-25 | Plumbing | 1 PARK AVENUE | Plumbing work on the 18th floor (19th floor CO) as indicated on drawings. | $107,100 |
| M01192463-I1-EW-SP | 2025-06-25 | Fire protection | 1 PARK AVENUE | Sprinkler work on the 18th floor (19th floor CO) as indicated on drawings. | $10,350 |
| M01177687-I1-PL | 2025-06-10 | Plumbing | 1290 AVENUE OF THE AMERICAS | Removal of plumbing fixtures on the 6th floor as indicated on drawings. | $19,869 |
| M01188422-I1-PL | 2025-06-05 | Plumbing | 1290 AVENUE OF THE AMERICAS | Plumbing work on the cellar and 1st floor (Old Chase space) to cap and remove fixtures as indicated on drawings. | $9,129 |
| M01189559-I1-PL | 2025-05-27 | Plumbing | 320 PARK AVENUE | Plumbing modifications taking place on the 1st & 2nd floors as per plans filed herewith. No change in use, egress or occupancy | $95,000 |
| M01187813-I1-PL | 2025-05-02 | Plumbing | 530 FIFTH AVENUE | Plumbing modifications taking place on the 10th floor as per drawings filed herewith. No change in use, egress or occupancy. | $19,000 |
| M01189933-S2-EW-SP | 2025-04-28 | Fire protection | 575 MADISON AVENUE | SPRINKLER MODIFICATIONS ON THE 15th FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY. | $50,000 |
| M01173672-I1-EW-SP | 2025-04-28 | Fire protection | 1 PENN PLAZA | Minor sprinkler work on the 41st floor (Molton Brown/Kao) as indicated on drawings. | $6,200 |
| M01046008-I1-PL | 2025-04-22 | Plumbing | 50 WEST 57 STREET | Demolition of plumbing fixtures on the cellar, 1st floor and mezzanine as indicated on drawings. | $10,000 |
| M01189933-S3-PL | 2025-04-22 | Plumbing | 575 MADISON AVENUE | PLUMBING MODIFICATIONS ON THE 15th FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY. | $115,000 |
| M01196195-I1-PL | 2025-04-21 | Plumbing | 200 VARICK STREET | installation of Plumbing fixtures along with related piping. | $40,000 |
| M01156882-S2-PL | 2025-04-08 | Plumbing | 320 PARK AVENUE | Plumbing Fixture changes as indicated on plans. | $30,000 |
| M01164478-I1-EW-SP | 2025-03-27 | Fire protection | 1 PENN PLAZA | Sprinkler work on the 16th floor (WSITM) as indicated on drawings. | $15,000 |
| M01169929-S1-PL | 2025-02-24 | Plumbing | 400 PARK AVENUE | Plumbing work on the 4th floor to include relocation of existing plumbing fixtures. No change in use, egress or occupancy is involved. | $13,000 |
| M01004628-I1-EW-SP | 2025-02-13 | Fire protection | 717 FIFTH AVENUE | SPRINKLER MODIFICATIONS TAKING PLACE ON THE 14th FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $2,950 |
| M01017514-I1-PL | 2025-02-12 | Plumbing | 717 FIFTH AVENUE | PLUMBING MODIFICATIONS TAKING PLACE ON THE 14TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $36,100 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
