COMPANY RECORD · MINNEAPOLIS, MN

Harris St Paul Inc — permit history in Minneapolis, MN

Harris St Paul Inc appears on 208 Minneapolis permit records from 2019 through 2026, most often mechanical / hvac (55.8% of the record).

Permit categories

CategoryPermitsShare
Mechanical / HVAC11655.8%
Plumbing9244.2%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
201923
202023
202135
202230
202325
202418
202529
202625

Busiest year on record: 2021, with 35 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
501 2ND ST S2026-08-19
800 28TH ST E2026-07-21
2800 10TH AVE S2026-06-18
2530 CHICAGO AVE2026-06-10
818 DUNWOODY BLVD2026-06-04
2730 10TH AVE S2026-06-02
5916 PLEASANT AVE2026-05-08
2525 CHICAGO AVE2026-04-14
945 BROADWAY ST NE2026-03-09
916 28TH ST E2025-10-14
2545 CHICAGO AVE2025-05-13
4530 LYNDALE AVE S2024-08-22
5015 35TH AVE S2024-08-22
600 HENNEPIN AVE2024-08-12

44 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

208 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
BLDG11912882026-08-19Mechanical / HVAC501 2ND ST SReplacing two 105 ton RTU's and one 40 ton RTU Review Note: Unless technically unfeasible, new and replacement rooftop equipment shall be provided with insulated curbs as de
BLDG11875132026-07-21Mechanical / HVAC800 28TH ST EBP #6. Provide and install (2) mini split cooling units, (2) bathroom exhaust fans and misc. duct modifications BLDG1187513
BLDG11876202026-07-07Plumbing800 28TH ST EDescription: BP #6. Provide water, waste and vent tie into existing for install of new bathroom. Fixture count: (1) sink/ Lav (1) toilet Valuation: 63,000.00
BLDG11841712026-06-18Plumbing2800 10TH AVE S1 lav sink and 1 toilet
BLDG11836482026-06-10Plumbing2530 CHICAGO AVEOn second floor pharmacy, bring associated plumbing to add one lavatory and floor drain, and bring RO drop to owners equipment.
BLDG11833162026-06-10Mechanical / HVAC2530 CHICAGO AVEHVAC alterations, reusing existing fan-powered and VAV boxes and adding two new VAV boxes to suit the new pharmacy layout, and installing GRDs, and all associated ductwork as per t
BLDG11822382026-06-04Mechanical / HVAC818 DUNWOODY BLVDNew exhaust fan duct, with associated transfer duct to serve a remodeled bathroom on 3rd floor and newly converted bathroom (from office space) on second floor per approved plans.
BLDG11822342026-06-03Plumbing818 DUNWOODY BLVDRemodel of (2) Restrooms on 3rd floor; and conversion of offices into (2) restrooms on second fl. All plumbing shall be installed in accordance with the 2020 Minnesota State P
BLDG11825122026-06-02Mechanical / HVAC2730 10TH AVE Sadministrative permit for the 4th floor mechanical alterations of portion of existing heart hospital. all fees collected and all approved drawings for this work are found on BLDG 1
BLDG11825132026-06-02Mechanical / HVAC2730 10TH AVE Sadministrative permit for the 3rd floor mechanical alterations of portion of existing heart hospital. all fees collected and all approved drawings for this work are found on BLDG 1
BLDG11825172026-06-02Plumbing2730 10TH AVE Sadministrative permit for plumbing alterations of the pedestrian tunnel from hospital to TAF building. all fees collected and all approved drawings for this work are found on BLDG
BLDG11825192026-06-02Plumbing2730 10TH AVE Sadministrative permit for the 4th floor plumbing alterations of existing heart hospital. all fees collected and all approved drawings for this work are found on BLDG 1044056
BLDG11825052026-06-02Mechanical / HVAC2730 10TH AVE Sadministrative permit for mechanical alterations of the pedestrian tunnel from hospital to TAF building. all fees collected and all approved drawings for this work are found on BLD
BLDG11825202026-06-02Plumbing2730 10TH AVE Sadministrative permit for the 3rd floor plumbing alterations of existing heart hospital. all fees collected and all approved drawings for this work are found on BLDG 1044056
BLDG11727182026-05-20Mechanical / HVAC800 28TH ST EInstalling CHW CRAC unit MW CRAC 203,204,205,206,207,208,209. Installing refrigeration CRAC units TAF DXSS 6M3B/3A per approved plans.
BLDG11719852026-05-14Mechanical / HVAC800 28TH ST EI moved the symbol /abbreviation plan sheet M000 to the for-reverence file. (BLDG 1171985 - ProjectDox Prod ) CHW CRAC unit MW CRAC 201/202. 4 a/c, 2 CRAC for level 3 and 4 A/C fo
BLDG11616572026-05-08Mechanical / HVAC5916 PLEASANT AVEBLDG1161657 Replacement of 4 RTU's and removal of 1 RTU, adding 2 humidifiers and minor duct modifications.
BLDG11670972026-04-28Mechanical / HVAC800 28TH ST EAdd CHW CRAC unit to B2, E3079, PB3667, H0229B, CK1843, CK2799, H3117, E87D6. Add refrigeration CRAC unit to PB6600D, W7114E. Add AHU to serve R1 Data rm. Provide and install m
BLDG11691702026-04-14Mechanical / HVAC2525 CHICAGO AVEDuctwork modification for new Cath lab per approved plans.
BLDG11671602026-04-07Plumbing800 28TH ST EWaste and vent work at Abbott Northwestern Hospital. This project is for a state licensed health care facility and the plumbing plan review has been completed by the Minnesot
BLDG11691712026-04-07Plumbing2525 CHICAGO AVERemodel of CT/Cath Lab Room with new equipment. Med Gas disconnects and reconnects from column booms. medical gas piping
BLDG11646112026-03-09Mechanical / HVAC945 BROADWAY ST NEProvide and install a new replacement bath fan and exhaust ducting through a non-plenum ceiling through roof. Back draft damper and goose neck termination. Duct to be insulated f
BLDG11567112026-01-28Mechanical / HVAC800 28TH ST EDuct alterations to data room K2 through K8. Adding 2 owner CRAC units.
BLDG11621242026-01-27Mechanical / HVAC800 28TH ST EReplace GRDs and rebalance area.
BLDG11583982026-01-06Plumbing800 28TH ST EAbbott northwestern 5th Floor Replace one water fountain and demolishing 4 sinks (and capping water lines) in office area of 5th floor.
BLDG11601032025-12-30Plumbing2530 CHICAGO AVEThis scope of work includes: Tie-in connection to existing underground sanitary waste piping for the purpose of adding a 2" sanitary waste line and floor drain in room 065 of the
BLDG11567102025-12-17Plumbing800 28TH ST E
BLDG11551832025-12-05Plumbing800 28TH ST EInstall waste stand pipe and RPZ water line for new bone saw. Total job valuation: $20,100.00.
BLDG11383732025-11-03Mechanical / HVAC800 28TH ST EReplace existing boilers with new AHU in mechanical room. Remodel MRI-D with added piping, ductwork, accessories and equipment. BLDG1138373 New ducts and piping though out buil
BLDG11482842025-10-14Mechanical / HVAC916 28TH ST EInstall temporary natural gas piping for (14) temporary heaters for construction heat. Heaters range from 650,000 BTU to 2,500,000 BTUs. Total BTUs 2,950,000. Temp heat to be used
BLDG11380982025-09-25Plumbing2525 CHICAGO AVEFor state licensed facilities, such as hospitals, plan reviews are performed by the Minnesota Department of Labor and Industry (DOLI) rather than through our office. In addition, t
BLDG11380952025-09-24Mechanical / HVAC2525 CHICAGO AVEBLDG1138095 reroute ducts with new ducts for CT room and installing new vav as well as a new split system A/C
BLDG11381122025-09-18Mechanical / HVAC800 28TH ST ERework ductwork in ED CT and Mechanical equipment room. Replace VAV and add chilled water station with heat exchanger, pump and associated accessories per plans
BLDG11381082025-09-17Mechanical / HVAC800 28TH ST EReplace 7 GRD's
BLDG11381062025-08-28Plumbing800 28TH ST EDEMO SINK, INSTALL NEW FAUCET AND SINK
BLDG11383752025-08-28Plumbing800 28TH ST EInstall new domestic water to MRI-D expansion, along with (3) lavs and (1) mop-sink.
BLDG11381182025-08-28Plumbing800 28TH ST EAdd a floor sink
BLDG11292322025-08-07Mechanical / HVAC800 28TH ST E" Controls are not included in this permit. The controls contractor shall obtain a separate permit. " HVAC system, installing VAV boxes with hot water reheat coils, GRDs and all as
BLDG11267522025-07-24Mechanical / HVAC2525 CHICAGO AVEDry cooler addition and associated piping per approved plans.
BLDG11305802025-07-22Mechanical / HVAC818 DUNWOODY BLVDDuctwork modifications per approved plan.
BLDG11306062025-07-10Plumbing818 DUNWOODY BLVDInstall a single compartment sink and faucet. Install a wall water supply box.
BLDG11295212025-07-03Plumbing800 28TH ST Eabbott west. restrooms & drinking fountain
BLDG11160092025-05-13Mechanical / HVAC2545 CHICAGO AVERemodel MDB second floor, includes ducting, VAV's, hydronic piping to VAV coils as well as modification to FTB covers and demo. BLDG1116009
BLDG11160052025-05-02Plumbing2545 CHICAGO AVERemodel of MDB second floor including 2 new sink fixtures.
BLDG11139762025-04-25Plumbing2525 CHICAGO AVEAdd 2 vacuum breakers - 5th Fl PICU Department
BLDG11113972025-04-17Mechanical / HVAC800 28TH ST EBLDG1111397 3 new Data Center cooling systems. Data rooms are located on level 2,3, and 4 Ducted fan coils units. Condensers are located on the roof.
BLDG11072392025-03-17Mechanical / HVAC800 28TH ST ENew diffuser layout. BLDG1107239
BLDG11080112025-03-06Plumbing800 28TH ST EDemo (1) existing sink. Provide and install (1) new sink faucet and trim for integral sink.
BLDG11080102025-03-04Mechanical / HVAC800 28TH ST EReplacing GRDs and all associated ductwork per approved plans.
BLDG11033202025-01-29Mechanical / HVAC800 28TH ST EInstalling two VAV boxes, GRDs and all associated ductwork per approved plans.

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Minneapolis permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →