COMPANY RECORD · MINNEAPOLIS, MN

Je Dunn Construction — permit history in Minneapolis, MN

Je Dunn Construction appears on 110 Minneapolis permit records from 2017 through 2026, all of them general construction.

Permit categories

CategoryPermitsShare
General construction110100%

Activity by year

YearPermits issued
201710
20186
201915
202014
202117
202210
202317
20245
202511
20265

Busiest year on record: 2021, with 17 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
800 28TH ST E2026-07-30
2400 3RD AVE S #RAMP2026-04-20
1600 HENNEPIN AVE2026-03-30
730 8TH ST S2026-01-22
1300 HARMON PL2025-04-17
2800 10TH AVE S2025-02-27
1301 HENNEPIN AVE2024-04-30
913 26TH ST E2024-01-22
5916 PLEASANT AVE2023-11-20
800 WASHINGTON AVE N2023-08-31
401 CHICAGO AVE2023-07-20
107 3RD AVE N2023-05-30
803 26TH ST E2023-05-18
1325 QUINCY ST NE2023-05-09

31 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

110 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
BLDG11901322026-07-30General construction800 28TH ST ESELECTIVE DEMO ONLY, NO CONSTRUCTION - FLOORS 2, 3, 4, 5 2020 MSBC architect: 50240 - Klund, Jennifer Lynne @ HGA
BLDG11700182026-04-20General construction2400 3RD AVE S #RAMPstructural maintenance of parking ramp. engineer: Deiss #26604
BLDG11656132026-03-30General construction1600 HENNEPIN AVEWork includes adding two gypsum wall partitions with doors to separate the balcony from an adjacent hallway. Work area is located in the lower level mezzanine, directly below the s
BLDG11627712026-03-05General construction1600 HENNEPIN AVEREPAIR ROOF, STONE, INTERIOR & EXTERIOR, FLOORS, WINDOWS, ETC const type: IIB occupancy: A-3 2020 MSBC architect: 46544 - Lackovic, Virginia Alison @ HGA
BLDG11357802026-01-22General construction730 8TH ST Sremodel triage, care, waiting, and acute psychiatric intake areas on first floor. emergency department. certificate of occupancy required no 0 SAC per 8/20/25 MCES letter
BLDG11228042025-06-27General construction800 28TH ST Ealterations to replace emergency department CT machine and associated equipment. certificate of occupancy required no const type: 1a occupancy: I2 2020 MS
BLDG11191402025-05-29General construction800 28TH ST EREMODEL ON 1ST FLOOR FOR EQUIPMENT const type: II-B occupancy: I-2 2020 MSBC architect: 53825 - Abeln, Daniel Jonathon @ EAPC engineer: 23148 - Trofi
BLDG11169202025-05-29General construction800 28TH ST Eremodeling outpatient clinic areas of 3rd and 6th floor. piper neuro expansion. certificate of occupancy required no const type: 1a occupancy: B - outpatient cl
BLDG11114912025-04-25General construction2400 3RD AVE S #RAMPREPAIR PARKING STRUCTURE 2020 MSBC engineer: 26604 - Deiss, Michael Lee @ PALANISAMI
BLDG11098012025-04-17General construction1300 HARMON PLSite alterations and reroof of MCTC 17 Health Science Center. State delegated project.
BLDG11059742025-03-25General construction800 28TH ST Ealterations related to equipment upgrades for winter cooling. engineer: trofimova-peterson #23148
BLDG11030102025-02-27General construction2800 10TH AVE SREMODEL - STORAGE SPACE const type: IB occupancy: B 2020 MSBC architect: 53825 - Abeln, Daniel Jonathon
BLDG10957352025-02-05General construction2800 10TH AVE SNEW ROOFTOP CHILLER AND STRUCTURAL WORK. 1ST AND 4TH FLOOR. (JJL) TAF CHILLER ALLINA HEALTH ENGINEER: IRENETROFIMOVA-PETERSON #23148 ARCHITECT: DANIEL ABELN #53825 SPECIAL INS
BLDG11041432025-02-05General construction800 28TH ST Eremodel X-ray room C. certificate of occupancy required no const type: 1a occupancy: I2 2020 MSBC architect: daly
BLDG10976462025-02-04General construction2800 10TH AVE SAllina Health - New 2nd Floor Pharmacy certificate of occupancy required: no special inspections required: no SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATI
BLDG11007022025-01-02General construction2800 10TH AVE SBUILD 2 OFFICES ON 2ND FLOOR OF 10TH AVE FACILITY const type: IB occupancy: B 2020 MSBC architect: 53825 - Abeln, Daniel Jonathon
BLDG10834162024-10-07General construction800 28TH ST EReplace existing side hinged doors with new sliding glass doors and 90 minute rated overhead coiling door per drawings, the doors being replaced are not a required part of the mean
BLDG10850442024-10-07General construction800 28TH ST Eremodel nuclear medicine and uptake area on 2nd floor heart hospital building. certificate of occupancy required no const type: 1a occupancy: I2 2020 MSBC
BLDG10533522024-06-14General construction2400 3RD AVE S #RAMPSTRUCTURAL MAINTENANCE TO PARKING RAMP. (JJL) ENGINEER: MICHAEL DEISS #26604 SPECIAL INSPECTIONS: PALANISAMI AND ASSOCIATES
BLDG10498562024-04-30General construction1301 HENNEPIN AVESCIENCE BUILDING. AREAS D1 AND D2. RE-ROOF. NEW AIR HANDLING SYSTEM. MODIFY DUCTWORK. CMU WALLS. SEE SCOPE. (JJL) certificate of occupancy required: no special
BLDG10407662024-01-22General construction913 26TH ST Ealterations in emergency dept x-ray room.
BLDG10221882023-11-20General construction5916 PLEASANT AVEcreate 2 tenant spaces including a door to separate the spaces, the addition of an ADA lift, and modifications to two existing bathrooms. certificate of occupancy required: no
BLDG10075062023-09-14General construction1300 HARMON PLcomplete renovation of floors 1, 2, and 4 of the management education center. partial remodel of 3rd floor. extensive reroofing. certificate of occupancy required: no co
BLDG10007892023-08-31General construction800 WASHINGTON AVE NSTE 600/JE DUNN CONSTRUCTION OFFICE REMODELING certificate of occupancy required: no const type: 4 occupancy: B 2020 MSBC occupant load: 178 sprink
BLDG10104392023-08-07General construction2800 10TH AVE Sminor alteration on 2nd floor zone A for converting coat room into call room within conference center.
BLDG10035902023-07-20General construction401 CHICAGO AVEInstallation of new security fence and vehicular barriers around 3 sides of US Bank Stadium (4th St, 11th Ave, and 6th St) including 8' tall anti-climb fence, cable barrier, wedge
BLDG10006902023-06-30General construction913 26TH ST Eoffice remodeling - 2nd floor CV command center remodel. certificate of occupancy required: no const type: 1a occupancy: B 2020 MSBC sprinklered: yes
BLDG9936562023-05-30General construction107 3RD AVE NT/I BUILDOUT 2ND FLOOR - 'MUSE BUILDING' certificate of occupancy required: no special inspections required: no const type: III-B occupancy: B 202
BLDG9908112023-05-26General construction800 WASHINGTON AVE Nwindow well/retaining wall restoration and guardrail installation. engineer: malm
BLDG9917472023-05-24General construction2400 3RD AVE S #RAMPPARKING RAMP REPAIR. (JJL) ENGINEER: PALANISAMI AND ASSOC. - MICHAEL DEISS #26604 SPECIAL INSPECTIONS REQUIRED: BRAUN INTERTEC AND PALANISAMI AND ASSOC.
BLDG9967082023-05-24General construction913 26TH ST Eremodel of portions of the Histology Lab certificate of occupancy required: no const type: 1-A occupancy: I-2 2020 MSBC occupant load: no change s
BLDG9807272023-05-18General construction803 26TH ST ERevisions to Issued Building Permit BLDG897167 Provide 2-hour soffit enclosure for pipe run adjacent to (not through) an exit enclosure Central Utility Plant CONST TYPE: II-B
BLDG9865302023-05-09General construction1325 QUINCY ST NETenant improvement Suite C-1 certificate of occupancy required: no const type: 3-B occupancy: B 2020 MSBC occupant load: 81 sprinklered: yes
BLDG9841592023-03-01General construction913 26TH ST EREMOVE AND REINSTALL ROOM FINISHES TO INSTALL ENDOSCOPE CABINETS (MAA)
BLDG9814772023-02-06General construction913 26TH ST Elight remodel ANW surgery office certificate of occupancy required: no const type: 1-A occupancy: B 2020 MSBC occupant load: no change sprinklered
BLDG9795762023-01-26General construction913 26TH ST Emodification to an existing countertop Architect: J Klund #50240
BLDG9756582023-01-13General construction913 26TH ST ELAB CHEMISTRY EQUIPMENT AREA certificate of occupancy required: no const type: 2-B occupancy: B 2020 MSBC occupant load: no change sprinklered: yes
BLDG9571332023-01-12General construction2650 UNIVERSITY AVE SEconstruct 16 story 605 unit apartment building. certificate of occupancy required: yes Note: R2 Apartment with S2 parking garage and 1st floor space for future commercial occupanc
BLDG9696902022-12-05General construction913 26TH ST ERemodel 3rd and 4th Floor Bathrooms certificate of occupancy required: no special inspections required: no SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEAT
BLDG9696872022-11-15General construction913 26TH ST EDale Hall: Removal and replacement of Equipment in the NEURO-A procedure room. The building inspector must approve the restoration of fire rated assemblies disrupted by the work b
BLDG9655102022-10-11General construction913 26TH ST EINSTALL MEDICAL EQUIPMENT IN OR 10 AT LOWER LEVEL SURGEY AREA.(MAA) ENGR: BRAD KETTUEN 43460, JUSTIN THINER 48171
BLDG9592622022-09-29General construction913 26TH ST EINTERIOR REMODEL 6TH FLOOR certificate of occupancy required: no special inspections required: no const type: 1-A occupancy: B 2020 MSBC occupant loa
BLDG9492022022-06-30General construction2601 STEVENS AVEDemo Only - First Floor occupancy: B 2020 MSBC
BLDG9435392022-06-16General construction913 26TH ST EINTERIOR REMODEL OF PORTIONS OF 3RD AND 4TH FLOORS AT ABBOTT NORTHWESTERN. NEW FINISHES, RECONFIGURE OF SOME OFFICE AREAS, MECH AND ELEC WORK. PHASES INCLUDED ON THIS PERMIT ARE
BLDG9407512022-05-30General construction800 28TH ST EINTERIOR REMODEL OF EXISTING ENDOSCOPY ROOM ON 5TH FLOOR AT ABBOTT NORTHWESTERN HOSPITAL. NO STRUCTURAL WORK. (JJL) SOME WORK ON THE FLOOR UNDER BLDG908871. certificate of oc
BLDG9246002022-04-04General construction2600 PARK AVEInterior/Exterior Renovation certificate of occupancy required: no special inspections required: yes const type: 2B occupancy: A3/A2/B 2020 MSBC sprinklered:
BLDG9267902022-02-18General construction800 28TH ST EMinor alterations on 3rd floor - relocation of PEI pharmacy. certificate of occupancy required no const type: 1a occupancy: I1 2020 MSBC sprinklered: yes T
BLDG9241902022-02-01General construction800 28TH ST ELOWER LEVEL SURGERY AREA - PHASE I REMODELING certificate of occupancy required no special inspections required no const type: I-A occupancy: I-2 2020 MSB
BLDG9162752021-12-13General construction730 8TH ST SRestore fire rated exit enclosures and other construction related to the fire protection and electrical system work (ie remove replace fire pumps jockey pumps) The fire protection
BLDG9172772021-12-07General construction800 WASHINGTON AVE NINSTALL GUARD RAIL - RELATED TO BLDG904112 RETAINING WALL - engineer: BERNARD G. STROH - 14269 - occupancy: U construction type: V-B ----- ----- Issuance of this permit

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Minneapolis permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →