COMPANY RECORD · NEW YORK, NY
Icon Interiors Inc — permit history in New York, NY
Icon Interiors Inc appears on 628 New York permit records from 2019 through 2026, most often mechanical / hvac (51.2% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Mechanical / HVAC | 325 | 51.2% |
| General construction | 309 | 48.7% |
| Fire protection | 1 | 0.16% |
3 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 27 |
| 2020 | 31 |
| 2021 | 67 |
| 2022 | 128 |
| 2023 | 79 |
| 2024 | 89 |
| 2025 | 117 |
| 2026 | 97 |
Busiest year on record: 2022, with 128 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| A&A Plumbing Corp | 28 | 2026-08-11 |
| Psi Partners, LLC | 26 | 2026-08-05 |
| William C. Gerakaris P&H | 14 | 2026-07-14 |
| Abco-Peerless Sprklr Corp | 12 | 2026-07-14 |
| Full Capacity Fire Corp | 9 | 2026-07-13 |
| Preferred Mechanical Inc | 7 | 2025-12-03 |
| Par Plumbing Co., Inc | 6 | 2026-06-25 |
| Standard Fire Protect LLC | 6 | 2025-12-04 |
| S.B.A. Plumbing Corp | 5 | 2026-07-30 |
| Aggressive Fire Prot LLC | 5 | 2026-07-14 |
| Par Fire Protection LLC | 4 | 2026-03-03 |
| Preferred Spklr And Mech | 4 | 2026-04-07 |
21 companies are named alongside Icon Interiors Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1 PENN PLAZA | 2026-08-26 |
| 520 FIFTH AVENUE | 2026-08-18 |
| 799 BROADWAY | 2026-08-17 |
| 560 LEXINGTON AVENUE | 2026-07-30 |
| 485 LEXINGTON AVENUE | 2026-07-22 |
| 360 MADISON AVENUE | 2026-07-22 |
| 605 THIRD AVENUE | 2026-07-09 |
| 11 MADISON AVENUE | 2026-06-30 |
| 510 MADISON AVENUE | 2026-06-23 |
| 575 MADISON AVENUE | 2026-06-22 |
| 287 PARK AVENUE SOUTH | 2026-06-01 |
| 99 PARK AVENUE | 2026-05-22 |
| 320 PARK AVENUE | 2026-05-19 |
| 387 PARK AVENUE SOUTH | 2026-05-13 |
141 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $17,767,280, median $279,956. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
628 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01439404-I1-GC | 2026-08-26 | General construction | 1 PENN PLAZA | Construction work on the 15th floor (Acuity) as indicated on drawings. | $300,000 |
| M01439405-I1-MS | 2026-08-25 | Mechanical / HVAC | 1 PENN PLAZA | Mechanical work on the 15th floor (Acuity) as indicated on drawings. | $100,000 |
| M01439240-I1-GC | 2026-08-25 | General construction | 1 PENN PLAZA | Construction work on the 6th floor (VHB office relocation) as indicated on drawings. | $1,200,000 |
| M01426485-I1-GC | 2026-08-18 | General construction | 520 FIFTH AVENUE | REMOVAL AND INSTILLATION OF INTERIOR NON LOAD BEARING PARTITIONS AND RELATED FINISHES. FILED IN CONJUCTION WITH NEW BUILDING APPLICATION 121209192. MPP 47. | $900,000 |
| M01426485-S1-MS | 2026-08-18 | Mechanical / HVAC | 520 FIFTH AVENUE | Modification to existing Mechanical System as per plans filed herewith. No change in use, egress or occupancy under this application. | $0 |
| M01434684-S1-MS | 2026-08-17 | Mechanical / HVAC | 799 BROADWAY | Mechanical modifications taking place on the 4th & 5th floors as indicated on the drawings. | $48,000 |
| M01434684-I1-GC | 2026-08-14 | General construction | 799 BROADWAY | Construction modifications taking place on the 4th & 5th floors as indicated on the drawings. | $310,000 |
| M01388500-I1-GC | 2026-08-05 | General construction | 520 FIFTH AVENUE | REMOVAL AND INSTILLATION OF INTERIOR NON LOAD BEARING PARTITIONS AND RELATED FINISHES. FILED IN CONJUCTION WITH NEW BUILDING APPLICATION 121209192. MPP 47. | $1,075,000 |
| M01388500-S1-MS | 2026-08-05 | Mechanical / HVAC | 520 FIFTH AVENUE | Modification to existing Mechanical System as per plans filed herewith. No change in use, egress or occupancy under this application. | $300,000 |
| M01419394-S1-MS | 2026-07-30 | Mechanical / HVAC | 560 LEXINGTON AVENUE | FILING FOR MECHANICAL WORK ASSOCIATED WITH INTERIOR RENO OF 18TH FLOOR ALLY BRIDGE OFFICE AS PER PLANS SUBMITTED HEREWITH. | $145,645 |
| M01419394-I1-GC | 2026-07-27 | General construction | 560 LEXINGTON AVENUE | FILING FOR INTERIOR RENO FOR 18TH FLOOR ALLY BRIDGE OFFICE SPACE AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $424,015 |
| M01426670-I1-GC | 2026-07-22 | General construction | 485 LEXINGTON AVENUE | Minor demolition with installation of new partitions, doors, ceilings and finishes on the 16th floor (IQVIA) as per plans. No change to use, egress or occupancy. | $535,050 |
| M01382574-I1-MS | 2026-07-22 | Mechanical / HVAC | 360 MADISON AVENUE | REMOVE AND INSTALL HVAC EQUIPMENT, A/C UNITS, DUCTWORK AND PIPING IN 15TH & 16TH FLOOR OFFICE SAPCE AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $31,000 |
| M01426699-I1-MS | 2026-07-22 | Mechanical / HVAC | 485 LEXINGTON AVENUE | Modifications to the existing HVAC system on the 16th floor (IQVIA) as per plans. No change to use, egress or occupancy. | $115,950 |
| M01409870-I1-GC | 2026-07-10 | General construction | 560 LEXINGTON AVENUE | FILING FOR INTERIOR RENO FOR 12TH THROUGH 14TH FLOORS FOR MAREX OFFICE SPACE AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $2,580,000 |
| M01409870-S1-MS | 2026-07-10 | Mechanical / HVAC | 560 LEXINGTON AVENUE | FILING FOR MECHANICAL WORK ASSOCIATED WITH INTERIOR RENOVATION OF 12, 13, AND 14TH FLOORS FOR MAREX OFFICE AS PER PLANS SUBMITTED HEREWITH. | $1,100,000 |
| M01397748-I1-GC | 2026-07-09 | General construction | 605 THIRD AVENUE | Construction modifications taking place on the 31st floor (32nd Marketing floor) as indicated on the drawings. | $2,600,000 |
| M01397748-S1-MS | 2026-07-09 | Mechanical / HVAC | 605 THIRD AVENUE | Mechanical modifications taking place on the 31st floor (32nd floor Marketing) as indicated on the drawings. | $300,000 |
| M01386818-S1-MS | 2026-07-02 | Mechanical / HVAC | 560 LEXINGTON AVENUE | FILING FOR MECHANICAL WORK ASSOCIATED WITH INTERIOR RENO OF 6TH FLOOR DYNASTY OFFICE AS PER PLANS SUBMITTED HEREWITH. | $101,800 |
| M01398996-I1-GC | 2026-06-30 | General construction | 11 MADISON AVENUE | INTERIOR FITOUT ALTERATIONS TO 14TH FLOOR. WORK INCLUDES NEW NON-STRUCTURAL WALLS, DOORS, CEILINGS, AND FINISHES FOR OFFICE USE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $5,355,082 |
| M01399004-I1-MS | 2026-06-30 | Mechanical / HVAC | 11 MADISON AVENUE | Modification of mechanical systems as per plans filed herewith. No change in use, occupancy or egress. | $1,316,429 |
| M01415850-I1-GC | 2026-06-23 | General construction | 510 MADISON AVENUE | Removal and construction of interior partitions, doors and ceiling as shown on drawings. No change in use, egress or occupancy. | $2,000,000 |
| M01415850-S1-MS | 2026-06-23 | Mechanical / HVAC | 510 MADISON AVENUE | Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy. | $785,000 |
| M01375108-S1-MS | 2026-06-22 | Mechanical / HVAC | 575 MADISON AVENUE | mechanical modifications to the 17th floor as per plans filed herewith. No change is use, egress or occupancy. | $265,000 |
| M01386818-I1-GC | 2026-06-18 | General construction | 560 LEXINGTON AVENUE | FILING FOR INTERIOR RENO FOR 6TH FLOOR DYNASTY OFFICE SPACE AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $330,943 |
| M01375108-I1-GC | 2026-06-17 | General construction | 575 MADISON AVENUE | GENERAL CONSTRUCTION MODIFICATIONS ON THE 17TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY. | $640,032 |
| M01346966-I1-MS | 2026-06-01 | Mechanical / HVAC | 287 PARK AVENUE SOUTH | Modification to the existing HVAC system on the 8th floor as per plans (Demolition). No change to use, egress or occupancy. | $15,481 |
| M01342677-I1-GC | 2026-05-22 | General construction | 99 PARK AVENUE | AT 25TH FLOOR TENANT SPACE, INSTALLATION OF INTERIOR PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $161,487 |
| M01342681-I1-MS | 2026-05-22 | Mechanical / HVAC | 99 PARK AVENUE | AT 25TH FLOOR TENANT SPACE, ADDITIONS/MODIFICATION TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $98,963 |
| M01303705-I1-GC | 2026-05-21 | General construction | 99 PARK AVENUE | AT 7TH FLOOR TENANT SPACE, INSTALLATION OF INTERIOR PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. RELATED JOB #S: M01303710,M01303715 | $2,835,300 |
| M01303710-I1-MS | 2026-05-21 | Mechanical / HVAC | 99 PARK AVENUE | AT 7TH FLOOR TENANT SPACE, ADDITIONS/MODIFICATION TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $612,839 |
| M01384039-S2-MS | 2026-05-19 | Mechanical / HVAC | 560 LEXINGTON AVENUE | FILING FOR MECHANICAL WORK ASSOCIATED WITH INTERIOR RENO OF 19TH FLOOR SUMMIT TX OFFICE AS PER PLANS SUBMITTED HEREWITH. | $296,500 |
| M01384039-I1-GC | 2026-05-19 | General construction | 560 LEXINGTON AVENUE | FILING FOR INTERIOR RENO FOR 17TH FLOOR PREBUILT OFFICE SPACE AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $1,101,174 |
| M01388386-I1-MS | 2026-05-19 | Mechanical / HVAC | 320 PARK AVENUE | Modifications to existing mechanical system as per plans filed herewith. | $285,000 |
| M01388384-I1-GC | 2026-05-19 | General construction | 320 PARK AVENUE | Interior renovation as per plans filed herewith. No change in use, egress or occupancy. | $350,000 |
| M01386383-I1-MS | 2026-05-15 | Mechanical / HVAC | 11 MADISON AVENUE | Modification of mechanical systems as per plans filed herewith. No change in use, occupancy or egress. | $30,833 |
| M01386371-I1-GC | 2026-05-14 | General construction | 11 MADISON AVENUE | INTERIOR NON-STRUCTURAL DEMOLITION OF EXISTING OFFICE TENANT FIT-OUT. SCOPE OF WORK INCLUDES REMOVAL OF EXISTING NON-LOAD-BEARING PARTITIONS, CEILINGS, FINISHES, AND PARTIAL DEMO O | $371,046 |
| M01381830-S1-MS | 2026-05-13 | Mechanical / HVAC | 387 PARK AVENUE SOUTH | MECHANICAL MODIFICATIONS AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $72,500 |
| M01381830-I1-GC | 2026-05-13 | General construction | 387 PARK AVENUE SOUTH | PARTIAL FLOOR INTERIOR ALTERATION. REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS AND FINISHES. INSTALLATION OF NEWNON-LOAD BEARING PARTITIONS, CEILINGS, FINISHES AND MILLWORK.WO | $861,400 |
| M01378092-S1-MS | 2026-05-08 | Mechanical / HVAC | 520 FIFTH AVENUE | Modification to existing Mechanical System as per plans filed herewith. No change in use, egress or occupancy under this application. | $175,000 |
| M01378092-I1-GC | 2026-05-08 | General construction | 520 FIFTH AVENUE | REMOVAL AND INSTILLATION OF INTERIOR NON LOAD BEARING PARTITIONS AND RELATED FINISHES. FILED IN CONJUCTION WITH NEW BUILDING APPLICATION 121209192. MPP 47. | $380,000 |
| M01375330-I1-GC | 2026-04-28 | General construction | 885 2 AVENUE | THE SCOPE OF THIS PROJECT IS INTERIOR BUILD-OUT OF TENANT SPACE INCLUDING DEMO OF EXISTING CONSTRUCTION, NEW CONSTRUCTION AND INSTALLATION OF PARTITIONS, FLOOR AND WALL FINISHES, D | $206,640 |
| M01375330-S1-MS | 2026-04-28 | Mechanical / HVAC | 885 2 AVENUE | REMOVAL AND INSTALLATION OF DUCTWORK ,DIFFUSERS ,FANS AND RELATED MECHANICAL PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $0 |
| M01380724-I1-GC | 2026-04-28 | General construction | 520 MADISON AVENUE | Removal of interior non-load bearing partitions, doors, flooring and installation of a new interior partitions and door. Ceiling patching and electrical relocations as required. No | $120,960 |
| M01384763-S1-MS | 2026-04-27 | Mechanical / HVAC | 401 WEST 31 STREET | Mechanical work as shown on plans filed herewith. | $0 |
| M01384763-I1-GC | 2026-04-27 | General construction | 401 WEST 31 STREET | General construction as shown on plans filed herewith. No change in use, egress, or occupancy. | $1,280,000 |
| M01363803-S2-MS | 2026-04-24 | Mechanical / HVAC | 560 LEXINGTON AVENUE | FILING FOR MECHANICAL WORK ASSOCIATED WITH INTERIOR RENO OF 17TH FLOOR PREBUILT OFFICE SPACE AS PER PLANS. | $296,500 |
| M01363803-I1-GC | 2026-04-24 | General construction | 560 LEXINGTON AVENUE | FILING FOR INTERIOR RENO FOR 17TH FLOOR PREBUILT OFFICE SPACE AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $1,101,174 |
| M01363486-I1-GC | 2026-04-17 | General construction | 285 MADISON AVENUE | GENERAL CONSTRUCTION MODIFICATIONS TAKING IN THE CELLAR, 1ST FLOOR AND ROOF (CELLAR, LOBBY AND ROOF 27TH MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCU | $971,250 |
| M01363486-S1-MS | 2026-04-17 | Mechanical / HVAC | 285 MADISON AVENUE | MECHANICAL MODIFICATIONS TAKING IN THE CELLAR, 1ST FLOOR AND ROOF (CELLAR, LOBBY AND ROOF 27TH MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $81,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
