COMPANY RECORD · CHICAGO, IL

Sharlen Electric Company — electrical permits in Chicago, IL

Sharlen Electric Company appears on 787 electrical permits issued by the City of Chicago Department of Buildings from 2009 through 2026, all of them electrical.

At a glance

First permit on record
2009-03-20
Most recent permit
2026-10-15
Years with filings
18 (2009–2026)
Busiest year
2019 · 93 permits
Main category
Electrical · 100%
Distinct addresses
395
Median declared value
$100,000

How Sharlen Electric Company compares in Chicago

In 2025, Sharlen Electric Company filed 39 electrical permits in Chicago — 116th of 1,265 companies named on electrical permits that year. Across all records since 2009, it ranks 98th of 3,666 with 787 electrical permits.

Ranked by the number of permits in the company's main category, among every company named on such permits in Chicago records — not only those with a page here. Companies with equal counts share a place. Filing volume measures activity, not quality.

Latest electrical permits

IssuedCategoryAddress in sourceScope as filed
2026-10-15Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 11/1/2026. END DATE: 12/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED EL
2026-09-25Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 10/1/2026. END DATE: 10/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED E
2026-09-04Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 9/1/2026. END DATE: 10/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELE
2026-07-27Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 8/1/2026. END DATE: 8/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELE
2026-07-06Electrical1700 W 83RD STDDS: 2019 CBC: REVISION TO PERMIT 101065166 TO INCLUDE STRUCTURAL MODIFICATIONS, REMOVAL OF SCISSOR LIFT, MINOR LAYOUT CHANGES, FINISH UPDATES, WINDOW REPLACEMENT, AND ASSOCIATED M

The 5 most recent filings; the full list is further down.

Permit categories

CategoryPermitsShare
Electrical787100%

Activity by year

YearPermits issued
200913
201011
201132
201242
201367
201456
201544
201637
201738
201868
201993
202074
202151
202238
202339
202428
202539
202617

Busiest year on record: 2019, with 93 permits. One project can account for several filings, so read this as filing activity rather than workload.

Named on the same permit

Name in sourceLinked permitsLast seen
W. E. O'neil Construction Co.552026-06-09
Interior Alterations392017-01-20
Ccc Holdings, Inc. D/B/A Ccc Design Build332022-12-09
Reed Illinois Corporation182024-07-16
O'neil Industries, Inc.162019-03-08
Chicago Commercial Contractors, LLC132011-08-17
Raffin Construction Company122023-07-05
K.R. Miller Contractors, Inc.122015-12-03
Blinderman Construction Co., Inc.112015-07-10
Summit Design & Build, LLC.112025-03-10
Walsh Construction Company II, LLC112020-04-24
Walsh Construction Company112018-07-23

135 companies are named alongside Sharlen Electric Company on the same Chicago permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
10730 S BURLEY AVE2026-10-15
1700 W 83RD ST2026-07-06
1 W GRAND AVE2026-06-09
2928 N ASHLAND AVE2026-05-12
201 N SANGAMON ST2026-01-28
5300 S CALUMET AVE2026-01-27
3501 S PULASKI RD2026-01-12
2160 W OGDEN AVE2025-10-21
30 S WACKER DR2025-09-22
180 N STETSON AVE2025-09-11
1 N FRANKLIN ST2025-08-11
4628 N CLIFTON AVE2025-08-11
200 N LA SALLE ST2025-07-18
905 W FULTON MARKET2025-07-02

395 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1 to $70,000,000, median $100,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Also named on permits at the same addresses

CompanyShared addressesYears
W. E. O'neil Construction Co.272013–2026
F.H. Paschen, S.N. Nielsen & Associates, LLC.262009–2023
K.R. Miller Contractors, Inc.242009–2025
Sandsmith Construction Inc.212009–2026
Advanced Wiring Solutions212010–2025
Broadway Electric, Inc.202009–2021
Tk Elevator192009–2026
Terry Plumbing A Matrix Holdin192011–2026

Companies that also appear in Chicago permit records at addresses where Sharlen Electric Company filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.

Electrical permits on record

787 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
B2005155442026-10-15Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 11/1/2026. END DATE: 12/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED EL
B2005126522026-09-25Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 10/1/2026. END DATE: 10/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED E
B2005081742026-09-04Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 9/1/2026. END DATE: 10/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELE
B2004799452026-07-27Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 8/1/2026. END DATE: 8/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELE
1010777122026-07-06Electrical1700 W 83RD STDDS: 2019 CBC: REVISION TO PERMIT 101065166 TO INCLUDE STRUCTURAL MODIFICATIONS, REMOVAL OF SCISSOR LIFT, MINOR LAYOUT CHANGES, FINISH UPDATES, WINDOW REPLACEMENT, AND ASSOCIATED M$500,000
B2004751162026-06-22Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 7/1/2026. END DATE: 7/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELE
1010828902026-06-09Electrical1 W GRAND AVESELF CERT 2019 CBRC: REVISION TO PERMIT 101065703, WORK IS LIMITED TO THE REPLACEMENT IN KIND OF 1600 AMP (208V/3PH) SWITCHGEAR EQUIPMENT AS PER PLANS. A-2 ASSEMBLY AND CONSTRUCTIO$100,000
B2004714642026-05-21Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 6/1/2026. END DATE: 7/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELEC
B2004700132026-05-12Electrical2928 N ASHLAND AVELOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. INSTALL DATA/VIDEO. INSTALL SECURITY. SPECIFIC LOCATION: INTERIOR OF RETAIL STORE.$50,000
B2004674032026-04-24Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 5/1/2026. END DATE: 5/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELE
B2004632672026-03-23Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 4/1/2026. END DATE: 5/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELEC
B2004600862026-02-26Electrical1 W GRAND AVELINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 1. SPECIFIC LOCATION: BASEMENT.$750,000
B2004597892026-02-24Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 3/1/2026. END DATE: 3/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELE
1010777292026-01-28Electrical201 N SANGAMON STDDS 2019 CBC: REVISION TO PERMIT 101064854. REVISIONS INCLUDE AN ADDITIONAL STAFF OFFICE, CORRIDOR, AND ADDITIONAL SINK IN CAFE SPACE. (OCCUPANCY GROUPS A2, A3, B; TYPE IA CONSTRUC$10,000
1010690222026-01-27Electrical5300 S CALUMET AVEDDS 2019 CBC: FULL BUILDING PERMIT FOR NEW 6 STORY, 71 DWELLING UNIT APARTMENT BUILDING WITH 24 OUTDOOR PARKING SPACES AND ROOFTOP TERRACE (OCC. R-2, A-2, A-3, B, S-2; TYPE IIA CO$28,000,000
B2004561012026-01-14Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 2/1/2026. END DATE: 3/3/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELEC
1010717542026-01-12Electrical3501 S PULASKI RDSPR 2019 CBRC: SITE IMPROVEMENTS FOR EXISTING WAREHOUSE TO INCLUDE NEW ADA RAMP, SIDEWALKS, PEDESTRIAN GATES MODIFICATIONS AND VIDEO INTERCOMS AND SECURITY DEVICE INSTALLATION AS P$425,000
B2004537512025-12-11Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 1/1/2026. END DATE: 1/31/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELE
B2004508222025-11-18Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 12/1/2025. END DATE: 12/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED E
B2004483302025-11-07Electrical1700 W 83RD STFIRE ALARM: MODIFICATION OF EXISTING SYSTEM. ASSOCIATED BUILDING PERMIT:101065166. AFFECTS: 0 DWELLING UNITS; 3 NON-RESIDENTIAL UNITS. HIGH-RISE BUILDING: NO. VOICE COMMUNICATION:
B2004470992025-10-27Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 11/1/2025. END DATE: 12/1/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED EL
B2004413112025-10-21Electrical2160 W OGDEN AVELINE VOLTAGE ELECTRICAL WORK. ADD 200 CIRCUITS TO EXISTING 1000 AMP SERVICE DISCONNECTING MEANS. RECEPTACLE OUTLETS: 12 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: BASEMENT.$80,000
B2004438722025-10-01Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 10/1/2025. END DATE: 10/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED E
B2004431142025-09-22Electrical30 S WACKER DRLOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. INSTALL SECURITY. SPECIFIC LOCATION: FLOORS 31-35 AND 37TH FLOOR.$10,000
B2004419572025-09-11Electrical180 N STETSON AVELOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. INSTALL SECURITY. SPECIFIC LOCATION: 53RD AND 54TH FLOORS.$112,907
B2004406772025-09-10Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 9/2/2025. END DATE: 10/2/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELE
1010728232025-09-09Electrical1 W GRAND AVESELF CERT 2019 CBRC: REVISION TO PERMIT 101065703. STRUCTURAL PEER REVIEW INCLUDED. REMOVING THE EXISTING BEARING WALL ON THE FIRST FLOOR ONLY AND INSTALLATION OF 2 COLUMNS ON TH$1,000,000
B2004376232025-08-18Electrical180 N STETSON AVEFIRE ALARM: MODIFICATION OF EXISTING SYSTEM. ASSOCIATED BUILDING PERMIT:101069641. AFFECTS: 0 DWELLING UNITS; 1 NON-RESIDENTIAL UNITS. HIGH-RISE BUILDING: YES. VOICE COMMUNICATION:
1010717962025-08-11Electrical1 N FRANKLIN STSELF CERT 2019 CBRC: INTERIOR ALTERATIONS TO SVOBODA CAPITAL SUITE 1105. NEW BUILD OUT WORK INCLUDES: DEMOLITION, MILLWORK, PLUMBING. ELECTRICAL, MECHANICAL, & CEILING. NO STRUCTUR$50,394
1010715772025-08-11Electrical4628 N CLIFTON AVELIMITED SINGLE-STORY RENOVATIONS TO EXISTING 2-STORY MASONRY AND CONCRETE BUILDING. DEMOLITION OF NON-STRUCTURAL PARTITIONS. UPDATES TO EXISTING CAFETERIA TO INCLUDE NEW FLOORING, $175,000
B2004366042025-08-04Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 8/4/2025. END DATE: 9/3/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELEC
B2004330092025-07-18Electrical200 N LA SALLE STLINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 9 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: 1ST FLOOR AREA LB-04.$30,000
1010651662025-07-03Electrical1700 W 83RD STDDS: 2019 CBC: 2 STORY ADDITION TO AN EXISTING 3 STORY CHARTER SCHOOL ON SHALLOW FOUNDATIONS. THE ADDITION TO INCLUDE A GYMNASIUM, CLASSROOMS, AND SCHOOL LABS. 3 HR SEPARARTION BE$6,000,000
B2004298152025-07-02Electrical905 W FULTON MARKETSCOPE: NONSTRUCTURAL INTERIOR ALTERATION TO INCLUDE ELECTRICAL, NEW PARTITION WALLS, FLOORS, FINISHES, AND ASSOCIATED ELECTRICAL AND LIGHTING. LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 N$186,060
B2004301052025-06-19Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 7/1/2025. END DATE: 7/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELE
B2004189292025-06-16Electrical326 W 64TH STFOR PERMIT 101062307: REPLACEMENT ELECTRICAL CONTRACTOR. NEW CONTRACTOR(S) LISTED UNDER "OTHER APPLICANTS AND CONTRACTORS" ON PERMIT CERTIFICATE.
B2004189212025-06-16Electrical326 W 64TH STFOR PERMIT 101058690: REPLACEMENT ELECTRICAL CONTRACTOR. NEW CONTRACTOR(S) LISTED UNDER "OTHER APPLICANTS AND CONTRACTORS" ON PERMIT CERTIFICATE.
1010648542025-06-05Electrical201 N SANGAMON STDDS 2019 CBC: INITIAL TENANT BUILDOUT OF 31,000 SF COMMERCIAL GYM WITH ACCESSORY CAFE, RETAIL, AND SPA WITH MASSAGE SERVICES ON LEVELS 1 AND 2 OF 11 STORY BUILDING. INCLUDES ELECTR$1,550,000
1010678382025-05-21Electrical10355 S WOODLAWN AVEINSTALLATION OF ONE (1) DOUBLE-SIDED MONUMENT SIGN AND CONNECT TO SUPPLIED LEADS.$50,000
B2004261372025-05-21Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 6/1/2025. END DATE: 7/1/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELEC
B2004219252025-04-30Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 5/1/2025. END DATE: 5/31/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELE
1010637662025-04-29Electrical2497 N MILWAUKEE AVESELF CERT: BUBBLE TEA TENANT INTERIOR BUILD OUT FROM EXISTING RETAIL WITH ARCHITECTURAL, ELECTRICAL AND PLUMBING WORK.NO CHANGE TO EXTERIOR FACADE AND STRUCTURE.$150,000
1010657032025-04-25Electrical1 W GRAND AVESELF-CERT 2019 CBRC: ***STRUCTURAL PEER REVIEW*** EXTERIOR MASONRY REPAIRS, ALTERATIONS AND STOREFRONT REPLACEMENT FOR A 2-STORY VACANT RESTAURANT GLAZED TERRA COTTA AND BRICK BUIL$1,000,000
B2004206442025-04-16Electrical222 W MERCHANDISE MART PLZFIRE ALARM: MODIFICATION OF EXISTING SYSTEM. ASSOCIATED BUILDING PERMIT:101064860. AFFECTS: 0 DWELLING UNITS; 1 NON-RESIDENTIAL UNITS. HIGH-RISE BUILDING: YES. VOICE COMMUNICATION:
B2004186052025-04-11Electrical155 N WACKER DRFIRE ALARM: MODIFICATION OF EXISTING SYSTEM. ASSOCIATED BUILDING PERMIT:101061820. AFFECTS: 0 DWELLING UNITS; 1 NON-RESIDENTIAL UNITS. HIGH-RISE BUILDING: YES. VOICE COMMUNICATION:
1010597952025-04-08Electrical1060 W ADDISON STINSTALL OF THE 3.5 MHZ DAS (DISTRIBUTED ANTENNA SYSTEM) FOR C-BAND CELLULAR SERVICE IN THE BOWL AREA OF THE BALL PARK. SCOPE INCLUDES ADDING AN ADDITIONAL REMOTE AND ACCOMPANYING P$1,140,695
1010668002025-03-26Electrical1101 W WAVELAND AVESELF CERT 2019 CBRC INTERIOR ALTERATION TO EXTEND COMMON CORRIDOR ON 3RD FLOOR. NO CHANGE IN USE. NO CHANGE IN OCCUPANCY. B-BUSINESS. 1A CONSTRUCTION TYPE$575,000
B2004181542025-03-25Electrical10730 S BURLEY AVEELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 4/1/2025. END DATE: 5/1/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELEC
1010653512025-03-13Electrical211 E CHICAGO AVESELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING OFFICE SUITE 1180. EXISTING OFFICE SPACE DEMOLISHED TO WHITE BOX CONDITION AND REBUILT IN NEW CONFIGURATION INCLUDING REDISTRI$504,952
1010632872025-03-10Electrical6701 W FOREST PRESERVE AVEDDS CBRC 2019 INTERIOR AND EXTERIOR ALTERATIONS TO EXISTING BUILDING SPACE FOR CONVERSION TO A NEW WASTEWATER TREATMENT ROOM. EXTERIOR UNDERGROUND PRIVATE SEWER PIPING IN TRUCK PAR$300,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Other electrical contractors in Chicago

CompanyPermits on record
Taylor Electric Company806
A B B802
Durkin Electric Company, Inc.785
G & M Electrical Contractors C785
Pure Power Electrical,Corp.770
Abco Electrical Construction768
Adnan David Electric768
Block Electric Company768

Companies whose main permit category in Chicago is also electrical, closest to Sharlen Electric Company in filing volume. Listed for comparison, not as a recommendation.

Questions about Sharlen Electric Company

What permits has Sharlen Electric Company filed in Chicago?

787 electrical permits on record from 2009 through 2026.

When did Sharlen Electric Company last file a permit in Chicago?

The most recent permit on record was issued 2026-10-15: electrical at 10730 S BURLEY AVE.

Where does Sharlen Electric Company work?

395 distinct Chicago addresses appear on its permits.

Which companies appear on permits with Sharlen Electric Company?

Most often W. E. O'neil Construction Co., Interior Alterations, Ccc Holdings, Inc. D/B/A Ccc Design Build. Appearing on the same permit is a documented co-appearance, not proof of a current contract.

Search these records

The 787 permits above are a static record through 2026. Select a year above to open that year’s records, or search Sharlen Electric Company in Chicago, IL by address, trade or date range.

Source and limits

Public Chicago electrical permits from the City of Chicago Department of Buildings through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →

Is this your company? Show this public permit record on your website with a free badge.