COMPANY RECORD · MINNEAPOLIS, MN

M . A . Mortenson — permit history in Minneapolis, MN

M . A . Mortenson appears on 54 Minneapolis permit records from 2017 through 2026, all of them general construction.

Permit categories

CategoryPermitsShare
General construction54100%

Activity by year

YearPermits issued
20175
201812
20194
20201
20212
202216
20235
20243
20251
20265

Busiest year on record: 2022, with 16 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
800 28TH ST E2026-08-20
2800 10TH AVE S2026-03-03
2450 RIVERSIDE AVE2025-11-14
818 DUNWOODY BLVD2024-06-13
800 LASALLE AVE2024-04-12
901 MARQUETTE AVE2023-06-20
511 11TH AVE S2023-04-24
2800 CHICAGO AVE2022-07-19
913 26TH ST E2022-04-28
1221 LAKE ST W2022-04-28
825 NICOLLET MALL2022-04-28
121 8TH ST S2022-04-28
920 28TH ST E2022-04-28
2701 ELLIOT AVE2022-04-07

24 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

54 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
BLDG11876802026-08-20General construction800 28TH ST EALLINA UPDATING ABBOTT NORTHWESTERN 920 BLDG WITH NEW TECHNOLOGY ON LOWER LEVEL AND 5TH FLOOR. WORK IS RELATED TO BLDG1143753, BLDG1155448, BLDG1159201, BLDG1163398, BLDG1181197.
BLDG11661712026-03-03General construction2800 10TH AVE SALTER ROOF DRAIN SYSTEM 2020 MSBC architect: 53825 - Abeln, Daniel Jonathon @ EAPC engineer: 61683 - Wuollet, John Christopher @ MBJ
BLDG11633982026-02-11General construction800 28TH ST EUpdating the Abbott Northwestern TAF and Main hospital west Building Data closets with new technology on 2nd and 3rd floor. Work includes Electrical and HVAC (Rooms 2903M, 2905M, a
BLDG11554482026-02-03General construction800 28TH ST EABBOTT NORTHWESTERN PIPER BUILDING AND MAIN EAST BUILDING DATA CLOSET UPGRADES. WORK TO BE DONE ON 2ND, 3RD, 6TH FLOOR. SEE PAGES "LEVEL 02 LIFE SAFETY PLAN", "LEVEL 03 LIFE S
BLDG11592012026-01-08General construction800 28TH ST EIn existing hospital, update Data closets on LL, 1st, 2nd, and 7th floors (Rooms G928A, CK1842, CK2799 H0229, W7114G). This work is related to Projects BLDG1143753 and BLDG1155448
BLDG11522092025-11-14General construction2450 RIVERSIDE AVEAdding a hazardous waste storage room into the footprint of the loading dock buildout that is permitted under permit BLDG1084452. Added SF to the project is 0 SF.
BLDG10844522024-10-10General construction2450 RIVERSIDE AVEloading dock addition and remodel. certificate of occupancy required no special inspections required yes const type: 1a occupancy: I2 2020 MSBC sprinkle
BLDG10643272024-06-13General construction818 DUNWOODY BLVDREMODEL - REMOVE BLOCK, ADD DRYWALL - DUNWOODY, GREEN LEVEL 2020 MSBC architect: 26978 - Berg, Michael Erik
BLDG10472992024-04-12General construction800 LASALLE AVEBUILD PICKLE BALL SAUNA const type: IA occupancy: B 2020 MSBC sprinklered: YES sac: _1.00_ charges __ credits = _1.00_ net met council letter dated _3
BLDG9981462023-09-05General construction818 DUNWOODY BLVDdining hall ceiling remodel on green level, (4) bathroom refreshes on two different levels (black and red levels), Interior classroom remodel for a new program within the College o
BLDG9993852023-06-20General construction901 MARQUETTE AVEOffice Remodel certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC occupant load: 121
BLDG9923842023-05-15General construction818 DUNWOODY BLVDDunwoody Site & Signage Upgrades certificate of occupancy required: no special inspections required: yes const type: 2-B occupancy: U 2020 MSBC arch
BLDG9880012023-04-24General construction511 11TH AVE SEXTERIOR EXCAVATION AND SITE PREP TO CONSTRUCT EQUIPMENT YARD AND STRUCTURAL FOUNDATIONS FOR ELECTRICAL EQUIPMENT (MAAA) ENGINEER: Shane Eckman #40495
BLDG9835722023-04-24General construction511 11TH AVE SInterior Remodel 2nd floor Data Hall ***DB approved post-issue revisions 8/25/23*** certificate of occupancy required: no special inspections required: no const type:
BLDG9671772022-11-07General construction800 28TH ST ECONVERT ROOM 1294 INTO TEMPORARY POP UP CAFETERIA , TAKE OUT NO SEATING (MAA) const type: II occupancy: B 2020 MSBC occupant load: 20 sprinklered:YES
BLDG9350862022-07-19General construction2800 CHICAGO AVE(DMH - ProjectDox) SECURITY CAMERAS AND CARD READER UPGRADES TO SELECT DOORS AT PATIENT WAITING ROOM LOCATIONS IN HEALTH FACILITY. 1ST, 2ND AND 4TH FLOORS. Const type: II-A
BLDG9516402022-07-18General construction800 28TH ST Eremodel 4 existing seclusion room areas on 3rd and 4th floor - courage Kenny medical building. certificate of occupancy required: no const type: 1b occupancy: b
BLDG9384302022-05-31General construction2450 RIVERSIDE AVERemodel 3rd Flr Histology Lab certificate of occupancy required no special inspections required yes, firestop per 1705.17 const type: 1-A occupancy: I-2 2
BLDG9352772022-04-28General construction800 28TH ST EAbbott Northwest Hospital Security Upgrades Required egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort or shall c
BLDG9352412022-04-28General construction913 26TH ST EPiper Building Security Upgrades Required egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. certificate of occu
BLDG9357532022-04-28General construction1221 LAKE ST WAllina Clinic Security Upgrades Required egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. certificate of occu
BLDG9352582022-04-28General construction825 NICOLLET MALLAllina Clinic Security Upgrades - Suite 300 Required egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. certific
BLDG9357722022-04-28General construction121 8TH ST SAllina Clinic Security Upgrades - TCF Tower Women's Health - Suite 600 Required egress doors shall be readily openable from the egress side without the use of a key or special kno
BLDG9354652022-04-28General construction920 28TH ST EAllina Clinic Security Upgrades - ANW MHI Building Required egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. c
BLDG9324692022-04-07General construction2701 ELLIOT AVEminor security upgrades - mainly card readers and cameras.
BLDG9324662022-04-01General construction810 27TH ST Eminor security upgrades - mainly card readers and cameras.
BLDG9324782022-04-01General construction2800 HENNEPIN AVEminor security upgrades - mainly card readers and cameras.
BLDG9324702022-04-01General construction800 28TH ST Eminor security upgrades - mainly card readers and cameras.
BLDG9324752022-04-01General construction902 26TH ST Eminor security upgrades - mainly card readers and cameras.
BLDG9092302022-01-27General construction2925 CHICAGO AVESECURITY UPGRADES THROUGHOUT THE CLINIC (MAA) certificate of occupancy required: NO const type: II B occupancy: B 2020 MSBC sprinklered:YES Tenant: ALLIN
BLDG8801362021-05-21General construction2801 CHICAGO AVEFULL CONST - ABBOTT NORTHWEST TRANSPORTATION HUB per BLDG880127 and PDR PLAN11212 ------ ADDITION OF 2 LEVELS TO EXISTING PARKING GARAGE - "RAMP 6" (existing, 311' x 224') && NEW
BLDG8832742021-04-26General construction2801 CHICAGO AVEremoval of select precast exterior panels and cornice on parking ramp in preparation for addition. sck
BLDG8494152020-09-24General construction800 28TH ST Econstruct medical gas tank enclosure adjacent to 28th st.. sck special inspections required
BLDG8072282019-12-20General construction2450 RIVERSIDE AVE #WEST BLDGalterations in first floor bridging clinic. sck**** certificate of occupancy required no***** special inspections required no***** const type: 1a occupancy: I2
BLDG8042362019-12-20General construction2450 RIVERSIDE AVEremodel west wing of 11th floor - NICU. sck*** certificate of occupancy required no special inspections required no const type: 1a occupancy: I2 2015 MSBC
BLDG7822862019-07-02General construction88 17TH ST NMODIFICATIONS TO SOUTH ENTRY INCLUDING BRICK FACADE REPAIRS AND WINDOW/DOOR REPLACEMENT IN EXISTING OPENINGS. REBUILD STAIRS FOR IMPROVED RISE/RUN. (LAH) 20% accessibility up
BLDG7762542019-05-31General construction901 MARQUETTE AVEinterior demo of floors 22 through 27. sck
BLDG7264862018-09-26General construction600 1ST AVE NUpper Concourse Renovation - Team Store certificate of occupancy required: no special inspections required: no const type: 1B occupancy: A4 2015 MSBC sprinkl
BLDG7264872018-09-25General construction600 1ST AVE Nalterations in Lexus courtside club. sck#1
BLDG7264882018-09-25General construction600 1ST AVE Nadd door from main locker room corridor to lynx exam room. sck
BLDG7235582018-09-12General construction2450 RIVERSIDE AVE #WEST BLDGREMODEL SHOWER ROOMS ON FLOORS 3 AND 4 INTO BEHAVIORAL HEALTH / LIGATURE RESISTANT SHOWER ROOMS PER FGI GUIDELINES AND MDH RECOMMENDATIONS certificate of occupancy required NO
BLDG7271322018-09-05General construction88 17TH ST NREPLACE GARAGE DOOR IN EXISTING OPENING AT NORTH END OF SACRISTY - BASILICA OF SAINT MARY. (LAH) ARCHITECT: LEMMON #40489 (MILLER DUNWIDDIE)
BLDG7262342018-08-29General construction2450 RIVERSIDE AVEreconfiguration of reception triage. CHANGING ENTRY LAYOUT. ADDING 2 SMALL OFFICES. (JJL) certificate of occupancy required no mechanical plans required for certificate of
BLDG7176252018-08-23General construction600 1ST AVE Ntreasure island suite level renovation. sck#1 certificate of occupancy required no const type: 1b occupancy: A2 2015 MSBC occupant load: 395 sprink
BLDG7144092018-06-26General construction88 17TH ST NREMODEL CATERING KITCHEN IN BASEMENT AT CHURCH.(JAG) certificate of occupancy required:no special inspections required:no const type: 1-A (ASSUMED EXISTING) occupancy:
BLDG7054312018-05-14General construction2450 RIVERSIDE AVE #WEST BLDGremodel for emergency department consult rooms. sck#2 certificate of occupancy required yes no mechanical plans required for certificate of occupancy mechanical plans/letter
BLDG6910652018-03-02General construction715 8TH ST Sbuild out of new café in existing CSC building. (MAA #02) As per SAC letter THIS IS THE CHARGE FOR THE ENTIRE FIRST FLOOR THAT WAS NOT DETERMINED IN 2015 certificate of occupa
BLDG6880542018-01-25General construction90 7TH ST SThe overall project entails a Tenant Improvement remodel to floors 20-21 and 23-27 (7 total) of the Wells Fargo Center. Faegre Baker Daniels is the tenant for the remodel and cur
BLDG6886172018-01-11General construction2450 RIVERSIDE AVESAC PYMT FOR BLDG674324 - CHILDREN'S PLAY AREA
BLDG6863112017-12-28General construction600 1ST AVE NDOORS/HARDWARE/PLUMBING FIXTURE REPLACEMENTS DELAYED EGRESS IS NOT PERMITTED IN GROUP A OCCUPANCIES certificate of occupancy required: no special inspections required: no

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Minneapolis permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →