COMPANY RECORD · NEW YORK, NY
Plaza Construction LLC — permit history in New York, NY
Plaza Construction LLC appears on 122 New York permit records from 2019 through 2026, most often general construction (54.9% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 67 | 54.9% |
| Mechanical / HVAC | 55 | 45.1% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 4 |
| 2020 | 9 |
| 2021 | 22 |
| 2022 | 18 |
| 2023 | 24 |
| 2024 | 21 |
| 2025 | 20 |
| 2026 | 4 |
Busiest year on record: 2023, with 24 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Armon Mechanical Inc | 4 | 2026-01-27 |
| Five Boro Associates Inc | 3 | 2026-01-09 |
| Aspro Plumbing Inc | 3 | 2025-03-19 |
| Bedrock Mechanical Inc | 3 | 2025-08-08 |
| Bedrock Plbg. & Htg., Inc | 3 | 2024-12-19 |
| Metro Fire Protection Inc | 2 | 2025-07-17 |
| Tristate Air Conditioning | 2 | 2025-08-07 |
| Skh Mechanical Corp | 2 | 2024-06-26 |
| S.B.A. Plumbing Corp | 2 | 2024-06-27 |
| Par Plumbing Co., Inc | 2 | 2025-10-31 |
| A + Sprinkler Corp | 2 | 2024-03-26 |
| Affect Build LLC | 2 | 2026-01-12 |
20 companies are named alongside Plaza Construction LLC on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1466 BROADWAY | 2026-08-12 |
| 146-50 REEVES AVENUE | 2026-07-08 |
| 126 EAST 57 STREET | 2026-02-20 |
| 500 5 AVENUE | 2026-01-05 |
| 55 WATER STREET | 2025-12-09 |
| 360 LEXINGTON AVENUE | 2025-10-16 |
| 6 TIMES SQUARE | 2025-10-02 |
| 300 LAFAYETTE STREET | 2025-08-11 |
| 250 BROADWAY | 2025-05-06 |
| 1605 BROADWAY | 2025-03-25 |
| 1700 BROADWAY | 2024-12-17 |
| 485 LEXINGTON AVENUE | 2024-10-09 |
| 126 East 57th ST | 2024-06-14 |
| 299 PARK AVENUE | 2024-04-26 |
35 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $9,248,485, median $167,125. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
122 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01404712-I1-GC | 2026-08-12 | General construction | 1466 BROADWAY | INSTALLATION OF (3) ALUMINUM LOUVERS WITHIN EXISTING STOREFRONT AS SHOWN ON DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $5,000 |
| Q00933672-I1-GC | 2026-07-08 | General construction | 146-50 REEVES AVENUE | Herewith filing New School Building | $0 |
| M01335183-I1-GC | 2026-02-20 | General construction | 126 EAST 57 STREET | THIS APPLICATION FILED HEREWITH FOR A TEMPORARY USE PERMIT FOR MODEL APARTMENTS ON THE 7TH FLOOR PURSUANT TO SECTION AC 28-111 AND BUILDINGS BULLETIN 2010-002. NO CHANGE IN OCCUPAN | $1,000 |
| M01052473-S1-MS | 2026-01-05 | Mechanical / HVAC | 500 5 AVENUE | Mechanical scope associated with the renovation of the office space on the 34C/35M floor. No change of use, egress, or occupancy. | $115,000 |
| M01310344-I1-GC | 2025-12-09 | General construction | 55 WATER STREET | Removal and replacement of pavers at 3rd floor plaza and exterior stairs leading up at 1st-3rd. | $2,271,500 |
| M01291646-I1-GC | 2025-11-10 | General construction | 55 WATER STREET | Interior removals of ceilings, partitions and finishes throughout the floor. Core and shell to remain | $385,000 |
| M01291661-I1-MS | 2025-11-06 | Mechanical / HVAC | 55 WATER STREET | Removals of ductwork, mechanical units and associated piping throughout the floor. Supply/return to be cut and capped at core. | $31,000 |
| Q00933672-S8-GC-CX | 2025-11-03 | General construction | 146-50 REEVES AVENUE | Herewith filing Exterior OT/EA for New School Building - filed in conjunction with Q00941176-I1 | $0 |
| M01149145-S1-MS | 2025-10-16 | Mechanical / HVAC | 360 LEXINGTON AVENUE | Mechanical work related to minor partition work to Whitebox 14th floor office space. No change to use, egress or occupancy. | $75,000 |
| M01155799-S1-MS | 2025-10-02 | Mechanical / HVAC | 6 TIMES SQUARE | PROPOSED NEW RESTAURANT WITH MECHANICAL WORK ON CELLAR, 1ST FLOOR AND MEZZANINE.INSTALL NEW HOOD AND EXHAUST SYSTEM IN COMMERCIAL KITCHEN. INSTALL HAVC SYSTEMS. FIRE SUPPRESSION AP | $1,850,000 |
| M01155799-I1-GC | 2025-09-19 | General construction | 6 TIMES SQUARE | PROPOSED NEW RESTAURANT WITH PARTITION WORK AT CELLAR, 1ST FLOOR, MEZZANINE. INSTALL NEW HOODS AND EXHAUST SYSTEM IN COMMERCIAL KITCHEN. INSTALL NEW HVAC SYSTEM. NO CHANGE IN USE | $2,600,000 |
| M01245744-S1-MS | 2025-08-29 | Mechanical / HVAC | 360 LEXINGTON AVENUE | Mechanical work related to minor partition work to Whitebox 9th floor office space. No change to use, egress or occupancy. | $45,000 |
| M01245744-I1-GC | 2025-08-28 | General construction | 360 LEXINGTON AVENUE | Interior office renovation at the 9th floor, No change to use, egress or occupancy. | $45,000 |
| M01166236-I1-GC | 2025-08-11 | General construction | 300 LAFAYETTE STREET | Applicaiton filed for renovation of tenant space A. New demising partitions. | $51,000 |
| M01000872-I1-GC | 2025-05-06 | General construction | 250 BROADWAY | removal and installation of non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application. | $240,860 |
| M01000886-I1-MS | 2025-05-06 | Mechanical / HVAC | 250 BROADWAY | HVAC modification as per plans filed herewith. no changes to use, egress or occupancy under this application. | $35,000 |
| M00952160-I1-GC | 2025-04-17 | General construction | 250 BROADWAY | Removal and installation of non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application. | $1,049,427 |
| M01006644-I1-MS | 2025-04-17 | Mechanical / HVAC | 250 BROADWAY | HVAC modification as per plans filed herewith. no changes to use, egress or occupancy under this application. | $150,000 |
| M01193917-I1-GC | 2025-04-17 | General construction | 360 LEXINGTON AVENUE | Non-structural demolition at 4th floor. No change to Use, Egress or Occupancy. | $50,000 |
| M01193917-S1-MS | 2025-04-17 | Mechanical / HVAC | 360 LEXINGTON AVENUE | Mechanical Systems work in conjunction with non-structural demolition at 4th floor, for new commercial tenant. No change to Use, Egress or Occupancy. | $40,000 |
| M01149145-I1-GC | 2025-04-11 | General construction | 360 LEXINGTON AVENUE | Minor partition work to Whitebox 14th floor office space. No change to use, egress or occupancy. | $50,000 |
| M01085346-S3-MS | 2025-03-25 | Mechanical / HVAC | 1605 BROADWAY | DEMOLISH EXISTING ROOF MOUNTED AIR HANDLING UNIT WITH ASSOCIATED CONTROLS AND PIPING., EXISTING BRANCH DUCTWORK AND ASSOCIATED AIR OULTETS IN AREA OF WORK. FURNISH AND INSTALL NEW | $75,000 |
| M01085346-I1-GC | 2025-01-14 | General construction | 1605 BROADWAY | PROPOSED WORK ON CONST. FLRS 14(15TH MARKET) & CONST. FLRS 16 TO 28 (FLRS 16-29 MARKET), MINIMAL REMOVAL & CONSTRUCTION OF INTERIOR NON-BEARING PARTITIONS, DROPPED CEILINGS IN GUES | $8,000,000 |
| M01085346-S2-GC | 2025-01-14 | General construction | 1605 BROADWAY | Energy Analysis filed in conjunction with const. application # M01085346-l1 | $1,000 |
| M01106015-S1-MS | 2024-12-17 | Mechanical / HVAC | 1700 BROADWAY | NEW MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $256,000 |
| M01106015-I1-GC | 2024-12-12 | General construction | 1700 BROADWAY | FILED HEREWITH NEW PARTITIONS FOR OFFICE SPACE AS PER PLANS FILED ON THE 41ST FLOOR(40TH CONSTRUCTION FLOOR). NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $12,000 |
| M01084926-I1-GC | 2024-12-11 | General construction | 1605 BROADWAY | Removal and construction of interior non-bearing partitions and related finishes for Guestrooms construction floors (29-46), marketing floors (29-46) per plans filed. | $9,248,485 |
| M01099539-S1-MS | 2024-12-11 | Mechanical / HVAC | 1605 BROADWAY | Mechanical demolition, modifications and upgrades related to Public Spaces (1fl, 2fl) per plans filed. | $100,000 |
| M01088524-I1-GC | 2024-12-11 | General construction | 1605 BROADWAY | Exterior alterations of existing J-1 Hotel, installation of cosmetic finishes at building exterior per plans filed. | $2,200,000 |
| M01104149-I1-GC | 2024-11-15 | General construction | 300 LAFAYETTE STREET | Applicaiton filed for general construction related to new stair and elevator for tenant spaces B & C | $2,000,000 |
| M01120000-I1-GC | 2024-11-08 | General construction | 250 BROADWAY | Installation of non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application. | $700,036 |
| M01084926-S4-GC | 2024-11-07 | General construction | 1605 BROADWAY | Energy Analysis filed in conjunction with const. application # M01084926-l1 | $1,000 |
| M01099539-I1-GC | 2024-11-07 | General construction | 1605 BROADWAY | Interior demolition and construction of non-load bearing partitions, hung ceilings, and related finishes as per drawings filed herewith. | $4,750,000 |
| M01088265-I1-GC | 2024-11-07 | General construction | 1605 BROADWAY | Removal of interior partitions on 2nd floor. | $175,000 |
| M01105141-I1-MS | 2024-10-09 | Mechanical / HVAC | 485 LEXINGTON AVENUE | Modifications to the existing HVAC system on the 25th floor (Monjasa) as per plans. No change to use, egress or occupancy. | $79,994 |
| M01104627-I1-GC | 2024-10-07 | General construction | 485 LEXINGTON AVENUE | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 25th floor (Monjasa) as per plans. No change to use, egress or occupancy. | $295,984 |
| M01044256-I1-MS | 2024-06-28 | Mechanical / HVAC | 485 LEXINGTON AVENUE | Modifications to the existing HVAC system on the 17th floor (Risk Strategies) as per plans. No change to use, egress or occupancy. | $439,874 |
| M01052473-I1-GC | 2024-06-24 | General construction | 500 5 AVENUE | Architectural scope associated with the interior renovation of the 2 tenants' office space on the 34C/35M floor. No change of use, egress, or occupancy. | $225,000 |
| M01044220-I1-GC | 2024-06-24 | General construction | 485 LEXINGTON AVENUE | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 17th Floor (Risk Strategies) as per plans. No change to use, egress or occupancy | $779,916 |
| M00556884-S3-MS | 2024-06-14 | Mechanical / HVAC | 126 East 57th ST | HEREWITH FILING ASSOCIATEDMECHANICAL SYSTEMSIN CONJUNCTION WITH 28 STORY NEW BUIILDING | $1,000 |
| M01029824-I1-GC | 2024-04-26 | General construction | 299 PARK AVENUE | Modifications to existing interior lighting scope as per plans filed herewith | $70,883 |
| M00987202-I1-GC | 2024-04-02 | General construction | 126 East 57th ST | Installation and maintenance of temporary structures as per plan, in conjunction with new building job# M00556884-I1. No change in use, occupancy or egress. This temp office will b | $10,000 |
| M08031337-I1-MS | 2024-01-11 | Mechanical / HVAC | 123 WEST 125 STREET | MECHANICAL MODIFICATIONS AND INSTALLATIONS FOR RETAIL BUILD-OUT. INSTALLATION OF REFRIGERATION SYSTEM AS PER PLANS. | $1,400,000 |
| M08031311-I1-GC | 2024-01-11 | General construction | 123 WEST 125 STREET | General construction inclusive of interior partitions for retail build-out as per plans filed herewith. No change in use, egress, or occupancy. | $5,000,000 |
| M00978769-I1-GC | 2024-01-04 | General construction | 60 BROAD STREET | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 34TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPAN | $265,375 |
| M00914375-I1-GC | 2023-12-22 | General construction | 25 BEAVER STREET | Interior renovations consisting of partitions and finishes as per plans filed herewith. No change to use, egress or occupancy. | $101,400 |
| M08022784-S1-MS | 2023-12-07 | Mechanical / HVAC | 17 BATTERY PLACE | Mechanical work associated with conversion of 10th-13th floors to residential use. | $1,219,053 |
| M00873843-I1-GC | 2023-12-01 | General construction | 36 CENTRAL PARK SOUTH | Temporary canopy structure filed herewith in order to obtain a Temporary Use Permit for seasonal enclosure. | $1,000 |
| M00901954-I1-GC | 2023-11-30 | General construction | 1605 BROADWAY | Renovate two (2) existing Hotel Model Rooms, minor removal and patching of partitions per plans filed herewith. | $75,000 |
| Q00951871-I1-MS | 2023-11-16 | Mechanical / HVAC | 58-18 37 AVENUE | APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR AND ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $90,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
