COMPANY RECORD · MINNEAPOLIS, MN
Metropolitan Mechanical Contractors — permit history in Minneapolis, MN
Metropolitan Mechanical Contractors appears on 54 Minneapolis permit records from 2017 through 2026, most often mechanical / hvac (63% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Mechanical / HVAC | 34 | 63% |
| Plumbing | 20 | 37% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2017 | 3 |
| 2018 | 1 |
| 2024 | 2 |
| 2025 | 36 |
| 2026 | 12 |
Busiest year on record: 2025, with 36 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 2450 RIVERSIDE AVE | 2026-06-29 |
| 901 3RD AVE S | 2026-05-14 |
| 2828 10TH AVE S | 2026-03-04 |
| 606 24TH AVE S | 2026-02-05 |
| 2607 6TH ST NE | 2026-01-15 |
| 600 26TH AVE NE | 2026-01-15 |
| 1422 LAKE ST W | 2025-12-17 |
| 800 NICOLLET MALL | 2025-12-11 |
| 729 WASHINGTON AVE N | 2025-12-10 |
| 4300 WEST RIVER PKWY S #437 | 2025-11-13 |
| 1 TWINS WAY | 2025-10-28 |
| 200 6TH ST S | 2025-10-24 |
| 1001 3RD AVE S | 2025-10-02 |
| 2512 7TH ST S | 2025-08-04 |
25 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
54 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| BLDG1182203 | 2026-06-29 | Mechanical / HVAC | 2450 RIVERSIDE AVE | Adding to CT scanner to existing space. Adding 2 vav boxes and low-pressure ducts. Addition work includes adding 2 hydronic pumps, 1 air separator, 1 expansion tank, 1 heat exchang | |
| BLDG1182232 | 2026-06-01 | Plumbing | 2450 RIVERSIDE AVE | Med Gas piping, sanitary and domestic water to (1) sink | |
| BLDG1173415 | 2026-05-14 | Mechanical / HVAC | 901 3RD AVE S | Demo VAV's, fans and duct. Install shutoff VAV boxes with hot water reheat, new FPVAV box, diffusers, duct for conference center and venting of gas fireplace. Venting to comply wi | |
| BLDG1173393 | 2026-04-28 | Plumbing | 901 3RD AVE S | Scope includes restroom remodeling and misc additional fixtures. All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Code (MSPC), Chapter 471 | |
| BLDG1173640 | 2026-04-20 | Plumbing | 2450 RIVERSIDE AVE | fairview riverside. 10 floor locker room upgrade | |
| BLDG1169665 | 2026-04-07 | Mechanical / HVAC | 2450 RIVERSIDE AVE | Installing 2 VAV s from existing main duct with reheats and modifying exhaust ducts for shower/change room M1003-1 and shower/change room 1003 BLDG11696 Work is located on leve | |
| BLDG1169663 | 2026-03-27 | Plumbing | 2450 RIVERSIDE AVE | Floor 10 Upgraded Locker Room | |
| BLDG1166432 | 2026-03-04 | Plumbing | 2828 10TH AVE S | Addition of (x11) Overflow Roof Drains and a corresponding Secondary Storm Drainage System within the Allina TAF Facility | |
| BLDG1155319 | 2026-02-05 | Mechanical / HVAC | 606 24TH AVE S | Piping in reheat coil valves for new reheat coils associated with other mechanical work listed under permit BLDG115535 BLDG1155235 . BLDG1155319 | |
| BLDG1155235 | 2026-02-05 | Mechanical / HVAC | 606 24TH AVE S | BLDG1155235 2 floor area A and B. Reconfigure piping, low pressure ducts systems and VAV's with hot water coils. Also adding Fire/Smoke damper to existing return main at grid S1. | |
| BLDG1160933 | 2026-01-15 | Mechanical / HVAC | 2607 6TH ST NE | Replace 3 - RTUs with same capacity. Review Note: Unless technically unfeasible, new and replacement rooftop equipment shall be provided with insulated curbs as described in | |
| BLDG1160936 | 2026-01-15 | Mechanical / HVAC | 600 26TH AVE NE | Direct appliance replacement only. | |
| BLDG1148249 | 2025-12-17 | Mechanical / HVAC | 1422 LAKE ST W | Replace 2 - 17.5-ton RTUs, 1 - 3-ton RTU and their associated ductwork on roof. Review Note: Unless technically unfeasible, new and replacement rooftop equipment shall be pro | |
| BLDG1155218 | 2025-12-11 | Mechanical / HVAC | 800 NICOLLET MALL | HVAC alteration for tenant build-out at 28th floor. Installing fan-powered boxes, VAV box, GRDs, and all associated ductwork per approved plans. emailed applicant on required li | |
| BLDG1154694 | 2025-12-10 | Plumbing | 729 WASHINGTON AVE N | Plumbing for pantry and restroom remodel on level 4. All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Code (MSPC), Chapter 4714. All pipe | |
| BLDG1155449 | 2025-12-04 | Plumbing | 606 24TH AVE S | Install salveaged toiler, flush valve ans set. Connect existing plumbing rough in's. Provide new cold water quarter turn stop Install salvaged sink and faucet, connect existin | |
| BLDG1151767 | 2025-11-25 | Mechanical / HVAC | 2450 RIVERSIDE AVE | Install ventilation to new hazardous material room, move existing L.P. steam and hot water piping to accommodate room construction. Safety shutoff controls are included with mechan | |
| BLDG1154148 | 2025-11-21 | Mechanical / HVAC | 2450 RIVERSIDE AVE | GRDs and ductwork alteration per approved plan. | |
| BLDG1152954 | 2025-11-20 | Mechanical / HVAC | 729 WASHINGTON AVE N | HVAC alterations include modifying the existing distribution system through the current air-handling units, reusing existing fan-powered and VAV boxes, adding one new VAV box to su | |
| BLDG1154256 | 2025-11-20 | Plumbing | 2450 RIVERSIDE AVE | Demo of existing sanitary piping in supply storage room. Demo cold domestic piping from hall wat into treatment room per page M003. Furnish and install (2) | |
| BLDG1153237 | 2025-11-13 | Plumbing | 4300 WEST RIVER PKWY S #437 | We are replacing a tub with a shower so we need to increase the drain side from 1.5" to 2" pipe. Job #11032993 | |
| BLDG1146942 | 2025-10-28 | Plumbing | 1 TWINS WAY | Scope includes a sink and floor drains in a bar area All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Code (MSPC), Chapter 4714. All pipe | |
| BLDG1146842 | 2025-10-27 | Mechanical / HVAC | 1 TWINS WAY | Modifying the existing distribution system per the approved plans. | |
| BLDG1145509 | 2025-10-24 | Mechanical / HVAC | 200 6TH ST S | Adding 2" remote fill line for generator. Rest of work under BLDG1130788. BLDG1145509 Contractors permit application stated $200,000.00 but emailed a notice to us of the typo. $2 | |
| BLDG1132815 | 2025-10-02 | Mechanical / HVAC | 1001 3RD AVE S | Installation of FO piping for existing generators. 10 generators are located on the 6th floor, and 8 generators are on the roof. New piping is connecting to existing pipe system on | |
| BLDG1135119 | 2025-08-15 | Mechanical / HVAC | 1001 3RD AVE S | HVAC system for data center on 4th and 5th floors, installing coolant distribution units, chilled doors, data center air handling units, buffer tanks, expansion tanks and all assoc | |
| BLDG1134853 | 2025-08-04 | Plumbing | 2512 7TH ST S | Installation of 6 exam room sinks for an existing clinic on 1st floor. | |
| BLDG1130788 | 2025-07-24 | Mechanical / HVAC | 200 6TH ST S | Generator piping per approved plan. | |
| BLDG1120448 | 2025-06-11 | Plumbing | 2450 RIVERSIDE AVE | State licensed facility - plan review by MN Dept. of Labor and Industry - no city plan review required DIALYSIS AREA/FLOORS - Replacement of 56 dialysis boxes on floors 3rd thro | |
| BLDG1123397 | 2025-06-06 | Mechanical / HVAC | 2450 RIVERSIDE AVE | Install new vav to include 2 supply openings and 1 return opening in newly created vender closet. Return air duct from storage room is transferred back to a common return location | |
| BLDG1118359 | 2025-05-19 | Mechanical / HVAC | 2450 RIVERSIDE AVE | BLDG1118359 Relocate ducts, diffusers, and small refrigeration skid on the 1st floor of the children's masonic building due to department new needs. Follow 2024 energy code. | |
| BLDG1112803 | 2025-05-06 | Mechanical / HVAC | 1111 WEST RIVER PKWY | BLDG1112803 Modify finned tube radiation to accommodate new floor plan. Adding 2 new HFCU's with piping ductwork and diffusers. | |
| BLDG1116137 | 2025-05-02 | Mechanical / HVAC | 2312 6TH ST S | BLDG1116137 Demo of existing ductwork and steam radiant heat. Install of new diffusers and ductwork as well as hot water radiant panels in ceiling to accommodate new floor pl | |
| BLDG1116140 | 2025-05-01 | Plumbing | 2312 6TH ST S | Adding of 4 floor drains and 2 P-7 Showers. Domestic hot and cold water will be added to serve new P-7 Shower fixture. Waste and vent piping will be added for the floor drains.All | |
| BLDG1112801 | 2025-04-11 | Plumbing | 1111 WEST RIVER PKWY | Install water, waste and vent pipe to new fixtures for Suite A, 35th floor. | |
| BLDG1108728 | 2025-03-11 | Mechanical / HVAC | 2800 10TH AVE S | HVAC system for pharmacy area remodel, installing DX split system, VAV boxes, return fan, air valve, GRDsand all associated ductwork per approved plans. | |
| BLDG1108727 | 2025-03-11 | Mechanical / HVAC | 2800 10TH AVE S | Structural drawings for the chiller have been uploaded into for reference folder. Chiller addition and chiller piping modifications. BLDG1108727 | |
| BLDG1108729 | 2025-03-10 | Plumbing | 2800 10TH AVE S | Abbott Northwestern TAF Pharmacy - Modify existing plumbing for new floor plan and new fixtures. See attached plumbing plans by Dunham Associates. Fixtures marked "other" are Eme | |
| BLDG1106223 | 2025-03-05 | Plumbing | 1111 WEST RIVER PKWY | FOR UNITS 35B & 35C - PLUMBING BUILDOUT Install water, waste and vent pipe to new fixtures for Suite B and C buildout. All plumbing shall be installed in accordance with the | |
| BLDG1106100 | 2025-03-03 | Mechanical / HVAC | 2800 10TH AVE S | HVAC system, installing steam humidifier manifold in existing duct and associated piping per attached drawings. | |
| BLDG1108178 | 2025-03-03 | Plumbing | 1111 WEST RIVER PKWY | #30C - BATHROOM FIXTURES: Remove lavatory for new countertops, reinstall 2 lavatories | |
| BLDG1107590 | 2025-02-27 | Mechanical / HVAC | 1111 WEST RIVER PKWY | HVAC system for two condominiums, Installing vertical chilled water fan-coils, fin-tube radiation, exhaust fans, GRDs and all associated ductwork per approved plans. | |
| BLDG1104607 | 2025-02-20 | Mechanical / HVAC | 2450 RIVERSIDE AVE #WEST BLDG | Minor duct alterations. BLDG1104607 | |
| BLDG1104608 | 2025-02-20 | Mechanical / HVAC | 2450 RIVERSIDE AVE #WEST BLDG | Adding new GRDs and all associated ductwork per approved plans. | |
| BLDG1104610 | 2025-02-18 | Plumbing | 2450 RIVERSIDE AVE #WEST BLDG | barista station 9 replace sink | |
| BLDG1102261 | 2025-02-11 | Mechanical / HVAC | 350 5TH ST N | Mechanical buildout for levels 10 through 14. Core water pipe, het pumps, duct systems. BLDG1102261 | |
| BLDG1100219 | 2025-02-07 | Mechanical / HVAC | 701 25TH AVE S | This application is in addition to permit BLDG1025136 applied for on 10/12/2023 BLDG1100219 emailed applicant on license flag - 2025-02-07 - lea | |
| BLDG1102343 | 2025-01-21 | Plumbing | 350 5TH ST N | FOR FLOORS 10 -14 FIXTURES: Install 9 breakroom sinks, 8 lavatories, 5 toilets, 1 water heater, replace 4 existing water coolers with new. All plumbing shall be instal | |
| BLDG1100406 | 2024-12-27 | Plumbing | 1 TWINS WAY | MMC to demo existing various piping, sinks, and drains to allow for architectural updates to the #105 & #109 concession stands. | |
| BLDG1098159 | 2024-12-13 | Mechanical / HVAC | 651 NICOLLET MALL | BLDG1098159 Rework existing HVAC systems to accommodate new floor plan. Work to include new and relocated FP/VAV. emailed applicant on required license flag - 2024-12-06 - lea |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Minneapolis permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
