COMPANY RECORD · MINNEAPOLIS, MN

Kraus Anderson Construction Co. — permit history in Minneapolis, MN

Kraus Anderson Construction Co. appears on 27 Minneapolis permit records from 2017 through 2026, all of them general construction.

Permit categories

CategoryPermitsShare
General construction27100%

Activity by year

YearPermits issued
20171
20184
20198
20201
20213
20222
20232
20242
20252
20262

Busiest year on record: 2019, with 8 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
2426 WEST BROADWAY2026-06-29
3414 47TH ST W2026-04-13
730 8TH ST S2025-10-14
900 8TH ST S2025-02-18
716 7TH ST S2024-08-20
350 5TH ST N2024-03-18
608 2ND AVE S2023-05-09
1500 JAMES AVE N2023-04-14
650 PORTLAND AVE2022-12-06
1101 3RD ST S2021-10-18
1014 3RD ST S2021-07-16
615 8TH ST S2020-03-18
200 5TH ST S2019-12-03
2925 CHICAGO AVE2019-11-22

22 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

27 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
BLDG11841302026-06-29General construction2426 WEST BROADWAYreception desk remodel in entry lobby.
BLDG11502922026-04-13General construction3414 47TH ST WRE-ROOF FLAT ROOF WITH STRUCTURAL ALTERATIONS (MECHANICAL AND ELECTRICAL UNDER SEPARATE PERMITS) 2020 MSBC architect: 53046 - Anderson, Eric Elroy @ ATSR engineer: 21387
BLDG11394692025-10-14General construction730 8TH ST Ssecurity upgrades at 5 entries. purple 1 entry, purple 2 skyway entry, red CSC skyway entry, blue 1 entry, and CSC main building level 1 entry. certificate of occupancy required
BLDG11038632025-02-18General construction900 8TH ST SReplace exterior metal curtainwall system certificate of occupancy required: no SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING/AIR CONDITIONING/VENTILATION WOR
BLDG10740032024-08-20General construction716 7TH ST S4th floor secondary operating rooms alterations for AHU upgrades. certificate of occupancy required no special inspections required yes const type: 1b occupancy:
BLDG10434302024-03-18General construction350 5TH ST Nbuildout offices on 8th floor. single tenant. certificate of occupancy required: yes - first tenant in new building const type: 1a occupancy: b 2020 MSBC
BLDG9617062023-05-09General construction608 2ND AVE SConvert office building to 216 dwelling units and shelled tenant spaces that will require their own C of Os 10/11/23 approved post-issue revisions including engineering judgement
BLDG9629702023-04-14General construction1500 JAMES AVE NNorth High School Phase 2 Addition and Renovation certificate of occupancy required: no special inspections required: yes const type: 1A occupancy: E
BLDG9668202022-12-06General construction650 PORTLAND AVEORIGINAL PERMIT IS BLDG893946 THIS PERMIT CREATED FOR NEW ENERGY MODEL. SEE ATTACHED. (JJL) R1 UNITS = 12. R2 UNITS = 222. 14,135 SF OF COMMERCIAL SPACE. 1 LEVEL OF PARKI
BLDG9495142022-09-01General construction1500 JAMES AVE NPhase 1 of Addition and renovations to North High School certificate of occupancy required: no special inspections required: yes const type: 1A occupancy: E
BLDG9101962021-10-18General construction1101 3RD ST SADDING STEEL PLATFORM AROUND EXISTING ROOF TOP EQUIPMENT FOR MAINTENANCE. (JJL) ENGINEER: BKBM - MAGNUS CARLSSON #44685 SPECIAL INSPECTIONS ARE REQUIRED: CONCRETE CONSTRUCTION TA
BLDG8939462021-09-21General construction650 PORTLAND AVER1 UNITS = 12. R2 UNITS = 222. 14,135 SF OF COMMERCIAL SPACE. 1 LEVEL OF PARKING BELOW BUILDING WHICH CONNECTS TO ADJACENT THRIVENT BUILDING. LEVEL 1 IA RETAIL, DAYCARE, SOME A
BLDG8933642021-07-16General construction1014 3RD ST SREPLACE FRONT STAIR & RAMP // "SHERWIN WILLIAMS" // PDR PLAN12783 ----- architect: ROGER CHRISTENSEN - 23865 engineer, structural: ANTHONY M. RADTKE - 48023 ----- occupancy: B
BLDG8084682020-03-18General construction615 8TH ST SConstruct new 341 Unit apartment building work in addition to BLDG768026 certificate of occupancy required: yes Note: R2 Apartment with S2 (enclosed or open) parking garage an
BLDG8075732019-12-03General construction200 5TH ST SFLAT ROOFING ON ALL LEVELS. Remove existing to deck. Install new tapered insul and new 4 ply built up roofing. Architect Olson #25458 Struct engineer A.M. Structural Engineering
BLDG8069332019-11-22General construction2925 CHICAGO AVEREPLACE WINDOWS AND WALL WITH BULLET PROOF WALL AND GLAZING IN NON RATED WALL AT MAIN LEVEL (MAA) ARCHITECT DANIELE ADELN 53825
BLDG8022742019-10-29General construction800 28TH ST Ealterations to parking structure office to allow for new customer pay station. sck
BLDG7630622019-08-12General construction240 PARK AVEMixed use high rise development... certificate of occupancy IS required: ... R2 Apartment (204 Units) with S2 enclosed parking garage and 1st floor space for future commercial occu
BLDG7668902019-07-30General construction200 5TH ST SREMOVING CROWN OFF OF BUILDING. WILL BUILD/MODIFY EXISTING BUILDING IN ORDER TO SUPPORT TEMPORARY CRANE LOAD. REVIEW FRAMING BUILT. SEE ENGINEERS PLANS. EXISTING STRUCTURE ANALYZED
BLDG7795192019-07-23General construction1028 3RD ST SALL READY TO GO BELOW. SHERWIN WILLIAMS SHOP BUILD OUT. DEMO IN SPACE. ADDING DOORS. NOT CHANGING EXITING. FULLY SPIRNKLED. (JJL) certificate of occupancy required: yes **********
BLDG7629582019-04-26General construction720 WASHINGTON AVE SENon-structural interior remodel of 2nd and 3rd floors. No change in occupancy. 3 story Construction II-B fully sprinkler. No SAC. Architect Evenson 49637. ...As noted on approved p
BLDG7645362019-04-16General construction1301 2ND AVE Sremodel administrative boardroom certificate of occupancy required: no mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submi
BLDG7252932018-09-19General construction1008 1/2 3RD ST Sremodel and change of occupancy from single family dwelling to office space first and second floors. sck#1 certificate of occupancy required: yes const type: 5b occup
BLDG7191082018-08-02General construction3001 BROADWAY ST NEDEMO AND REMODEL TO 1,868 S.F MAIN LEVEL TENANT SPACE. INSTALL NEW PARTITION WALLS FOR 5 OFFICES AND EMPLOYEE KITCHEN. NO CHANGE IN EXIT. (DMH#2) Const type: II-B Occup
BLDG6853342018-07-20General construction1028 3RD ST SREMODELWEATHER SIMULATION LAB SPACE ON FIRST FLOOR. SCK#1 certificate of occupancy required: no sprinklered: yes Tenant: SHERWIN WILLIAMS sac: _2_charges met council
BLDG6890722018-02-02General construction817 5TH AVE STenant build out certificate of occupancy required YES mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ speci
BLDG6853332017-11-17General construction1028 3RD ST SDEMO approx. 3 x 45 floor section in prep for future trench drain

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Minneapolis permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →