COMPANY RECORD · NEW YORK, NY
Unity Construction Group — permit history in New York, NY
Unity Construction Group appears on 197 New York permit records from 2019 through 2026, most often general construction (53.3% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 105 | 53.3% |
| Mechanical / HVAC | 92 | 46.7% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 3 |
| 2020 | 17 |
| 2021 | 21 |
| 2022 | 25 |
| 2023 | 21 |
| 2024 | 30 |
| 2025 | 40 |
| 2026 | 40 |
Busiest year on record: 2025, with 40 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Accurate Mech Indstrs Inc | 8 | 2026-05-06 |
| Ami And Associates Inc | 7 | 2026-02-11 |
| Par Plumbing Co., Inc | 4 | 2026-07-02 |
| Soh Par Sprinkler LLC | 3 | 2026-04-07 |
| Donato Plumbing Group Inc | 3 | 2024-11-14 |
| Kg Sprinkler Corp | 3 | 2025-02-12 |
| Sirina Fire Prot Corp | 3 | 2025-08-06 |
| Bedrock Mechanical Inc | 2 | 2026-07-16 |
| Five Borough Fp, Inc | 2 | 2026-05-05 |
| Accurate Mechanical Inc | 2 | 2025-01-10 |
| Lcs Plumbing&Consult Inc | 2 | 2025-01-13 |
| S.B.A. Plumbing Corp | 1 | 2026-05-07 |
18 companies are named alongside Unity Construction Group on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 10 EAST 40 STREET | 2026-08-18 |
| 225 PARK AVENUE SOUTH | 2026-08-14 |
| 233 PARK AVENUE SOUTH | 2026-08-14 |
| 96 SPRING STREET | 2026-08-05 |
| 667 MADISON AVENUE | 2026-07-16 |
| 530 5 AVENUE | 2026-07-16 |
| 107 GREENWICH STREET | 2026-06-22 |
| 315 PARK AVENUE SOUTH | 2026-06-18 |
| 950 3 AVENUE | 2026-06-11 |
| 12 EAST 49 STREET | 2026-05-21 |
| 1700 BROADWAY | 2026-04-30 |
| 237 WEST 42 STREET | 2026-04-27 |
| 510 MADISON AVENUE | 2026-01-22 |
| 275 SEVENTH AVENUE | 2025-12-18 |
50 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,000 to $2,827,646, median $115,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
197 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01434972-I1-MS | 2026-08-18 | Mechanical / HVAC | 10 EAST 40 STREET | Alterations to mechanical system to partial 32nd floor as per plans. No change to use, egress or occupancy. | $245,000 |
| M01394121-I1-GC | 2026-08-14 | General construction | 225 PARK AVENUE SOUTH | Architectural modifications taking place on the 2nd floor as per plans filed herewith. No change in use, egress or occupancy. | $40,000 |
| M01394100-I1-GC | 2026-08-14 | General construction | 233 PARK AVENUE SOUTH | Architectural modifications taking place on 2nd floor as per plans filed herewith. No change in use, egress or occupancy. | $40,000 |
| M01434963-I1-GC | 2026-08-14 | General construction | 10 EAST 40 STREET | Demolition and general construction work in partial 32nd floor as per plans. No change to use, egress or occupancy. | $425,000 |
| M01419247-I1-GC | 2026-08-05 | General construction | 96 SPRING STREET | general construction on 7th floor as per plans filed herewith. no changes in use, egress or occupancy. | $1,707,635 |
| M01419255-I1-MS | 2026-08-05 | Mechanical / HVAC | 96 SPRING STREET | Mechanical modifications on 7th floor as per plans filed herewith. No changes in use, egress or occupancy. | $200,509 |
| M01338866-I1-GC | 2026-08-05 | General construction | 225 PARK AVENUE SOUTH | Architectural modifications taking place on the 18th floor as per plans filed herewith. No change in use, egress or occupancy. | $85,040 |
| M01425277-I1-GC | 2026-07-16 | General construction | 667 MADISON AVENUE | SELECTED REMOVALS AND RECONFIGURATION OF TWO CONFERENCE ROOMS INTO A SMALL CONFERENCE ROOM AND TWO GUEST OFFICES WITH A SHARED LOUNGE. NO CHANGE TO USE, EGRESS OR OCCUPANCY | $100,000 |
| M01395477-I1-GC | 2026-07-16 | General construction | 530 5 AVENUE | LOBBY REMODEL INCLUSIVE OF TEMPORARY PROTECTIONS AND ADA DOOR OPENER INSTALLATION AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $15,000 |
| M01390323-I1-GC | 2026-06-22 | General construction | 233 PARK AVENUE SOUTH | Architectural modifications taking place on the 3rd & 4th floors as per plans filed herewith. No change in use, egress or occupancy. | $85,069 |
| M01390299-I1-GC | 2026-06-22 | General construction | 225 PARK AVENUE SOUTH | Architectural modifications taking place on the 3rd & 4th floors as per plans filed herewith. No change in use, egress or occupancy. | $85,120 |
| M01384071-I1-GC | 2026-06-22 | General construction | 107 GREENWICH STREET | Filing herewith interior renovation of existing 15th floor space as per plans filed herewith. No change in use, egress, or occupancy. | $178,418 |
| M01403615-I1-GC | 2026-06-18 | General construction | 315 PARK AVENUE SOUTH | General construction modifications taking place on the 10th floor as per plans filed herewith. No change in use, egress or occupancy. | $148,700 |
| M01411482-I1-GC | 2026-06-11 | General construction | 950 3 AVENUE | Partial Demolition of an Existing Exterior Deteriorated Storefront Awning & Framing at 1st Floor. No Change to Occupancy, Use or Egress is Proposed | $24,000 |
| M01384103-I1-MS | 2026-06-08 | Mechanical / HVAC | 107 GREENWICH STREET | Filing herewith mechanical work in existing 15th floor space as per plans filed herewith. No change in use, egress, or occupancy. | $38,944 |
| M01347900-I1-GC | 2026-06-01 | General construction | 225 PARK AVENUE SOUTH | Architectural modifications taking place on the 2nd floor as per plans filed herewith. No change in use, egress or occupancy. | $188,640 |
| M01386796-I1-GC | 2026-06-01 | General construction | 225 PARK AVENUE SOUTH | Architectural modifications taking place on the 12th and 13th floors as per plans filed herewith. No change in use, egress or occupancy. | $45,000 |
| M01347914-I1-MS | 2026-06-01 | Mechanical / HVAC | 225 PARK AVENUE SOUTH | Mechanical modifications taking place on the 2nd floor as per plans filed herewith. No change in use, egress or occupancy. | $16,850 |
| M01386820-I1-GC | 2026-06-01 | General construction | 233 PARK AVENUE SOUTH | Architectural modifications taking place on the 12th and 13th floors as per plans filed herewith. No change in use, egress or occupancy. | $45,000 |
| M01386215-I1-GC | 2026-05-21 | General construction | 12 EAST 49 STREET | Construction work on the 41st floor construction (42nd floor marketing) as indicated on drawings. | $294,987 |
| M01386241-I1-MS | 2026-05-14 | Mechanical / HVAC | 12 EAST 49 STREET | Mechanical work on the 41st floor construction (42nd floor marketing) as indicated on drawings. | $39,984 |
| M01379219-S1-MS | 2026-05-05 | Mechanical / HVAC | 950 3 AVENUE | Demo Supplemental A/C Units&Piping, Replace Some Ductwork, Supply Air Diffusers&Return Air Grilles on 14&15 FL, Install A/C Unit, Piping&Ducts for IT Rm on 14 FL, Exhaust Fans&Duct | $118,000 |
| M01379219-I1-GC | 2026-05-05 | General construction | 950 3 AVENUE | Demolition and Construction of Partitions, Doors, Suspended Ceiling, Millwork, Floor & Wall Finishes on the 14th & 15th Floors. No Change to Occupancy, Use or Egress is Proposed | $520,000 |
| M01366046-I1-GC | 2026-05-01 | General construction | 12 EAST 49 STREET | Construction work on the 24th floor construction (25th floor marketing) core bathrooms as indicated on drawings. | $256,000 |
| M01369804-S1-MS | 2026-04-30 | Mechanical / HVAC | 1700 BROADWAY | MECHANICAL SYSTEMS WORK ON THE 32ND & 33RD MARKETING FLOOR (31ST & 32ND CONSTRUCTION FLOOR) AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $100,000 |
| M01366334-I1-MS | 2026-04-29 | Mechanical / HVAC | 12 EAST 49 STREET | Mechanical work on the 31st floor construction (32nd floor marketing) core bathrooms as indicated on drawings. | $22,999 |
| M01369804-I1-GC | 2026-04-29 | General construction | 1700 BROADWAY | INTERIOR RENOVATION OF THE 32ND & 33RD MARKETING FLOOR/31ST & 32ND CONSTRUCTION FLOOR. REMOVAL &INSTALLATION OF WALLS, DOORS, FLOOR FINISHES, AND CEILINGS AS PER PLAN. THE AREA OF | $90,000 |
| M01366305-I1-GC | 2026-04-28 | General construction | 12 EAST 49 STREET | Construction work on the 31st floor construction (32nd floor marketing) core bathrooms as indicated on drawings. | $245,000 |
| M01366062-I1-MS | 2026-04-27 | Mechanical / HVAC | 12 EAST 49 STREET | Mechanical work on the 24th floor construction (25th floor marketing) core bathrooms as indicated on drawings. | $22,999 |
| M01363945-I1-GC | 2026-04-27 | General construction | 237 WEST 42 STREET | General construction alterations at the 1st floor for proposed interior floor level modification; related work as per plans. No proposed change to building use, egress, or occupanc | $120,000 |
| M01234505-I1-GC | 2026-04-01 | General construction | 530 5 AVENUE | 5TH FLOOR DEMO-- PRE-TENANT INTERIOR NON-STRUCTURAL DEMOLITION INCLUSIVE OF PARTITIONS REMOVALS AS PER PLANS FILED. No change to use, egress, or occupancy. | $274,337 |
| M01350845-I1-GC | 2026-03-03 | General construction | 950 3 AVENUE | Installation of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes, Pantry, ADA Restroom and Renovate Existing Men's & Women's Restrooms on 32nd Floor. No Change | $450,000 |
| M01350845-S1-MS | 2026-02-10 | Mechanical / HVAC | 950 3 AVENUE | Install Air Conditioning & Transfer Air Ducts & Grilles, Volume Dampers, Supply Air Diffusers, Return Air Grilles, Exhaust Fans & Ducts & Replace Insulation on Existing H.P. Duct o | $115,000 |
| M01329347-I1-MS | 2026-02-05 | Mechanical / HVAC | 12 EAST 49 STREET | Interior mechanical demolition on the 3rd floor, 23rd floor construction (24th floor marketing) and 24th floor construction (25th floor marketing) as indicated on drawings. | $25,000 |
| M01329338-I1-GC | 2026-02-02 | General construction | 12 EAST 49 STREET | Interior demolition of non load bearing partitions on the 3rd floor, 23rd floor construction (24th floor marketing) and 24th floor construction (25th floor marketing) as indicated | $550,000 |
| M01320693-I1-MS | 2026-01-22 | Mechanical / HVAC | 510 MADISON AVENUE | Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy. | $15,000 |
| M01338622-I1-GC | 2026-01-08 | General construction | 315 PARK AVENUE SOUTH | General construction modifications taking place on the 9th floor as per plans filed herewith. No change in use, egress or occupancy. | $739,950 |
| M01338656-I1-MS | 2026-01-08 | Mechanical / HVAC | 315 PARK AVENUE SOUTH | Mechanical Modifications taking place on the 9th floor as per plans filed herewith. No change in use, egress or occupancy. | $399,964 |
| M01320684-I1-GC | 2026-01-07 | General construction | 510 MADISON AVENUE | Removal of existing ceiling and construction of two walls and new ceiling to divide large pullpen area into three individual multi-purpose offices as shown on drawings. No change | $48,000 |
| M01325148-I1-MS | 2026-01-07 | Mechanical / HVAC | 530 5 AVENUE | 17TH FLOOR MECH TI--Relocation of ductwork and grilles for new office layout. No change to use, egress or occupancy. | $9,950 |
| M01316425-I1-GC | 2025-12-18 | General construction | 950 3 AVENUE | Demolition & Construction of Partitions, Doors, Suspended Ceiling, Millwork, Floor & Wall Finishes on Part of 24th Floor Including Replacement of Pantry. No Change to Occupancy, Us | $126,000 |
| M01302606-S1-MS | 2025-12-18 | Mechanical / HVAC | 275 SEVENTH AVENUE | Mechanical systems alterations on the 7th floor for proposed interior demolition and whitebox of existing commercial tenant space; related work as per plans. | $10,000 |
| M01302606-I1-GC | 2025-11-20 | General construction | 275 SEVENTH AVENUE | General construction alterations on the 7th floor for proposed interior demolition and whitebox of existing commercial space; related work as per plans. No proposed change in build | $501,750 |
| M01289774-I1-GC | 2025-10-28 | General construction | 275 SEVENTH AVENUE | General construction alterations on the 1st floor for proposed commercial tenant renovations; related work as per plans. No proposed change in building use, egress, or occupancy. | $22,500 |
| M01294345-I1-GC | 2025-10-27 | General construction | 950 3 AVENUE | Demolition and Construction of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes on 23rd Floor Including Replace Existing Pantry and Renovation of Existing Men' | $310,000 |
| M01294345-S1-MS | 2025-10-27 | Mechanical / HVAC | 950 3 AVENUE | Demo. & Install A/C & Toilet Exhaust Ducts, Supply Air Diffusers, Exhaust & Return Grilles, H.P. Duct Insulation on Part 23rd Fl. and Install Exhaust Fan & Duct, Relocate Exist. Ca | $60,000 |
| M01201780-I1-MS | 2025-10-22 | Mechanical / HVAC | 225 PARK AVENUE SOUTH | Modifications to the existing HVAC system on the 2nd floor (AC Filing) as per plans. No change to use, egress or occupancy | $50,000 |
| M01285543-I1-GC | 2025-10-20 | General construction | 885 2 AVENUE | NEW 1 HOUR RATED BOILER ROOM ON MODIFIED EQUIPMENT PLATFORM. DEMOLITION OF EXISTING AND INSTALLATIONOF NEW STOREFRONT AREAS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $25,000 |
| M01285543-S1-MS | 2025-10-20 | Mechanical / HVAC | 885 2 AVENUE | FILING FOR INSTALLATION OF HEAT EXCHANGER PLANT, BOILERS, AND PUMPS TO PROVIDE A HEAT PUMP LOOP TO THE SPACE. INSTALLATION OF NEW WATER SOURCE HEAT PUMPS AND PIPING. NO CHANGE TO U | $500,000 |
| M01293163-I1-MS | 2025-10-16 | Mechanical / HVAC | 510 MADISON AVENUE | Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy. | $18,900 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
