COMPANY RECORD · MINNEAPOLIS, MN

Schadegg Mechanical — permit history in Minneapolis, MN

Schadegg Mechanical appears on 460 Minneapolis permit records from 2016 through 2026, most often mechanical / hvac (62% of the record).

Permit categories

CategoryPermitsShare
Mechanical / HVAC28562%
Plumbing17538%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20162
201758
201858
201964
202066
202146
202240
202342
202435
202531
202618

Busiest year on record: 2020, with 66 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
200 6TH ST S2026-08-26
6077 JAMES AVE S2026-08-25
90 7TH ST S2026-08-21
80 8TH ST S2026-08-20
800 LASALLE AVE2026-08-19
550 4TH ST S2026-07-27
2225 WEST RIVER RD N2026-06-01
600 4TH ST S2026-05-06
1301 2ND AVE S2026-04-06
801 WASHINGTON AVE S #1042025-11-21
1525 4TH ST S2025-09-23
414 NICOLLET MALL2025-09-03
45 7TH ST S2025-08-15
3205 EXCELSIOR BLVD2025-07-14

112 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

460 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
BLDG11968702026-08-26Plumbing200 6TH ST SBuildout of 14th and 35th floors in the north tower. New restroom fixtures, new ADA restrooms, break room sinks, water coolers. Fixtures in 14th floor building restrooms already
BLDG11968492026-08-26Mechanical / HVAC200 6TH ST SBLDG1196849 Install 2 new cooling only FCU's. Modify distribution ducts on levels 14N and 35N, Place GRD's as needed. Replace supply fans on 4 existing air handles. Motors must co
BLDG11975052026-08-25Plumbing6077 JAMES AVE SUpdating existing cast iron stack, toilet waste, lav waste, and tub/shower waste to pvc. Changing tub to stand alone shower. Updating water lines to Pex A. Stack work between ceili
BLDG11973702026-08-21Plumbing90 7TH ST S47th floor replace wellness sink, dishwasher, ice maker, coffee maker,
BLDG11968712026-08-20Plumbing80 8TH ST SRemodel of building core restrooms on 36th Floor.
BLDG11967252026-08-19Mechanical / HVAC800 LASALLE AVE20th floor suite 2010. Low pressure duct re-work/reroute from existing FVAV's and VAV's, adding and relocating GRD's, relocating several thermostats, and adding exhaust fan for ven
BLDG11699812026-07-27Mechanical / HVAC550 4TH ST SInstallation of dry cooler on roof. There will be a penthouse heat exchanger and system pumps along with new piping to connect new systems to existing plant systems.
BLDG11890122026-07-21Mechanical / HVAC80 8TH ST SSuite 1850. Relocate 2 VAV.s. Add 4 linear diffusers. Relocate 5 2x2 diffusers. Add 4 RA grills BLDG1189012
BLDG11874022026-07-06Plumbing200 6TH ST Sus bank plaza in wall piping only restrooms
BLDG11848052026-06-17Plumbing800 LASALLE AVEAddition of a standpipe drain for fire suppression system
BLDG11821592026-06-01Plumbing2225 WEST RIVER RD NAddition of 1 new sink
BLDG11817272026-05-29Mechanical / HVAC80 8TH ST SReplace 7 diffusers and add 1 diffuser. Level 30 Madia Law. BLDG1181727
BLDG11802292026-05-15Plumbing800 LASALLE AVEPlumbing for new tenant. Install of (1) sink added to original scope under permit BLDG1154877.
BLDG11699822026-05-06Mechanical / HVAC600 4TH ST SHVAC system, installing dry cooler, heat exchanger and pumps to reject added heat to heating water loop by heat recovery chiller in shoulder season per approved plans.
BLDG11710142026-04-06Plumbing1301 2ND AVE SCustomer provided dishwasher, we are responsible to disconnect the existing dishwasher and reconnect the new. (water supply, drain)
BLDG11705092026-04-01Mechanical / HVAC80 8TH ST SRelocate one diffuser. Add 3 diffusers and seven RA grilles. Relocate diffusers and add R.A. grill in rooms 2245, 22050 B and 22050 C. R.A grills in Rooms 2245, 2249, 2250, and 22
BLDG11698842026-03-30Mechanical / HVAC80 8TH ST SInstalling new ductwork for main distribution and two VAV boxes per approved plans.
BLDG11560612026-01-22Mechanical / HVAC90 7TH ST SProvide (3) new FPVAVs. Revise distribution on existing devices. Provide new GRDs per plans. BLDG1156061
BLDG11563882025-12-11Mechanical / HVAC90 7TH ST SProvide and install 3 new supply branch ducts with new diffuses and air transfer grills for phone rooms. Additionally, adding new air transfers and linear diffusers for private off
BLDG11543632025-12-05Mechanical / HVAC800 LASALLE AVESuite 825 Revise diffuser locations on (4) VAVs and (3) FPV Work includes relocating VAV's and t-stats. BLDG1154363
BLDG11548772025-11-25Plumbing800 LASALLE AVEPlumbing for new spec suite. Install of (1) sink.
BLDG11545082025-11-21Plumbing801 WASHINGTON AVE S #104electric water heater
BLDG11532702025-11-13Mechanical / HVAC80 8TH ST SHVAC alterations adding one VAV boxe to suit the new floor layout, GRDs, and all associated ductwork per approved plans.
BLDG11438132025-09-23Mechanical / HVAC1525 4TH ST SProvide 11 new diffusers and 6 new returns. BLDG1143813
BLDG11407662025-09-18Mechanical / HVAC80 8TH ST SHVAC alterations include modifying the existing distribution system through the current air handling unit, adding VAV boxes, one water source heat pump to suit the new floor layout
BLDG11423582025-09-12Plumbing80 8TH ST STenant build out of vacant space on 43rd floor. Break room and mother's room.
BLDG11378932025-09-03Mechanical / HVAC414 NICOLLET MALLBLDG1137893 tenant improvement project for the entire fourth floor of 414 Nicollet Mall building. Mechanical piping scope includes heating water piping to VAV and FPVAV boxes. Du
BLDG11350662025-08-26Mechanical / HVAC414 NICOLLET MALLHVAC alterations include modifying the existing distribution system through the current air handling units, installing new fan-powered and VAV boxes to suit the new floor layout, a
BLDG11378922025-08-21Plumbing414 NICOLLET MALLTenant improvement project for the 4th floor of 414 Nicollet Mall building. Scope of project is the entire floor of the building.
BLDG11348922025-08-15Mechanical / HVAC45 7TH ST SHVAC system, relocating 5 diffusers and one transfer fan and adding RA grilles per approved plans.
BLDG11311412025-07-14Plumbing3205 EXCELSIOR BLVDGas lines for (2) patio fire pits.
BLDG11277712025-07-02Plumbing200 6TH ST S #288Scope includes minor remodel to existing kitchen for new Cardigan Donuts location. Includes beer cooler, dipper well, ice/water station, refrigerated well, glass rinser, 2 new sink
BLDG11254662025-06-20Mechanical / HVAC80 8TH ST SInstalling GRDs and all associated ductwork per approved plans.
BLDG11227692025-06-05Mechanical / HVAC80 8TH ST SModify distribution on (3) existing VAVs. Provide all new GRDs including(12) diffusers and (6) RAGs.
BLDG11157122025-05-29Mechanical / HVAC1518 CHESTNUT AVE WHVAC system for 4 stories office building plus a parking garage space. Installing of air handling units, energy recovery ventilators, exhaust fans, make-up air unit, split systems,
BLDG11157222025-05-29Plumbing1518 CHESTNUT AVE WXcel/Install plumbing systems in new building All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Code (MSPC), Chapter 4714. All pipe, pipe
BLDG11181222025-05-15Mechanical / HVAC800 NICOLLET MALLHVAC alterations include modifying the existing distribution system through the current air-handling units, reusing existing fan-powered and VAV boxes to suit the new floor layout,
BLDG11181262025-05-15Mechanical / HVAC100 WASHINGTON AVE SHVAC system, adding new VAV box, GRDS and associated ductwork per approved plan.
BLDG11154632025-05-01Mechanical / HVAC200 6TH ST SReplace (2) air handling unit fans with new fan arraysReplace (4) vaneaxial fans with new fan arrays
BLDG11118322025-04-04Plumbing3205 EXCELSIOR BLVD #MINIKAHDA RESTROOM FIXTURES - Renovation of existing restrooms to add (2) showers.
BLDG11099972025-03-20Plumbing614 MCKINLEY PLFOR BIOTECHNE - WATER HEATERS: Remove two existing water heaters and storage tank and replace with (2) State SUF100 tank style water heaters
BLDG10926232025-03-18Mechanical / HVAC2103 WEST BROADWAYBLDG1092623 Alternate mechanical work is not included under this permit application. commercial kitchen work is included in mechanical scope of work. BLDG1078453
BLDG11030022025-02-13Mechanical / HVAC80 8TH ST SHydronic piping for new AHU, VAV and FCU installations on Skyway Level for Associated Bank per approved plans
BLDG11030042025-02-11Plumbing80 8TH ST SFOR SKYWAY/ASSOCIATED BANK - PLUMBING FIXTURES - Buildout of vacant space on skyway level for Associated Bank. New Restrooms, janitor closet and break room
BLDG11058572025-02-07Mechanical / HVAC801 NICOLLET MALLProvide 3 new VAV's. Provide transfer fan for server room. Modify HVAC per plans BLDG1105857
BLDG11042032025-01-28Plumbing801 NICOLLET MALLBreak room, ADA restroom, Mother's Room. Remodel existing restrooms
BLDG11030002025-01-23Mechanical / HVAC80 8TH ST SInstalling new air handling unit, 13 VAV boxes, exhaust fans, GRDs and all associated ductwork per approved plans.
BLDG10926682025-01-21Plumbing2103 WEST BROADWAYFOR NEON FOOD INCUBATOR - NEW BUILDING PLUMBING FIXTURES request for plans sent 2024-11-07 - lea rfi sent 2024-11-15 - lea
BLDG11023942025-01-14Plumbing3205 EXCELSIOR BLVD #MINIKAHDA minikahda club pool cafe 2 beverage stations
BLDG11006302024-12-23Plumbing1601 WEST RIVER RD NPlumbing work associated with cleanroom expansion. Installing floor sinks, handwash stations and a sink.

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Minneapolis permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →