COMPANY RECORD · NEW YORK, NY
City/Suburban Plbg Corp — permit history in New York, NY
City/Suburban Plbg Corp appears on 250 New York permit records from 2019 through 2026, most often plumbing (87.4% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 250 | 87.4% |
| Fire protection | 36 | 12.6% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 19 |
| 2020 | 47 |
| 2021 | 35 |
| 2022 | 48 |
| 2023 | 40 |
| 2024 | 39 |
| 2025 | 41 |
| 2026 | 17 |
Busiest year on record: 2022, with 48 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Tri-Star Construction Cor | 45 | 2026-06-30 |
| Yorke Construction Corp | 14 | 2026-08-07 |
| J And R Campo Constr Inc | 4 | 2023-01-11 |
| Liebhaber Company Inc | 2 | 2025-01-08 |
| William Stanislawczyk | 2 | 2024-05-16 |
| A.W. & S. Construction Co | 1 | 2024-10-22 |
| Arol Management LLC | 1 | 2023-05-03 |
| Cliffco Construction Inc | 1 | 2024-03-04 |
| Consigli Construction Co | 1 | 2026-03-20 |
| Kaback Service, Inc | 1 | 2025-06-25 |
| L&K Partners, Inc | 1 | 2025-12-04 |
| Remi Interiors Inc | 1 | 2026-05-13 |
14 companies are named alongside City/Suburban Plbg Corp on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 66 WEST 12 STREET | 2026-08-07 |
| 650 FIFTH AVENUE | 2026-07-28 |
| 375 PARK AVENUE | 2026-06-30 |
| 1212 6 AVENUE | 2026-06-09 |
| 17 STATE STREET | 2026-05-13 |
| 529 FIFTH AVENUE | 2026-04-27 |
| 360 MADISON AVENUE | 2026-04-22 |
| 42 WEST 44 STREET | 2026-03-31 |
| 1 PROSPECT PARK WEST | 2026-03-20 |
| 1411 BROADWAY | 2026-01-22 |
| 2955 VETERANS ROAD WEST | 2025-12-31 |
| 477 MADISON AVENUE | 2025-12-19 |
| 825 THIRD AVENUE | 2025-12-17 |
| 595 MADISON AVENUE | 2025-12-12 |
123 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,000 to $1,500,000, median $40,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
250 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01118891-S3-PL | 2026-08-07 | Plumbing | 66 WEST 12 STREET | Modifications to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy. | $47,299 |
| M01424491-I1-PL | 2026-07-28 | Plumbing | 650 FIFTH AVENUE | Modification to the existing plumbing system on the 32nd floor as per plans. No change to use, egress or occupancy | $59,976 |
| M01424122-I1-PL | 2026-07-28 | Plumbing | 650 FIFTH AVENUE | Removal of existing plumbing fixtures on the 31st floor as per plans. No change to use, egress or occupancy | $5,236 |
| M01393973-S2-PL | 2026-06-30 | Plumbing | 375 PARK AVENUE | REMOVAL OF PLUMBING FIXTURES AND ASSOCIATED PIPING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $7,200 |
| M01390286-S2-PL | 2026-06-09 | Plumbing | 1212 6 AVENUE | REMOVAL AND INSTALLATION OF PLUMING FIXTURE AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,000 |
| M01363730-S2-PL | 2026-05-14 | Plumbing | 375 PARK AVENUE | INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING ON 27TH FLOOR OFFICE SPACE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $22,770 |
| M01391110-S2-PL | 2026-05-13 | Plumbing | 17 STATE STREET | INSTALLATION OF NEW PLUMBING FIXTURES ON 16TH FLOOR OFFICE SPACE PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY | $44,500 |
| M01341176-S2-PL | 2026-04-27 | Plumbing | 529 FIFTH AVENUE | FILING FOR PLUMBING AND SPRINKLER WORK FOR OFFICE RENOVATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $39,338 |
| M01341176-S2-PL | 2026-04-27 | Fire protection | 529 FIFTH AVENUE | FILING FOR PLUMBING AND SPRINKLER WORK FOR OFFICE RENOVATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $39,338 |
| M01374912-S1-PL | 2026-04-22 | Plumbing | 360 MADISON AVENUE | REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND RELATED PLUNBMING PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $11,000 |
| M01328914-S6-PL | 2026-04-01 | Plumbing | 375 PARK AVENUE | REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR THE 8TH FLOOR OFFICE SPACE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $344,160 |
| M01286091-I1-PL | 2026-03-31 | Plumbing | 42 WEST 44 STREET | MODIFICATION TO EXISTING PLUMING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY/ | $47,250 |
| B01284430-S2-PL | 2026-03-20 | Plumbing | 1 PROSPECT PARK WEST | HEREWITH FILING PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY | $233,628 |
| M01331225-S6-PL | 2026-03-11 | Plumbing | 375 PARK AVENUE | INSTALLATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR THE 20TH FLOOR OFFICE SPACE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $136,000 |
| M01328914-S2-PL | 2026-02-04 | Plumbing | 375 PARK AVENUE | REMOVAL OF PLUMBING FIXTURES AND RELATED PIPING ON THE 8TH FLOOR OFFICE SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $25,000 |
| M01331836-S3-PL | 2026-01-22 | Plumbing | 1411 BROADWAY | interior plumbing work on 26th and 27th floors as shown herewith. | $40,000 |
| M01312635-S2-PL | 2026-01-20 | Plumbing | 17 STATE STREET | INSTALLATION OF NEW PLUMBING FIXTURES ON 19TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $7,000 |
| S01297783-I1-PL | 2025-12-31 | Plumbing | 2955 VETERANS ROAD WEST | Filling for approval of PL work type in conjunction with GC application S01297776-I1 | $30,000 |
| M01312597-S2-PL | 2025-12-19 | Plumbing | 477 MADISON AVENUE | REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING ON THE 9TH OFFICE SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $352,000 |
| M01282231-I1-PL | 2025-12-17 | Plumbing | 825 THIRD AVENUE | Plumbing work for Tokio HCC on 24th marketing floor (23rd construction) | $34,975 |
| M01294521-I1-PL | 2025-12-12 | Plumbing | 595 MADISON AVENUE | Plumbing work on part of the 23rd floor (Markets Group) as indicated on drawings. | $22,840 |
| M01291629-S2-PL | 2025-12-04 | Plumbing | 180 VARICK STREET | NYU LANGONE - 180 VARICK STREET RESTORATION - INTERIOR DEMO PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $88,000 |
| M01237010-S2-PL | 2025-10-28 | Plumbing | 17 STATE STREET | REMOVAL AND INSTALLATION OF PLUMBING FIXTURES 26TH FLOOR OFFICE SPACE AS PER PLANS. NO CHANGE IN OCCUPANCY USE OR EGRESS | $58,832 |
| B01201988-S2-PL | 2025-10-28 | Plumbing | 50 MORGAN AVENUE | Herewith filing for related PL removals and installation for tenant build out. | $160,055 |
| M01261827-I1-PL | 2025-10-21 | Plumbing | 452 FIFTH AVENUE | Modifications to plumbing, sprinkler, and standpipe as per plans filed herewith. No change in use, egress, or occupancy. | $1,500,000 |
| M01261827-I1-PL | 2025-10-21 | Fire protection | 452 FIFTH AVENUE | Modifications to plumbing, sprinkler, and standpipe as per plans filed herewith. No change in use, egress, or occupancy. | $1,500,000 |
| M01276066-I1-PL | 2025-10-08 | Plumbing | 12 EAST 49 STREET | Plumbing work on the 35th floor construction (36th floor marketing/tenant) as indicated on drawings. | $30,000 |
| M01249003-I1-PL | 2025-09-22 | Plumbing | 375 PARK AVENUE | MODIFICATIONS TO EXISTING plumbing fixtures & SPRINKLER SYSTEM on floors 17-19. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $965,000 |
| M01249003-I1-PL | 2025-09-22 | Fire protection | 375 PARK AVENUE | MODIFICATIONS TO EXISTING plumbing fixtures & SPRINKLER SYSTEM on floors 17-19. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $965,000 |
| B01219817-I1-PL | 2025-09-17 | Fire protection | 4 METROTECH | Sprinkler/plumbing modifications as shown on plans | $226,576 |
| B01219817-I1-PL | 2025-09-17 | Plumbing | 4 METROTECH | Sprinkler/plumbing modifications as shown on plans | $226,576 |
| M01255885-S2-PL | 2025-09-12 | Plumbing | 17 STATE STREET | INSTALLATION OF NEW PANTRIES ON 10TH FLOOR OFFICE SPACE AS PER PLANS. NO CHANGE IN OCCUPANCY USE OR EGRESS | $46,000 |
| M01171193-S2-PL | 2025-09-12 | Plumbing | 1745 BROADWAY | OFFICE RENOVATION (TAGWALL) WORK TO INCLUDE PLUMBING MODIFICATIONS AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $100,000 |
| M01256291-S2-PL | 2025-08-18 | Plumbing | 777 3 AVENUE | INSTALL 1 DRINKING FOUNTAIN, 2 SINKS, 3 FUNNEL DRAINS, 1 LAV, 1 WC, 1 WATER PIPING & 1 SANITARY PIPING. | $50,000 |
| M01217943-S3-PL | 2025-08-14 | Plumbing | 17 STATE STREET | INSTALLATION OF NEW PANTRIES ON THE 23RD FLOOR OFFICE SPACE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $18,500 |
| M01253804-I1-PL | 2025-08-04 | Plumbing | 745 FIFTH AVENUE | Removal of existing plumbing fixtures and associated piping on the 6th floors (Demo) as per plans. No change to use, egress or occupancy. | $4,500 |
| M01214892-I1-PL | 2025-07-29 | Plumbing | 595 MADISON AVENUE | Plumbing work on the 34th floor (Grossman) as indicated on drawings. | $38,390 |
| M01238396-S2-PL | 2025-07-29 | Plumbing | 17 STATE STREET | REMOVAL OF PLUMBING FIXTURES AND ASSOCIATED PIPING ON 34TH FLOOR OFFICE SPACE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $7,690 |
| B01200309-S2-PL | 2025-07-25 | Plumbing | 153 PIERREPONT STREET | Filing for minor plumbing and sprinkler modifications as per the plans submitted. No change to egress, use, or egress. | $58,000 |
| B01200309-S2-PL | 2025-07-25 | Fire protection | 153 PIERREPONT STREET | Filing for minor plumbing and sprinkler modifications as per the plans submitted. No change to egress, use, or egress. | $58,000 |
| M01253843-I1-PL | 2025-07-22 | Plumbing | 745 FIFTH AVENUE | Removal of existing plumbing fixtures and associated piping on the 17th and 24th floors (Demo) as per plans. No change to use, egress or occupancy. | $8,500 |
| M01243480-I1-PL | 2025-07-18 | Plumbing | 595 MADISON AVENUE | Plumbing work on the 12th floor (Atria turnkey) as indicated on drawings | $19,950 |
| M01234984-S2-PL | 2025-07-14 | Plumbing | 477 MADISON AVENUE | REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $339,835 |
| M01222282-S1-PL | 2025-06-25 | Plumbing | 345 EAST 52 STREET | PL ALT FILED FOR CAP & REMOVAL OF 1 kitchen This application supersedes and finalizes a combination of apartment #1A and 1K approved and permitted under Pre-B.I.S ALT # 1394-88 wh | $5,000 |
| M01228015-S2-PL | 2025-06-11 | Plumbing | 477 MADISON AVENUE | REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $72,000 |
| M01110881-I1-PL | 2025-06-09 | Plumbing | 375 HUDSON STREET | Modifications to the Plumbing System: Install new fixtures: (4) Floor drains, (2) Funnel drain, (2) HWH, (1) WC, (1) Lav, (1) sink, (1) DW, (2) WD, (2) CM, (1) ref w/ IM and associ | $68,460 |
| M01111417-I1-PL | 2025-06-09 | Plumbing | 375 HUDSON STREET | Install new fixtures: (2) sinks, (2) DW, (2) WD, (2) CM, (1) refrigerator w/ IM, (3) HWH, (2) Funnel drain, (4) Floor drain, (1) WC, (1) Lavatory and associated CW/sanitary piping | $86,740 |
| M01202133-S2-PL | 2025-05-19 | Plumbing | 375 PARK AVENUE | REMOVAL OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR 17TH, 18TH AND 19TH FLOOR AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $18,000 |
| M01196008-S2-PL | 2025-05-19 | Plumbing | 17 STATE STREET | REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING ON 20TH FLOOR OFFICE SPACE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $63,082 |
| M00972936-S5-PL | 2025-04-24 | Plumbing | 134 WEST 18 STREET | REMOVE AND INSTALL PLUMBING FIXTURES. INSTALL NEW RPZ AND 6 COMBINED WATER SERVICE. INSTALL NEW SPRINKLER HEADS AND FIRE DEPARTMENT CONNECTION. WORK ON FLOORS 01-03 & ROOF. FILED I | $524,350 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
