COMPANY RECORD · CHICAGO, IL
The George Sollitt Const. Co. — permit history in Chicago, IL
The George Sollitt Const. Co. appears on 40 Chicago permit records from 2013 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 40 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2013 | 1 |
| 2014 | 2 |
| 2015 | 2 |
| 2016 | 2 |
| 2017 | 1 |
| 2018 | 2 |
| 2019 | 2 |
| 2020 | 11 |
| 2021 | 2 |
| 2022 | 3 |
| 2024 | 2 |
| 2025 | 8 |
| 2026 | 2 |
Busiest year on record: 2020, with 11 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Sharlen Electric Company | 9 | 2020-12-08 |
| C. R. Leonard Plumbing And | 7 | 2020-12-08 |
| Atomatic Mechanical | 7 | 2020-12-08 |
| Public Electric Construction | 6 | 2025-05-07 |
| R. Carrozza Plumbing Co | 5 | 2020-04-06 |
| Terry Plumbing A Matrix Holdin | 5 | 2026-08-07 |
| Mg Mechanical | 4 | 2025-10-22 |
| Autumn Construction Services | 4 | 2026-08-07 |
| Candor Electric, Inc. | 3 | 2025-05-09 |
| Norman Mechanical | 3 | 2025-07-18 |
| Chicago Area Plumbing Incorp | 3 | 2025-05-09 |
| May Aire Htg/Cooling | 3 | 2020-04-06 |
53 companies are named alongside The George Sollitt Const. Co. on the same Chicago permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 3625 S HOYNE AVE | 2026-08-07 |
| 810 E 103RD ST | 2026-04-21 |
| 4442 S CICERO AVE | 2025-10-22 |
| 4809 W 44TH ST | 2025-10-16 |
| 2611 N LOCKWOOD AVE | 2025-07-18 |
| 2745 W ROOSEVELT RD | 2025-05-28 |
| 7342 S HOYNE AVE | 2025-05-09 |
| 1632 W WRIGHTWOOD AVE | 2025-05-07 |
| 2347 S WABASH AVE | 2025-04-15 |
| 1326 W 14TH PL | 2024-01-04 |
| 9625 S LONGWOOD DR | 2022-10-21 |
| 4720 S ST LOUIS AVE | 2022-07-13 |
| 2345 S CHRISTIANA AVE | 2022-04-08 |
| 6100 W FULLERTON AVE | 2021-08-16 |
28 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $25,000 to $46,770,000, median $3,702,500. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
40 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 101086199 | 2026-08-07 | General construction | 3625 S HOYNE AVE | SELF-CERT 2019 CBRC: WORK RELATED TO THE INSTALLATION OF BOILERS AND NEW INCOMING SERVICES. MINOR ARCHITECTURAL RENOVATIONS TO ACCOMODATE MEP SCOPE | $1,000,000 |
| 101080581 | 2026-04-21 | General construction | 810 E 103RD ST | SPR 2019 CBRC: CPS GATELY PARK STADIUM RENOVATION TO INCLUDE REPLACEMENT OF THE TURF SURFACE, PARTIAL ASPHALT AND CONCRETE PAVEMENT REPLACEMENT, NEW 10FT ORNAMENTAL FENCE, 15FT & 2 | $6,130,000 |
| 101061910 | 2025-10-22 | General construction | 4442 S CICERO AVE | DDS / 2019 CBC: NEW CONSTRUCTION OF A 6-STORY RESIDENTIAL BUILDING (73 DWELLING UNITS) TO INCLUDE 40 BIKE SPACES AS PER PLANS. (OCCUPANCY GROUP: R-2 / TYPE II-A CONSTRUCTION) CONSU | $29,936,000 |
| 101061913 | 2025-10-16 | General construction | 4809 W 44TH ST | DDS/ 2019 CBC: NEW CONSTRUCTION OF A 6-STORY RESIDENTIAL BUILDING (110 DWELLING UNITS), AT-GRADE PARKING LOT (134 AUTO SPACES + 40 BIKE SPACES) AND ASSOCIATED SITE WORK AS PER PLAN | $46,770,000 |
| 101068664 | 2025-07-18 | General construction | 2611 N LOCKWOOD AVE | SPR 2019 CBC: REVISION TO PERMIT 101031656 TO RECONFIGURE RESTROOMS FROM (2) FAMILY RESTROOMS AND (1) MULTI-USER GENDER NEUTRAL RESTROOM TO (1) FAMILY RESTROOM, (1) MULTI-USER WOME | $5,113,000 |
| 101062879 | 2025-05-28 | General construction | 2745 W ROOSEVELT RD | SPR 2019: INTERIOR DEMOLITION, RENOVATION, ROOF REPLACEMENT, AND EXTERIOR PLAYGROUND REFINISHING OF 73,445SF ELEMENTARY SCHOOL, TWO STORIES ABOVE GRADE AND PARTIAL BASEMENT (OCCUPA | $8,930,000 |
| 101064883 | 2025-05-09 | General construction | 7342 S HOYNE AVE | SPR 2019 CBRC - ALTERATIONS AT GROUND FLOOR INTERIOR OF EXISTING 2 STORY BUILDING FOR NEW GARDEN, PLUMBING & ELECTRICAL CONNECTIONS (INCLUDES 1 STORY WOOD TYPE VB STORAGE SHED, 1 | $2,064,000 |
| 101064144 | 2025-05-07 | General construction | 1632 W WRIGHTWOOD AVE | SPR 2019 CBC FOUNDATION FOR CHICAGO PUBLIC SCHOOL PHASED FOUNDATION WORK FOR 3,037 SF; 4-STORY ADDITION - NO CHANGE IN USE. RELATED TO SEPARATE FULL PERMIT 101064064. NO EXTERIOR | $2,622,000 |
| 101064064 | 2025-05-07 | General construction | 1632 W WRIGHTWOOD AVE | SPR 2019 CBC: STANDARD BUILDING PERMIT FOR CHICAGO PUBLIC SCHOOL, 62 FEET HIGH, 4 STORY EXISTING SCHOOL + ADDITION - NO CHANGE IN USE. THIS PERMIT IS RELATED TO FOUNDATION PERMIT 1 | $2,622,000 |
| 101062477 | 2025-04-15 | General construction | 2347 S WABASH AVE | SC 2019 CBRC: CHICAGO PUBLIC SCHOOLS - RENOVATION OF AN EXISTING 4-CLASSROOM CHICAGO PUBLIC SCHOOLS MODULAR BUILDING, MINOR SITE WORK | $3,000,000 |
| 101031656 | 2024-05-29 | General construction | 2611 N LOCKWOOD AVE | SPR 2019 CBC: FULL BUILDING PERMIT FOR 1 STORY CHICAGO PARK DISTRICT FIELDHOUSE (OCCUPANCY GROUP A-3, TYPE IIB CONSTRUCTION). CURRENT USE IS 1 STORY FIELDHOUSE (OCCUPANCY GROUP A-3 | $5,113,000 |
| 101019750 | 2024-01-04 | General construction | 1326 W 14TH PL | CPS SCHOOL - NO CHANGE IN USE. SC 2019 CBC: INTERIOR ALTERATIONS OF CLASSROOMS AND OFFICES FOR CPS NETWORK 15 OFFICES; NO CHANGE TO DEMISING WALLS OR PATH OF EGRESS (OCC E-1, CONST | $400,000 |
| 100901911 | 2022-10-21 | General construction | 9625 S LONGWOOD DR | SPR 2019 CBRC: INTERIOR ALTERATIONS TO INCREASE ACCESSIBILITY OF EXISTING 2-STORY PARK DISTRICT FIELD HOUSE. WORK INCLUDES: ADDING AN ELEVATOR WITHIN THE CURRENT BUILDING, (NO CHAN | $1,064,260 |
| 100939499 | 2022-07-13 | General construction | 4720 S ST LOUIS AVE | SPR 2019 CBC THIS IS FOR REPAIRS/RENOVATION OF A WAREHOUSE. THE USE/OCCUPANCY CLASSIFICATION, S-1 WILL NOT CHANGE. WORK INCLUDES NEW ELEVATOR IN EXISTING SHAFT, SOME NEW DOORS IN | $100,000 |
| 100961757 | 2022-04-08 | General construction | 2345 S CHRISTIANA AVE | SELF-CERT 2019 CBRC: NEW ARTIFICIAL TURF FIELD AND ASSOCIATED FENCING (OCCUPANCY GROUP E-1, CONSTRUCTION TYPE 2A) | $2,300,000 |
| 100913335 | 2021-08-16 | General construction | 6100 W FULLERTON AVE | SPR 2019 CBRC - RIIS PARK FIELDHOUSE EXISTING A-3 OCCUPANCY IS A-3, SCOPE OF WORK INCLUDES THE REPLACEMENT OF TWO STAIRS AND AN ADDITION OF AN ELEVATOR TO THE NORTHWEST (BACK OF TH | $1,200,000 |
| 100913463 | 2021-08-03 | General construction | 6112 W FULLERTON AVE | SPR 2019 CBRC. NEW CONSTRUCTION OF A 3-STORY SCHOOL, NEW PARKING LOT WITH (43) SPACES AND ASSOCIATED SITE IMPROVEMENTS. (OCCUPANCY IS E-1 EDUCATIONAL; THE CONSTRUCTION TYPE IS I-B | $34,400,000 |
| 100881655 | 2020-12-08 | General construction | 11554 S AVENUE O | **DIRECT DEVELOPER SERVICES** REVISION TO PERMIT # 100866826 (BLDG C) REVISIONS INCLUDE: 1.) SPRINKLER ROOM REMOVED FROM NONFERROUS/FINES PROCESSING BLDG. 2.) A NEW FIRE PUMP BLDG | $25,000 |
| 100883658 | 2020-12-08 | General construction | 11554 S AVENUE O | **DIRECT DEVELOPER SERVICES** REVISION TO PERMIT #100851448 (BLDG B) REVISION INCLUDE: 1.) B.1 - LOWER LEVEL HAS BEEN REMOVED, ONLY CRAWL SPACE REMAINS. 2.) B.1 - BLDG WILL BE CONS | $60,000 |
| 100881660 | 2020-12-08 | General construction | 11554 S AVENUE O | **DIRECT DEVELOPER SERVICES** REVISION TO PERMIT #100873689 (BLDG D) REVISIONS INCLUDE: 1.) BREAK-ROOM HAS BEEN REMOVED. 2.) THE D.4 / FULLY ENCLOSED TRANSFORMER ENCLOSURE HAS BEEN | $100,000 |
| 100881645 | 2020-12-08 | General construction | 11554 S AVENUE O | **DIRECT DEVELOPER SERVICES** REVISION TO PERMIT # 100849993 (BLDG A), REVISIONS INCLUDE: 1.) A.1/OFFICE HAS BEEN REDESIGNED FROM TWO STORY TO ONE STORY BUILDING. 2.) A.2/MAINTENAN | $650,000 |
| 100873689 | 2020-05-08 | General construction | 11554 S AVENUE O | *DIRECT DEVELOPER SERVICES* NEW CONSTRUCTION BUILDING PERMIT FOR A PROPOSED TWO STORY 9000HP SHREDDER-MOTOR ROOM AND ELECTRICAL ENCLOSURE. THE 2STORY ENCLOSURE IS CONNECTED AT THE | $9,000,000 |
| 100863370 | 2020-04-06 | General construction | 8040 S KOSTNER AVE | NEW CONSTRUCTION OF A ONE (1) STORY ANNEX BUILDING TO EXISTING ELEMENTARY SCHOOL AND ASSOCIATED SITE WORK AS PER PLANS.**CERTIFIED CORRECTIONS- - SUBJECT TO FIELD INSPECTIONS & AUD | $6,906,000 |
| 100847342 | 2020-04-06 | General construction | 644 W BELMONT AVE | (PBC/CPL - #08305) REVISION TO PERMIT #100804103 TO DELETE THE CONSTRUCTION OF BOTH A NEW EXTERIOR RAMP AND EXISTING PARKING LOT MODIFICATIONS AS PER PLANS. **CERTIFIED PLANS CORRE | $2,800,000 |
| 100866826 | 2020-03-25 | General construction | 11554 S AVENUE O | *DIRECT DEVELOPER SERVICES * NEW CONSTRUCTION - PREFABRICATED METAL FRAME BUILDING BUILDING ON CONCRETE FOUNDATION FOR PROCESS EQUIPMENT; CLASS IV-A RECYCLING FACILITY. [BLDG. 'C'] | $9,000,000 |
| 100849993 | 2020-02-25 | General construction | 11554 S AVENUE O | DIRECT DEVELOPER SERVICES - NEW CONSTRUCTION 2 STORY ACCESSIBLE OFFICE SPACE FOR THE ADMINISTRATIVE OPERATIONS. THE OFFICE FUNCTION IS CONNECTED AT THE WEST TO THE MAINTENANCE FUNC | $8,500,000 |
| 100851448 | 2020-02-25 | General construction | 11554 S AVENUE O | DIRECT DEVELOPER SERVICES - NEW CONSTRUCTION OF ONE STORY TYPE II - ACCESSORY SCALE HOUSE TO SERVE AN EXISTING CLASS IV-4 RECYCLING FACILITY. [BLDG. 'B'] | $800,000 |
| 100828136 | 2020-01-06 | General construction | 2901 S POPLAR AVE | RENOVATIONS AND ADDITION TO AN EXIST. 2 STORY PARK DIST. FIELD HOUSE. INTERIOR WORK INCLUDES THE 1ST FLOOR LOBBY AND CLASSROOM AREAS, RECONFIGURATION OF PORTIONS OF THE 2 STORY SE | $4,180,000 |
| 100804103 | 2019-08-07 | General construction | 644 W BELMONT AVE | (PBC/CPL - #08305)ALTERATIONS AND RENOVATIONS TO AN EXISTING CLASS C-1 PUBLIC LIBRARY. PROPOSED USE/OCCUPANCY CLASSIFICATION TO REMAIN THE SAME. WORK INCLUDES NEW EXTERIOR RAMPS AN | $2,800,000 |
| 100817842 | 2019-07-04 | General construction | 5900 N GLENWOOD AVE | RENOVATION WORK AT SENN HIGH SCHOOL WITH NO CHANGE IN OCCUPANCY. RECONFIGURATION AND RENOVATION OF POOL LOCKER ROOMS AND GYMNASIUM. AESTHETIC RENOVATION AND MINOR LOW-VOLTAGE UPGRA | $3,225,000 |
| 100769022 | 2018-10-04 | General construction | 3527 S WALLACE ST | CPS SCHOOL - NO CHANGE IN USE. NEW ELEVATOR ADDITION AND INTERIOR IMPROVEMENTS. | $5,017,000 |
| 100745206 | 2018-04-09 | General construction | 8 W ROOT ST | EXISTING BUILDING USE, ELEMENTARY SCHOOL, AND OCCUPANCY CLASS, C-3, WILL BE RETAINED. SCOPE INCLUDES REVISIONS OR REPAIR TO MECHANICAL, PLUMBING, ELECTRICAL, FIRE ALARM, AND SECURI | $8,464,000 |
| 100688611 | 2017-06-14 | General construction | 3823 S INDIANA AVE | 2ND FLOOR ADDITION TO AN EXISTING CHURCH ABOVE THE ADMINISTRATION BUILDING | $1,200,000 |
| 100630662 | 2016-07-11 | General construction | 3823 S INDIANA AVE | FULL BUILDING: CONSTRUCTION OF NEW ADDITION TO EXISTING CHURCH FOR NEW SANCTUARY AND ADMINISTRATION BUILDING. FOUNDATION UNDER PERMIT 100614487. ALSO TO INCLUDE 12,652 SQ FT OF IN | $23,000,000 |
| 100614487 | 2016-02-08 | General construction | 3823 S INDIANA AVE | FOUNDATION ONLY: FOR NEW 3 LEVEL ADDITION TO EXISTING CHURCH. SLAB ON GRADE WITH SHALLOW FOUNDATIONS. FULL BUILDING TO FOLLOW UNDER SEPARATE PERMIT.(CONDITIONAL PERMIT SUBJECT TO F | $8,000,000 |
| 100593593 | 2015-05-05 | General construction | 3930 E 105TH ST | 3 STORY NEW CONSTRUCTION CPS ELEMENTARY SCHOOL LEED CERTIFICATION | $31,200,000 |
| 100572224 | 2015-02-06 | General construction | 5244 N LAKEWOOD AVE | INTERIOR RENOVATION OF THE EXISTING NARTHEX. REMOVAL OF A NONRATED WALL, INSTALLATION OF FOLDABLE PARTITIONS. ADA UPGRADES WITH INSTALLATION OF NEW EXTERIOR RAMP AND NEW ACCESSIB | $721,688 |
| 100522169 | 2014-03-12 | General construction | 2100 E 87TH ST | CPS INTERIOR ALTERATIONS AND RENOVATIONS OF AN EXISTING 3-STORY HIGH SCHOOL. | $40,000,000 |
| 100513578 | 2014-02-14 | General construction | 1339 S WOOD ST | 30,000SF HANGAR FOR HELICOPTERS AND TILT ROTOR AIRCRAFT AND A +/-11,700SF OFFICE AND SUPPORT AREA. THERE WILL BE A CONCRETE TARMAC AND TAKE OFF/LANDING ZONE AND AUTO PARKING LOT. | $8,500,000 |
| 100491368 | 2013-05-20 | General construction | 3390 N AVONDALE AVE | ERECT 3 STORY 60,000 SF HIGHER EDUCATION TEACHING FACILITY. GREEN PERMIT PROGRAM BENEFIT TIER II - LEED GOLD. 200 CAR PARKING. | $22,000,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Chicago permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
