COMPANY RECORD · MINNEAPOLIS, MN
Gardner Builders — permit history in Minneapolis, MN
Gardner Builders appears on 535 Minneapolis permit records from 2016 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 535 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2016 | 6 |
| 2017 | 70 |
| 2018 | 65 |
| 2019 | 77 |
| 2020 | 68 |
| 2021 | 42 |
| 2022 | 42 |
| 2023 | 58 |
| 2024 | 35 |
| 2025 | 48 |
| 2026 | 24 |
Busiest year on record: 2019, with 77 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 801 NICOLLET MALL | 2026-09-23 |
| 100 WASHINGTON AVE S | 2026-09-17 |
| 1001 3RD AVE S | 2026-09-10 |
| 701 WASHINGTON AVE N | 2026-09-02 |
| 90 7TH ST S | 2026-08-27 |
| 800 NICOLLET MALL | 2026-08-21 |
| 80 8TH ST S | 2026-07-16 |
| 590 PARK AVE | 2026-07-13 |
| 800 LASALLE AVE | 2026-05-04 |
| 550 4TH ST S | 2026-04-21 |
| 901 3RD AVE S | 2026-04-16 |
| 60 6TH ST S | 2026-03-31 |
| 250 NICOLLET MALL | 2026-03-27 |
| 2125 HENNEPIN AVE E | 2026-03-24 |
142 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Modern Heating & Air Conditioning LLC | 64 | 2016–2026 |
| Schadegg Mechanical | 38 | 2016–2026 |
| Crawford Merz LLC | 32 | 2016–2026 |
| Greiner Construction | 29 | 2016–2026 |
| Cool Air Mechanical Inc | 28 | 2016–2026 |
| Hayes Mechanical LLC | 26 | 2016–2026 |
| Warners Stellian Co Inc | 24 | 2016–2026 |
| Kraft Mechanical | 22 | 2016–2026 |
Companies that also appear in Minneapolis permit records at addresses where Gardner Builders filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
535 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| BLDG1163526 | 2026-09-23 | General construction | 801 NICOLLET MALL | REMODEL CORRIDOR, 18th FLOOR const type: IA occupancy: B 2020 MSBC sprinklered: YES architect: 23558 - Walz, Jeffrey Lee @ GENSLER | |
| BLDG1198726 | 2026-09-17 | General construction | 100 WASHINGTON AVE S | SUITE 1306 SPEC SUITE BUILD OUT FOR FUTURE TENANT. NO STRUCTURAL WORK. (JJL) certificate of occupancy required: no special inspections required: no const type: | |
| BLDG1198727 | 2026-09-16 | General construction | 100 WASHINGTON AVE S | Build out spec suite for future tenant -ACW certificate of occupancy required: no special inspections required: no const type: IA occupancy: B 2020 | |
| BLDG1181293 | 2026-09-10 | General construction | 1001 3RD AVE S | Expansion of data center space to 3rd and 4th Floors and roof top mechanical upgrades. certificate of occupancy required: yes special inspections required: yes const ty | |
| BLDG1195667 | 2026-09-02 | General construction | 701 WASHINGTON AVE N | Office remodel -ACW certificate of occupancy required: no special inspections required: no const type: IIB occupancy: B 2020 MSBC occupant load: | |
| BLDG1181687 | 2026-08-27 | General construction | 90 7TH ST S | New Restaurant Tenant - 1st Floor - Bellcour CERTIFICATE OF OCCUPANCY REQUIRED - AN AUTHORIZED REPRESENTATIVE OF THE PERMIT APPLICANT MUST CALL 612-673-2327 TO SCHEDULE A CERTIF | |
| BLDG1189923 | 2026-08-21 | General construction | 800 NICOLLET MALL | Tenant remodel - Suite 207 - Green and the Grain certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2 | |
| BLDG1192244 | 2026-08-10 | General construction | 100 WASHINGTON AVE S | Remodel portion of tenant space -ACW certificate of occupancy required: no special inspections required: no const type: IA occupancy: B 2020 MSBC | |
| BLDG1187471 | 2026-07-16 | General construction | 80 8TH ST S | Tenant improvement -ACW certificate of occupancy required: no special inspections required: no const type: I-A occupancy: B 2020 MSBC occupant l | |
| BLDG1181534 | 2026-07-13 | General construction | 590 PARK AVE | Remodel Locker Room certificate of occupancy required: no special inspections required: no const type: 1A occupancy: I-3, condition 4 2020 MSBC sprinkle | |
| BLDG1178926 | 2026-05-11 | General construction | 90 7TH ST S | DEMO ONLY. NO CONSTRUCTION. (JJL) 1ST AND 2ND FLOOR. ARCHITECT: SHEA - DAVID SHEA #12982 | |
| BLDG1173318 | 2026-05-04 | General construction | 800 LASALLE AVE | SUITE 825. TENANT REMODEL. NO STRUCTURAL WORK. (JJL) Tenant interior remodel. NOTE: BLDG1150103 is the original permit number. Scope changed from spec suite to tenant build out | |
| BLDG1173489 | 2026-04-27 | General construction | 1001 3RD AVE S | (DMH-Pdox) INTERIOR DEMO ONLY TO 3RD & 4TH FLOORS. - 2020 MNSBC Architect: BRIAN BAILEY, #63902 (Palanisami Assoc) APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE IN | |
| BLDG1166988 | 2026-04-21 | General construction | 550 4TH ST S | Office Remodel 10th Floor certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC sprinklered: y | |
| BLDG1168922 | 2026-04-16 | General construction | 901 3RD AVE S | remodel of level 3 south - office conferencing center. certificate of occupancy required: no const type: 1a occupancy: A3, B 2020 MSBC occupant load: | |
| BLDG1169369 | 2026-04-02 | General construction | 701 WASHINGTON AVE N | T/I - 6TH & 7TH FLOOR const type: IB occupancy: B 2020 MSBC occupant load: 71 (6TH), 80 (7TH) architect: 57258 - Eder, Jared Michael @ STUDIO BV | |
| BLDG1169360 | 2026-03-31 | General construction | 60 6TH ST S | Remodel existing office space -ACW certificate of occupancy required: no special inspections required: no occupancy: B 2020 MSBC sprinklered: yes | |
| BLDG1166195 | 2026-03-27 | General construction | 250 NICOLLET MALL | RBC wealth management. office remodel - 19 West 32 certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2 | |
| BLDG1166194 | 2026-03-27 | General construction | 250 NICOLLET MALL | RBC wealth management. office remodel - 17 West 25 certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2 | |
| BLDG1168940 | 2026-03-24 | General construction | 2125 HENNEPIN AVE E | T/I 3RD FLOOR - REMOVE UN-RATED & NON-STRUCTURAL WALLS 2020 MSBC | |
| BLDG1165323 | 2026-03-12 | General construction | 90 7TH ST S | Remodel of 32nd floor common corridor, elevator lobby and restrooms certificate of occupancy required: no special inspections required: no const type: 1A occupancy | |
| BLDG1166442 | 2026-03-05 | General construction | 1001 3RD AVE S | electrical room expansion for switching equipment upgrades - 1st floor. certificate of occupancy required: no const type: 1a 2020 MSBC sprinklered: y | |
| BLDG1160050 | 2026-02-05 | General construction | 225 6TH ST S | T/I 'WINTHROP & WEINSTINE' - SUITE 3500 const type: IA occupancy: B 2020 MSBC occupant load: 835 (38 + 100 + 100 + 159 + 97 + 242 + 99, FLOORS 31 - 37) spr | |
| BLDG1156361 | 2026-01-28 | General construction | 3815 SUNNYSIDE AVE | Interior Remodel certificate of occupancy required: no special inspections required: no const type: VB occupancy: M 2020 MSBC sprinklered: yes sac: | |
| BLDG1155435 | 2025-12-18 | General construction | 90 7TH ST S | 39TH FLOOR. TENANT IMPROVEMENT REMODEL. NO STRUCTURAL WORK. NO CHANGE TO EXITING. (JJL) certificate of occupancy required: NO special inspections required: NO const | |
| BLDG1151085 | 2025-12-09 | General construction | 50 6TH ST S | LOBBY RENOVATION AT LEVEL 1 AND LEVEL 2. STRUCTURAL WORK IS NOT INCLUDED WITH THIS PERMIT. (JJL) *********A STEEL STRUCTURAL FRAME IS REQUIRED TO SUPPORT MONITORS/DISPLAYS. THIS | |
| BLDG1148603 | 2025-12-04 | General construction | 1100 FRANKLIN AVE E | FOUNDATION WATERPROOFING ON NORTH SIDE OF BUILDING. NEW STOOP AND FOOTINGS. (JJL) | |
| BLDG1152540 | 2025-12-01 | General construction | 90 7TH ST S | Tenant improvement remodel level 29 -ACW certificate of occupancy required: no special inspections required: no const type: occupancy: B 2020 MS | |
| BLDG1153741 | 2025-12-01 | General construction | 800 NICOLLET MALL | office remodeling of suite 2850. certificate of occupancy required: no const type: 1a occupancy: b 2020 MSBC sprinklered: yes sac: _0_ charges | |
| BLDG1152586 | 2025-11-26 | General construction | 420 5TH ST N | Remove open stair between level 3 and 4, infill opening -ACW certificate of occupancy required: no special inspections required: no const type: IB occupanc | |
| BLDG1153737 | 2025-11-26 | General construction | 800 NICOLLET MALL | Demo only (for office build out under separate permit) -ACW certificate of occupancy required: no special inspections required: no 2020 MSBC Floor(s): 28th ar | |
| BLDG1123900 | 2025-11-25 | General construction | 601 1ST AVE N | Interior Renovation - Levels 1, 4, 6, & 21 certificate of occupancy required: no special inspections required: no const type: 1-A occupancy: R-1 2020 MS | |
| BLDG1154259 | 2025-11-25 | General construction | 525 PORTLAND AVE | Remove window film on rooms 573, 574, 581, 582, 583, 584. Install new film on 574, 581, & 583. occupancy: B 2020 MSBC sprinklered: yes | |
| BLDG1150103 | 2025-11-21 | General construction | 800 LASALLE AVE | T/I SUITE 825 const type: IA occupancy: B 2020 MSBC occupant load: 54 sprinklered: YES energy code chapter used: ASHRAE 90.1-2019 architect: 6359 | |
| BLDG1153299 | 2025-11-19 | General construction | 901 3RD AVE S | Demo Only - 3rd Floor South const type: 1A occupancy: B 2020 MSBC sprinklered: yes architect: Jared Eder #57258 | |
| BLDG1147284 | 2025-11-13 | General construction | 2800 CHICAGO AVE | Clinic Remodel - Suite 250 certificate of occupancy required: no special inspections required: no const type: 1-B occupancy: B 2020 MSBC sprinklered: y | |
| BLDG1149885 | 2025-10-30 | General construction | 531 PARK AVE | REPLACE WINDOWS. (JJL) ARCHITECT: HA+D - MARCUS HUMLER #52841 TYPE IIB CONSTRUCTION FULLY SPRINKLERED OCCUPANCY TYPE: B, S2, A3 NO CHANGE TO OCCUPANCY COUNT BASEMENT AREA = | |
| BLDG1137563 | 2025-10-30 | General construction | 80 8TH ST S | #300. INTERIOR REMODEL. (JJL) certificate of occupancy required: no special inspections required: no const type: I-A occupancy: B 2020 MSBC | |
| BLDG1132428 | 2025-10-28 | General construction | 801 NICOLLET MALL | REMODEL SUITE 1825 const type: IA occupancy: B 2020 MSBC architect: 17408 - Hustad, Mary B @ NELSON SAC (0 charges) 250725D2 | |
| BLDG1149612 | 2025-10-28 | General construction | 225 6TH ST S | remodel office suite 1800. 18th floor. certificate of occupancy required: no const type: 1a occupancy: b 2020 MSBC sprinklered: yes sac: __ charges | |
| BLDG1148247 | 2025-10-20 | General construction | 530 CHICAGO AVE | REPAIR AND MODIFY EXISTING EXTERIOR ADA RAMP AND EXTERIOR STAIR UPGRADES. (JJL) FORENSIC SCIENCES BUILDING ARCHITECT: HA+D - MARCUS HULMER #52841 | |
| BLDG1139832 | 2025-09-05 | General construction | 901 MARQUETTE AVE | INTERIOR REMODEL. (JJL) certificate of occupancy required: no special inspections required: no const type: I-A occupancy: B 2020 MSBC occupan | |
| BLDG1134201 | 2025-09-03 | General construction | 60 6TH ST S | Remodel of existing office space -ACW certificate of occupancy required: no special inspections required: no const type: 1-A occupancy: B 2020 | |
| BLDG1137347 | 2025-08-29 | General construction | 311 7TH AVE N | T/I - SUITE 300 "SHOREVIEW INDUSTRIES" const type: IIB occupancy: B 2020 MSBC occupant load: 76 sprinklered: YES architect: Batcheller, Kim M. - 53229 | |
| BLDG1123941 | 2025-08-13 | General construction | 1500 JACKSON ST NE | CHANGE OF OCCUPANCY. BUILDING 10. (JJL) certificate of occupancy required yes special inspections required yes BRAUN INTERTEC const type: III-B occupancy: F | |
| BLDG1128803 | 2025-07-21 | General construction | 420 5TH ST N | Suite 100 Levels 2 & 3 - Partial Renovation certificate of occupancy required: no special inspections required: no SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, | |
| BLDG1124241 | 2025-07-01 | General construction | 706 2ND AVE S | REMODEL ELEVATOR LOBBY 2020 MSBC architect: 12982 - Shea III, David A @ SHEA | |
| BLDG1122655 | 2025-06-30 | General construction | 700 NICOLLET MALL | 10th Floor/Suite C - Spec Suite Remodel certificate of occupancy required: no special inspections required: no const type: 1B occupancy: B 2020 MSBC | |
| BLDG1121866 | 2025-06-30 | General construction | 800 LASALLE AVE | Interior remodel to combine two existing office suites on 16th floor -ACW certificate of occupancy required: yes special inspections required: no const type: I-A | |
| BLDG1125507 | 2025-06-27 | General construction | 1001 3RD AVE S | minor alterations due to mechanical/electrical/plumbing upgrades. 5th floor service order 1. |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Search these records
The 535 permits above are a static record through 2026. Select a year above to open that year’s records, or search Gardner Builders in Minneapolis, MN by address, trade or date range.
Source and limits
Public Minneapolis permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.