COMPANY RECORD · NEW YORK, NY

Kaback Service, Inc — permit history in New York, NY

Kaback Service, Inc appears on 56 New York permit records from 2021 through 2026, most often mechanical / hvac (98.2% of the record).

Permit categories

CategoryPermitsShare
Mechanical / HVAC5598.2%
General construction11.8%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20211
20225
20239
202417
202514
202610

Busiest year on record: 2024, with 17 permits. One project can account for several filings, so read this as filing activity rather than workload.

Named on the same permit

Name in sourceLinked permitsLast seen
City/Suburban Plbg Corp12025-06-25

1 companies are named alongside Kaback Service, Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
1818 VICTORY BOULEVARD2026-07-07
1470 2 AVENUE2026-06-03
41 WEST 25 STREET2026-05-28
640 PELHAM PARKWAY SOUTH2026-05-21
3755 EAST TREMONT AVENUE2026-05-06
70-05 NORTHERN BOULEVARD2026-04-24
1104 AVENUE J2026-04-15
166-05 ROCKAWAY BOULEVARD2026-03-26
196-41 NORTHERN BOULEVARD2026-02-18
73 GANSEVOORT STREET2026-01-29
120 WALL STREET2025-12-30
469 7 AVENUE2025-12-29
582 9 AVENUE2025-11-25
41-01 QUEENS BOULEVARD2025-11-06

55 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $5,000 to $1,373,878, median $95,500. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

56 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
S01365228-I1-MS2026-07-07Mechanical / HVAC1818 VICTORY BOULEVARDDIRECT REPLACEMENT OF THREE (3) 5-TON AND ONE (1) 3.5-TON SPLIT HVAC SYSTEMS, INCLUDING NEW ROOFTOP CONDENSING UNITS ON STEEL ROOF RAILS AND INDOOR FURNACE/AIR HANDLER UNITS. RECON$80,000
M01383440-I1-MS2026-06-03Mechanical / HVAC1470 2 AVENUEINSTALLATION OF TWO NEW 4-TON AIR-COOLED SPLIT SYSTEMS WITH OUTDOOR CONDENSING UNITS ON NEW STEEL ROOF RAILS AND CEILING RECESSED INDOOR CASSETTES. RUN NEW REFRIGERANT PIPING THROU$97,000
M01391645-S2-MS2026-05-28Mechanical / HVAC41 WEST 25 STREETmodification of existing a/c system$46,000
X01383341-I1-MS2026-05-21Mechanical / HVAC640 PELHAM PARKWAY SOUTHDIRECT REPLACEMENT OF ONE 10-TON, TWO 7.5-TON, AND ONE 5-TON AIR-COOLED ROOFTOP PACKAGED UNITS ON EXISTING ROOF CURBS. RECONNECT TO EXISTING SUPPLY/RETURN DUCT RISERS AND GAS LINES$90,000
X01365235-I1-MS2026-05-06Mechanical / HVAC3755 EAST TREMONT AVENUEDIRECT REPLACEMENT OF ONE 4-TON, ONE 6-TON, ONE 8-TON, AND ONE 10-TON AIR-COOLED ROOFTOP PACKAGED UNIT ON EXISTING ROOF CURBS. RECONNECT EXISTING GAS PIPING TO NEW ROOFTOP UNITS BY$85,000
Q01360989-I1-MS2026-04-24Mechanical / HVAC70-05 NORTHERN BOULEVARDDIRECT REPLACEMENT OF THREE 5-TON AND ONE 2-TON SPLIT SYSTEMS WITH NEW ROOFTOP CONDENSING UNITS, THREE GAS FURNACE BLOWERS WITH DX COILS, AND ONE AIR HANDLER. RECONNECT TO EXISTING$80,000
B01343772-I1-MS2026-04-15Mechanical / HVAC1104 AVENUE JREPLACEMENT OF [4] ROOFTOP UNITS ON THE ROOF OF AN EXISITING 1 STORY COMMERCIAL BUILDING.$174,240
Q01342291-I1-MS2026-03-26Mechanical / HVAC166-05 ROCKAWAY BOULEVARDREPLACEMENT OF [2] 20TON ROOF UNITS ON THE ROOF OF AN EXISITING 1 STORY COMMERCIAL BUILDING$150,000
Q00786278-I1-MS2026-02-18Mechanical / HVAC196-41 NORTHERN BOULEVARDMechanical work associated with the direct replacement of existing AC roof and gas furnace on 1st floor as indicated on drawings.$104,747
M01326331-S2-MS2026-01-29Mechanical / HVAC73 GANSEVOORT STREETRelocation of AC Duct as indicated on plans. Provide two electric air curtains$59,440
M01326432-I1-MS2025-12-30Mechanical / HVAC120 WALL STREETREPLACEMENT OF PACKAGED HVAC SYSTEM FOR EYEBANK ON 3RD FLOOR.$100,000
M01216236-I1-MS2025-12-29Mechanical / HVAC469 7 AVENUEREPLACEMENT OF (3) EXISTING WATER-COOLED PACKAGED AC & (1) EXISTING SPLIT-SYSTEM AC WITH (4) NEW AIR-SOURCE HEAT PUMPS FOR EXISTING BANK ON 1ST FL. EXISTING DUCTWORK TO REMAIN. REM$370,000
M01211197-I1-MS2025-11-25Mechanical / HVAC582 9 AVENUEMECHANICAL ALTERATION FOR AN EXISTING COMMERCIAL BANK. REPLACEMENT OF EXISTING (4) AIR-COOLED SPLIT AC SYSTEM ON ROOF AND GROUND FLOOR WITH (4) NEW SPLIT HEAT RECOVERY SYSTEM. NEW $500,000
Q01234188-I1-MS2025-11-06Mechanical / HVAC41-01 QUEENS BOULEVARDREPLACEMENT OF EXISTING HEAT RECOVERY SPLIT-SYSTEM FOR EXISTING COMMERCIAL BANK. EXISTING DUCTWORK DISTRIBUTION TO REMAIN.$175,000
M00754220-I1-MS2025-08-27Mechanical / HVAC269 WEST 16 STREETAPPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR AND ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$68,000
M01211167-I1-MS2025-08-25Mechanical / HVAC2 WALL STREETREPLACEMENT OF (3) EXISTING WATER-SOURCED AC UNITS WITH (3) WATER-SOURCED HEAT PUMPS ON GROUND FLOOR OF EXISTING BANK .EXISTING DUCTWORK, CONDENSER WATER PIPING AND CONDENSATE DRAI$275,000
M01211183-I1-MS2025-07-22Mechanical / HVAC300 WEST 125 STREETREPLACEMENT OF (3) EXISTING WATER-COOLED AC UNITS WITH (3) NEW WATER-SOURCE HEAT PUMPS FOR EXISTING BANK. EXISTING DUCTWORK, CONDENSER WATER PIPING AND DIFFUSERS TO REMAIN UNLESS O$281,000
M01197806-I1-MS2025-06-18Mechanical / HVAC579 5 AVENUEPROPOSED WORK SHALL BE TO DIRECTLY REPLACE (3) EXISTING WATER-SOURCE HEAT PUMP UNITS IN THE BASEMENT AND REPLACE (1) EXISTING COOLING TOWER ON THE ROOF. EXISTING DUCTWORK AND PIPIN$267,298
M01222282-I1-GC2025-06-03General construction345 EAST 52 STREETCombination of Apartment # 1A and 1K on first floor in compliance with TPPN # 3/97, which supersedes and finalizes Pre-B.I.S ALT # 1394-88.$19,995
M01193946-I1-MS2025-05-08Mechanical / HVAC55 WEST 25 STREETMECHANICAL ALTERATION FOR EXISTING BUILDING. SCOPE INCLUDES REPLACEMENT OF EXISTING (2) AIR-COOLED SPLIT-SYSTEM AC WITH (3) SPLIT-SYSTEM HEAT PUMP. EXISTING DISTRIBUTION DUCTWORK A$209,000
M01204688-I1-MS2025-05-05Mechanical / HVAC43 WEST 24 STREETPROPOSED WORK IS TO REPLACE EXISTING SPLIT HVAC SYSTEM WITH NEW SPLIT SYSTEM HEAT PUMPS FOR EXISTING RETAIL SPACE ON 1ST FLOOR.$100,000
M01190462-I1-MS2025-04-01Mechanical / HVAC860 WASHINGTON STREETModification to Mechanical systems as per plans filed herewith.$761,000
M01096401-I1-MS2025-03-04Mechanical / HVAC770 8 AVENUEPROPOSED WORK SHALL INCLUDE THE REPLACEMENT OF (2) WATER-SOURCE HEAT PUMP UNITS. RECONNECT TO EXISTING CONDENSER WATER PIPE WITH NEW INSULATION. PROVIDE NEW CONDENSATE DRAIN PIPE T$96,000
B01120970-I1-MS2025-02-07Mechanical / HVAC269 5 AVENUEDIRECT REPLACEMENT OF (4) NEW SINGLE PACKAGED AIR CONDITIONING UNITS ON ROOF, (1) NEW SPLIT SYSTEM OUTDOOR HEAT PUMP UNIT, AND (1) NEW SPLIT SYSTEM INDOOR HEAT PUMP UNIT IN 1ST FLO$65,700
B00881164-I1-MS2024-12-11Mechanical / HVAC987 4 AVENUETHE PROPOSED WORK IS FOR A DIRECT REPLACEMENT OF (3) NEW SINGLE PACKAGED AIR CONDITIONING UNITS, (1) NEW SPLIT SYSTEM OUTDOOR HEAT PUMP UNIT, AND (1) NEW SPLIT SYSTEM INDOOR HEAT P$75,000
Q01096376-I1-MS2024-12-11Mechanical / HVAC62-66 FRESH POND ROADREPLACEMENT OF EXISTING SPLIT SYSTEMS TO INSTALL NEW SPLIT SYSTEMS INCLUDING: (3) 5-TON CONDENSING UNITS, (1) 3-TON CONDENSING UNIT, AND (4) AIR HANDLING UNITS. EXISTING DUCTS AND $68,000
Q01032743-I1-MS2024-11-22Mechanical / HVAC97-11 ROCKAWAY BOULEVARDIN-KIND REPLACEMENT OF (2) SPLIT SYSTEM HEAT PUMP CONDENSING UNITS AND (11) SPLIT SYSTEM HEAT PUMP AIR HANDLING UNITS. EXISTING ENERGY RECOVERY UNIT TO BE REFURBISHED AND REMAIN. E$125,000
M01091459-I1-MS2024-11-13Mechanical / HVAC110 PEARL STREETPROPOSED WORK SHALL INCLUDE THE REPLACEMENT OF (2) WATER-SOURCE HEAT PUMP UNITS. RECONNECT TO EXISTING CONDENSER WATER PIPE WITH NEW INSULATION. PROVIDE NEW CONDENSATE DRAIN PIPE T$95,000
B00547691-I1-MS2024-11-06Mechanical / HVAC2173 86 STREETDIRECT REPLACEMENT OF ONE (1) 12.5 TON ROOFTOP PACKAGED AIR CONDITIONING UNIT.MOUNT NEW UNIT ON THE EXISTING STEEL FRAME DUNNAGE. RECONNECT TO EXISTING SUPPLY AND RETURN DUCTWORK O$43,750
M01041543-I1-MS2024-09-17Mechanical / HVAC465 GRAND STREETMechanical modifications on Cellar, 1st floor, and roof plans as shown filed herewith. No change in egress, occupancy, or use.$184,500
B00881166-I1-MS2024-08-08Mechanical / HVAC4526 13 AVENUEDIRECT REPLACEMENT OF (3) NEW SINGLE PACKAGED AIR CONDITIONING UNITS, (1) NEW SPLIT SYSTEM OUTDOOR HEAT PUMP UNIT, AND (1) NEW SPLIT SYSTEM INDOOR HEAT PUMP UNIT IN 1ST FLOOR. ALL $100,000
B00881181-I1-MS2024-07-12Mechanical / HVAC2700 CONEY ISLAND AVENUEDIRECT REPLACEMENT OF (1) 3.5-TON SPLIT AC SYSTEM & (3) 5-TON SPLIT AC SYSTEM WITH GAS FURNACE. EXISTING DUCTWORK AND PIPING TO REMAIN.$100,000
M00978628-I1-MS2024-05-21Mechanical / HVAC202 WEST 23 STREETTHE PROPOSED WORK IS FOR A NEW INSTALLATION OF (2) NEW 8-TON HEAT RECOVERY HEAT PUMPS WITH (7) NEW VRF INDOOR AIR HANDLING UNITS.REMOVE EXISTING INDOOR SPLIT AC SYSTEM. EXISTING SU$300,006
M01006958-I1-MS2024-04-30Mechanical / HVAC90 PARK AVENUEREPLACEMENT OF (1) 12 TON WITH (3) 5 TON WATER SOURCE HEAT PUMPS TO RECONNECT TO EXISTING SUPPLY, RETURN AND FRESH AIR INTAKE DUCTWORKS. RECONNECT TO EXISTING CONDENSER WATER PIPES$120,000
M01005818-I1-MS2024-04-23Mechanical / HVAC1995 BROADWAYPROPOSED WORK TO REPLACE EXISTING COOLING TOWER AND INDOOR WATER-COOLED HEAT PUMP SERVING EXISTING BANK. INSTALL NEW DX COOLING SPLIT SYSTEM. EXISTING AIR DISTRIBUTION DUCTWORK TO $400,000
X00878997-I1-MS2024-02-09Mechanical / HVAC640 EAST FORDHAM ROADDIRECT REPLACEMENT OF (1) 3.5-TON SPLIT AC SYSTEM & (3) 5-TON SPLIT AC SYSTEM WITH GAS FURNACE. EXISTING DUCTWORK AND PIPING TO REMAIN.$100,000
Q00879007-I1-MS2024-01-29Mechanical / HVAC7955 METROPOLITAN AVENUEDIRECT REPLACEMENT OF (1) 3.5 TON & (3) 5 TON ROOFTOP CONDENSING UNITS WITH NEW (1) 4 TON & NEW (3) 5 TON ROOFTOP CONDENSING UNITS AND REPLACEMENT OF (1) 3.5 TON & (3) 5 TON INDOOR$85,000
M00929091-I1-MS2024-01-24Mechanical / HVAC451 LEXINGTON AVENUEDIRECT REPLACEMENT OF (5) INDOOR UNITS AND (3) OUTDOOR UNITS. EXISTING DUCTS TO REMAIN. EXISTING PIPING TO BE DEMOLISHED AND REPLACED WITH NEW PIPING IN EXISTING PENETRATION; NO NE$199,000
X00964540-I1-MS2024-01-24Mechanical / HVAC36 WEST FORDHAM ROADModification of mechanical systems in existing McDonald's restaurant, as per plans filed herewith.$42,000
X00959526-I1-MS2024-01-24Mechanical / HVAC86 EAST 167 STREETModification of mechanical systems, as per plans filed herewith. No change in use, egress, or occupancy.$14,000
M00981618-I1-MS2024-01-23Mechanical / HVAC565 5 AVENUEExisting supply & return grille at ceiling level to be removed. existing ac unite in server room to be removed. existing cws&r to be removed. existing ceiling openings to be patche$5,000
M00944020-I1-MS2023-11-15Mechanical / HVAC175 VARICK STREETDIRECT REPLACEMENT & RELOCATION OF (2) 2-TON AIR COOLED SPLIT SYSTEMS INTO TENANT SPACE & REPLACEMENT OF (2) 2-TON SPLIT SYSTEM EVAPORATORS. EXISTING AIR TERMINALS, AND CONDENSATE $20,000
B00928450-I1-MS2023-10-11Mechanical / HVAC1715 BEDFORD AVENUEDIRECT REPLACEMENT OF TWO 8-TON AIR COOLED HEAT RECOVERY SPLIT SSYTEMS AND ONE ENERGY RECOVERY FENTILATOR. NEW OUTDOR CONDENSING UNIT TO EACH BE CONNECTED TO HEAT RECOVERY BOXES AN$109,000
M00929099-I1-MS2023-09-19Mechanical / HVAC40 FULTON STREETDIRECT REPLACEMENT OF (1) 10 TON AND (2) 8 TON AIR COOLED HEAT RECOVERY SPLIT SYSTEMS. ALL SPLIT SYSTEMS CONSIST OF AN OUTDOOR CONDENSING UNIT, HEAT RECOVERY BOXES AND INDOOR CEILI$368,000
M00914635-I1-MS2023-08-31Mechanical / HVAC234 EAST 85 STREETNEW INSTALLATION OF (1) NEW OUTDOOR HEAT PUMP UNIT ON EXISTING 2ND FLOOR EXTERIOR WALL, (2) NEW INDOOR AIR HANDLING CEILING CASSETTES, (1) NEW INDOOR DUCTLESS & WALL-MOUNTED AIR HA$20,000
M00884340-I1-MS2023-08-15Mechanical / HVAC716 MADISON AVENUETHE PROPOSED WORK IS FOR REMOVAL OF EXISTING OUTDOOR HEAT PUMPS ON ROOF FOR EXISTING RETAIL SPACE ON FIRST FLOOR. INSTALL NEW OUTDOOR HEAT PUMP IN REAR COURTYARD. INDOOR UNITS TO R$20,000
M00885014-I1-MS2023-07-13Mechanical / HVAC32 WEST 25 STREETDIRECT REPLACEMENT OF TWO 10-TON AIR COOLED SPLIT SYSTEMS. RECONNECT TO EXISTING SUPPLY AND RETURN DUCTWORK. RE-USE PENETRATIONS BY THE PREVIOUS SPLIT SYSTEM FOR ALL NEW REFRIGERAN$60,000
M00843611-I1-MS2023-06-13Mechanical / HVAC1488 THIRD AVENUEREPLACEMENT OF EXISTING 10 TON HVAC SYSTEM FOR STORE LOCATED ON FLOOR 01. REPLACE EXISTING AIR HANDLER AND OUTDOOR CONDENSING UNIT WITH NEW 10-TON SPLIT HEAT PUMP.$20,000
M00843566-I1-MS2023-04-04Mechanical / HVAC1504 THIRD AVENUEINSTALLATION OF TWO NEW DRY COOLERS AND ASSOCIATED PUMPS AND PIPING ON THE ROOF FOR EXISTING HVAC SYSTEM FOR FIRST FLOOR COMMERCIAL SPACE. EXISTING RISERS TO REMAIN.$35,031
M00837159-I1-MS2023-03-15Mechanical / HVAC353 CENTRAL PARK WESTAPPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 14TH FL (APT #14) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$32,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →