COMPANY RECORD · NEW YORK, NY
Yorke Construction Corp — permit history in New York, NY
Yorke Construction Corp appears on 68 New York permit records from 2020 through 2026, most often general construction (58.8% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 40 | 58.8% |
| Mechanical / HVAC | 28 | 41.2% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2020 | 1 |
| 2021 | 8 |
| 2022 | 12 |
| 2023 | 18 |
| 2024 | 11 |
| 2025 | 12 |
| 2026 | 6 |
Busiest year on record: 2023, with 18 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| City/Suburban Plbg Corp | 14 | 2026-08-07 |
| United Plbg Mechanical In | 12 | 2025-07-28 |
| Tristate Plbg Svcs Corp | 5 | 2023-05-31 |
| Standard Fire Protect LLC | 2 | 2022-05-26 |
| Buckmiller Auto.Spklr.Cor | 1 | 2026-01-29 |
| Dual Fuel Company LLC | 1 | 2026-08-21 |
6 companies are named alongside Yorke Construction Corp on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 63 CENTRAL PARK | 2026-07-16 |
| 66 WEST 12 STREET | 2026-06-23 |
| 50 EAST 87 STREET | 2026-06-18 |
| 153 PIERREPONT STREET | 2026-03-26 |
| 50 MORGAN AVENUE | 2026-03-04 |
| 245 WEST 52 STREET | 2025-12-03 |
| 134 WEST 18 STREET | 2025-04-23 |
| 129 PIERREPONT STREET | 2024-10-07 |
| 136 EAST 62 STREET | 2024-09-16 |
| 146 EAST 62 STREET | 2024-08-14 |
| 159 PIONEER STREET | 2024-01-24 |
| 131 AMSTERDAM AVENUE | 2023-10-30 |
| 300 CADMAN PLAZA WEST | 2023-06-07 |
| 425 LAFAYETTE STREET | 2023-06-01 |
22 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $3,000 to $14,300,000, median $283,393. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
68 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01418498-I1-MS | 2026-07-16 | Mechanical / HVAC | 63 CENTRAL PARK | INSTALL A NEW SELF-CONTAINED OUTDOOR EMERGENCY GENERATOR. | $150,000 |
| M01309829-S1-MS | 2026-06-23 | Mechanical / HVAC | 66 WEST 12 STREET | Provide indoor fan coil unit to serve the new multi-purpose room (educational use) and existing adjacent classroom. | $630,000 |
| M01309829-I1-GC | 2026-06-23 | General construction | 66 WEST 12 STREET | Interior and exterior demolition in existing classrooms on 7th Floor. No change in egress, use or occupancy. | $1,300,000 |
| M01402064-I1-GC | 2026-06-18 | General construction | 50 EAST 87 STREET | EXISTING BULKHEAD TO BE REPAIRED, RECONSTRUCTED, CREATE NEW OPENING FOR NON-EGRESS DOOR AT THE 1ST FLOOR OF THE EXISTING SANTURARY. SELECTIVE INTERIOR FINISH AND FURNITURE UPGRADE | $1,363,391 |
| B01213418-I1-GC | 2026-03-26 | General construction | 153 PIERREPONT STREET | Filing to amend existing C of O to add mezzanine level as per plans submitted. | $250,000 |
| B01201988-I1-GC | 2026-03-04 | General construction | 50 MORGAN AVENUE | THE RENOVATION PROJECT JOINS TWO EXISTING WAREHOUSES LOCATED ON ONE LOT, AND OWNED BY ONE OWNER. THE EXISTING WAREHOUSES ARE EACH ONE STORY, CONSTRUCTED OF STEEL AND MASONRY. NO AD | $940,015 |
| B01201988-S1-MS | 2025-12-23 | Mechanical / HVAC | 50 MORGAN AVENUE | Herewith filing for removal of existing MH system and build out new MH system for tenant fit out. | $545,020 |
| M01274567-S2-MS | 2025-12-03 | Mechanical / HVAC | 245 WEST 52 STREET | Mechanical scope associated with the August Wilson Theater renovation and restoration. No change of use, egress or occupancy. | $64,788 |
| M01274567-S1-GC-CX | 2025-11-28 | General construction | 245 WEST 52 STREET | Structural and Foundation work associated with August Wilson Theater interior renovation. No change of use, egress or occupancy. | $276,000 |
| M01274567-I1-GC | 2025-11-21 | General construction | 245 WEST 52 STREET | Architectural scope associated with the August Wilson Theater renovation and restoration. No change of use, egress or occupancy. | $2,176,886 |
| B01292523-I1-GC | 2025-09-30 | General construction | 50 MORGAN AVENUE | Interior removals and interior renovation. | $1,749,300 |
| B01213418-S1-MS | 2025-08-12 | Mechanical / HVAC | 153 PIERREPONT STREET | Filing herewith for mechanical work as per plans submitted. | $171,396 |
| M01118891-I1-GC | 2025-07-16 | General construction | 66 WEST 12 STREET | Removal and installation of interior nonbearing partitions and related finishes as per plans filed herewith. Scope includes installation of new rainscreen system on the south facad | $2,276,807 |
| M01118891-S2-MS | 2025-07-15 | Mechanical / HVAC | 66 WEST 12 STREET | Mechanical work as shown on plans. | $412,383 |
| B01200309-I1-GC | 2025-07-09 | General construction | 153 PIERREPONT STREET | Filing herewith for interior renovation on the 4th and 5th floors as per the plans submitted. No change to egress, use, or occupancy. | $237,757 |
| B01200309-S1-MS | 2025-06-30 | Mechanical / HVAC | 153 PIERREPONT STREET | Filing herewith for mechanical work as per the plans submitted. No change to egress, use, or occupancy. | $91,000 |
| M00972936-I1-GC | 2025-04-23 | General construction | 134 WEST 18 STREET | INTERIOR AND EXTERIOR RENOVATIONS ON FLOORS 01-03, FAC & ROF FOR NEW THEATRICAL STUDIO & OFFICES. HORIZONTAL EXTENSION AT 1ST FLOOR. VERTICAL EXTENSION AT 3RD FLOOR. | $6,240,000 |
| M00972936-S4-MS | 2025-04-21 | Mechanical / HVAC | 134 WEST 18 STREET | REMOVE AND INSTALL HVAC EQUIPMENT IN CONJUNCTON WITH ALT-CO #M00972936. WORK ON FLOORS 1-3, ROF. | $580,400 |
| B01111072-I1-MS | 2024-10-07 | Mechanical / HVAC | 129 PIERREPONT STREET | MECHANICAL WORK TO ADD VENTILATION SYSTEM TO EXERCISE ROOM AT 12TH FLOOR LEVEL AS PER PLANS FILED HEREWITH. NO CHANGES TO EGRESS, USE OR OCCUPANCY. | $45,000 |
| M01013984-I1-MS | 2024-09-16 | Mechanical / HVAC | 136 EAST 62 STREET | This Alteration is being filed for the replacement of rooftop air handler units, chillers, removal of chiller water pumps. There are no change in use, egress or occupancy. | $1,210,044 |
| M01006416-I1-ST | 2024-08-14 | General construction | 146 EAST 62 STREET | PARTIAL DEMOLITION MEANS & METHODS AND RELATED STABILIZATION AS PER PLANS. THIS APPLICATION IS FILED IN CONJUNCTION WITH M00955745-I1. | $120,050 |
| M00955745-I1-GC | 2024-08-07 | General construction | 146 EAST 62 STREET | The Proposed project is adding this portion (146 E 62nd St.) to the existing Mellon foundation building (136-144 E 62nd St.). New Rear extension and elevator and stair bulkhead and | $3,085,595 |
| M00964618-I1-MS | 2024-08-07 | Mechanical / HVAC | 146 EAST 62 STREET | Mechanical work in conjunction with Alteration | $1,042,020 |
| B01060297-I1-GC | 2024-07-05 | General construction | 129 PIERREPONT STREET | General construction work at the Bosworth building for upgrades to the bathrooms and floors at the 6th floor as per plans filed herewith. No changes to egress, occupancy or use. | $210,000 |
| B01060297-S1-MS | 2024-06-27 | Mechanical / HVAC | 129 PIERREPONT STREET | ADJUST EXISTING EXHAUST AIR DISTRIBUTION & ADDED EXHAUST FAN ACCORDINGLY FOR UPDATED BATHROOM LAYOUTS AT 6TH FLOOR LEVEL AS PER PLANS FILED HEREWITH. NO CHANGES TO EGRESS, USE OR | $13,000 |
| M00951980-I1-GC | 2024-03-01 | General construction | 245 WEST 52 STREET | Interior renovation of the August Wilson Theater accessory spaces on the 002 and 003 floors. No change of use, egress or occupancy. | $361,000 |
| B00960189-I1-MS | 2024-01-24 | Mechanical / HVAC | 159 PIONEER STREET | additions/modifications to existing mechanical system as per plans filed herewith. no change in use egress or occupancy. | $1,600,000 |
| B00987021-I1-GC | 2024-01-17 | General construction | 159 PIONEER STREET | Filing for general construction non-structural demolition related to build-out- accessory observatory to exhibition hall. Related to alt 1 change of use and vertical enlargement fi | $500,000 |
| M00951980-S1-MS | 2024-01-16 | Mechanical / HVAC | 245 WEST 52 STREET | Mechanical scope associated with the renovation of the Theater ancillary spaces on the 002 and 003 floors. No change of use, egress, or occupancy. | $255,000 |
| M00914934-I1-GC | 2023-12-05 | General construction | 245 WEST 52 STREET | Architectural scope associated with the construction of temp. seating & performance platforms, stairs, ramps, doors, and partitions in connection with Cabaret TPA for the run of th | $1,800,000 |
| M00914934-S3-MS | 2023-12-05 | Mechanical / HVAC | 245 WEST 52 STREET | Mechanical scope associated with the Cabaret TPA for the run of the Broadway show. Will be restored to existing conditions. No change of use, egress or occupancy. | $75,000 |
| M00933200-I1-MS | 2023-10-30 | Mechanical / HVAC | 131 AMSTERDAM AVENUE | Repair of existing Type 1 kitchen hoods, including connecting a replacement hood to an existing exhaust system and roof exhaust termination at the Rose Cafe. No change of use, egre | $224,000 |
| M00892183-I1-GC | 2023-10-11 | General construction | 146 EAST 62 STREET | Interior demo and renovation of building, No change in use, egress, or occupancy. | $1,341,612 |
| B00927075-I1-GC | 2023-09-11 | General construction | 129 PIERREPONT STREET | Filing for general construction work relating to the secondary column supports of the existing structure, The structural work is filed as subsequent filing. | $81,000 |
| M08031175-I1-MS | 2023-09-08 | Mechanical / HVAC | 63 CENTRAL PARK | Demolition and replacement of mechanical systems within bowl area. New mechanical systems to include but no limited to: VRF heating & cooling systems, split systems to provide cool | $1,991,314 |
| M08031151-I1-GC | 2023-09-08 | General construction | 63 CENTRAL PARK | Updating deteriorating outdoor assembly seating, weather protection of interior areas. Enhance accessible access and accessible seating areas as indicated on plans. Interior renova | $13,005,205 |
| B00892042-S2-MS | 2023-07-21 | Mechanical / HVAC | 129 PIERREPONT STREET | Filing for mechanical work to provide new air distribution to new offices and bathrooms. No change to egress, use, or occupancy. | $8,000 |
| B00892042-I1-GC | 2023-07-20 | General construction | 129 PIERREPONT STREET | Filing for general construction on 8th & 9th Floors as per plans submitted. No change to egress, use, or occupancy. | $210,000 |
| B00890770-S1-MS | 2023-07-20 | Mechanical / HVAC | 129 PIERREPONT STREET | Filing mechanical work for new air distribution to new office and bathrooms as per plans submitted. No change in egress, use or occupancy. | $8,000 |
| B00890770-I1-GC | 2023-07-20 | General construction | 129 PIERREPONT STREET | Filing for interior general construction work as per plans submitted. No change to egress, use, or occupancy. | $70,000 |
| B00866589-I1-MS | 2023-06-07 | Mechanical / HVAC | 300 CADMAN PLAZA WEST | Modification of mechanical on 1st floor educational space & Installation of (1) 4 ton HVAC unit on roof as per plans filed herewith. No change in use, egress or occupancy. | $25,000 |
| M00864025-I1-GC | 2023-06-01 | General construction | 425 LAFAYETTE STREET | PATCH WALLS AND CEILINGS AS NEEDED FOR HVAC AND HEATING RELATED MODIFICATIONS AT PUBLIC THEATER AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. PLEASE REFE | $233,800 |
| M00864025-S1-MS | 2023-06-01 | Mechanical / HVAC | 425 LAFAYETTE STREET | MECHANICAL SCOPE ASSOCIATED WITH HVAC AND HEATING RELATED MODIFICATIONS AT THE PUBLIC THEATER AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $682,000 |
| M00864167-I1-GC | 2023-05-12 | General construction | 165 WEST 65 STREET | Removal and installation of non-load bearing partition walls, doors, ceiling, fixtures, millwork, and flooring on dormitory floors 16-19, 28-29 Removal of a part of abandoned trash | $3,197,000 |
| B00866559-I1-GC | 2023-05-11 | General construction | 300 CADMAN PLAZA WEST | Interior demo and installation of partitions on 1st floor for education space as per plans. No change in use, egress or occupancy. | $245,000 |
| B00844332-I1-GC | 2023-03-30 | General construction | 300 CADMAN PLAZA WEST | Non structural demolition of interior partitions and finishes of an existing educational space. No change in use, egress or occupancy. | $18,400 |
| M00598210-I1-MS | 2023-01-12 | Mechanical / HVAC | 108 EAST 15 STREET | Replacement of existing AC-7 unit and addition of new fresh air fan FAF-1 in cellar mechanical room serving the theater. | $200,000 |
| M00699696-S1-MS | 2022-11-10 | Mechanical / HVAC | 60 LINCOLN CENTER PLAZA | Modification of the existing ductwork system on the 2nd and 5th floor rooms as shown on drawings filed herewith. No change in use, egress, or occupancy under this application. | $150,000 |
| M00644419-I1-GC | 2022-10-07 | General construction | 512 WEST 19 STREET | Herewith filing for interior renovation of existing building and updating CO with public assembly spaces and uses. | $14,300,000 |
| M00744575-I1-GC | 2022-10-05 | General construction | 63 CENTRAL PARK | phase 1 - arch modifications - limited to the renovation of Stage, understage trap area, Shack (separate structure south of Gate 1), and ADA access to the Shack. in conj M00744710 | $2,772,464 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
