COMPANY RECORD · SEATTLE, WA
Kolkay Electric, Inc. — permit history in Seattle, WA
Kolkay Electric, Inc. appears on 136 Seattle permit records from 2015 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 136 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 11 |
| 2016 | 13 |
| 2017 | 7 |
| 2018 | 4 |
| 2019 | 6 |
| 2020 | 18 |
| 2021 | 17 |
| 2022 | 17 |
| 2023 | 15 |
| 2024 | 13 |
| 2025 | 12 |
| 2026 | 3 |
Busiest year on record: 2020, with 18 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1451 23RD AVE W | 2026-04-02 |
| 4432 35TH AVE SW | 2026-01-27 |
| 8319 8TH AVE S | 2026-01-13 |
| 9401 MYERS WAY S | 2025-11-25 |
| 609 6TH AVE | 2025-11-12 |
| 920 N 137TH ST | 2025-10-07 |
| 2203B AIRPORT WAY S | 2025-09-18 |
| 2203 AIRPORT WAY S | 2025-07-15 |
| 500 5TH AVE | 2025-05-29 |
| 13001 LINDEN AVE N | 2025-02-24 |
| 201 S JACKSON ST | 2025-02-12 |
| 3407 AIRPORT WAY S | 2025-01-02 |
| 8401 8TH AVE S | 2024-09-17 |
| 5190 SW 98TH ST | 2024-08-19 |
88 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1 to $2,000,000, median $20,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
136 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7136466-EL | 2026-04-02 | Electrical | 1451 23RD AVE W | Installing conduit pathways, transformer, and panelboard | |
| 7126660-EL | 2026-01-27 | Electrical | 4432 35TH AVE SW | Installing conduit pathways and providing a new breaker. [C.Kenefick 3/5/2026 - four 20a circuits being installed. Fees corrected.] | $1 |
| 7114064-EL | 2026-01-13 | Electrical | 8319 8TH AVE S | Upgrading existing fire alarm panel to voice. Upgrading existing horn strobe devices to speaker strobes. This is a joint venture with Kolkay and Siemens Industry | $10,000 |
| 7117668-EL | 2025-11-25 | Electrical | 9401 MYERS WAY S | This project is nearly completely built. We had planned on utilizing an electrical over the counter permit, but learned that this should have gone through plan review. This is a Ci | $200,000 |
| 7111059-EL | 2025-11-12 | Electrical | 609 6TH AVE | This project is an expansion of level 2 chargers and main electrical equipment (two transformers, panel boards and distribution) in support of powering these chargers. [11/12/25 KE | $300,000 |
| 7110489-EL | 2025-10-07 | Electrical | 920 N 137TH ST | A joint venture panel relocation with Everon as primary contractor. Kolkay Electric is secondary contractor. | $1,000 |
| 7103545-EL | 2025-09-18 | Electrical | 2203B AIRPORT WAY S | Installation of Electric Vehicle Charging Stations at Airport Way Center - Building B [9/18/25 KEF - Plan set approved.] | $40,000 |
| 7101197-EL | 2025-08-12 | Electrical | 9401 MYERS WAY S | Includes procurement and installation of (4) dual pedestal L2 electric vehicle chargers that are RFID-enabled, as well as related exterior 150 KVA transformer on a concrete pad. R | $2,000,000 |
| 7078248-EL | 2025-07-15 | Electrical | 2203 AIRPORT WAY S | Includes the addition of 16 dual outlet Level 2 EV chargers and associated panelboards. [4/29/25 KEF - Approved pending EC assignment] [6/25/25 KEF - Revised drawings submitted an | $347,600 |
| 7088338-EL | 2025-05-29 | Electrical | 500 5TH AVE | Relocating 3 circuits | $6,000 |
| 7087907-EL | 2025-05-27 | Electrical | 920 N 137TH ST | Installing lighting fixtures, conduit pathway, panelboard and UPS. | $103,000 |
| 7070632-EL | 2025-05-06 | Electrical | 8319 8TH AVE S | New fire alarm complete system in community center building. This is a joint venture with Kolkay Electric and Siemens Industry | $30,000 |
| 7072079-EL | 2025-02-24 | Electrical | 13001 LINDEN AVE N | Installing 75kva Transformer | $5,900 |
| 7066542-EL | 2025-02-12 | Electrical | 201 S JACKSON ST | 24030-Metro Consolidation 4th and 5th Floor Install conduit, lighting controls, breakers, VAV disconnects, receptacles, line voltage occupancy switches, and low voltage/communica | $1,228,000 |
| 7052740-EL | 2025-01-02 | Electrical | 3407 AIRPORT WAY S | Installing a new generator for back up power [01/02/25 BGO - Approved Plan Set with Comments] renewal NDM 12/22/25 | $500,000 |
| 6978114-EL | 2024-09-17 | Electrical | 8401 8TH AVE S | Service upgrade to an existing facility. Work includes installing conduit from community center to existing SCL pole. | $89,800 |
| 7041657-EL | 2024-08-19 | Electrical | 5190 SW 98TH ST | Installing 125 amp panel | $115,000 |
| 7031682-EL | 2024-07-29 | Electrical | 8319 8TH AVE S | Installing lighting and lighting controls system, electrical gear, and conduit to Water Spray Park. [07/29/2024 - BGO Approved Plan Set]. 11/21/24 r m, Enter from 7th Ave S. Contac | $103,000 |
| 7031605-EL | 2024-06-20 | Electrical | 201 S JACKSON ST | Install conduit, lighting controls, breakers, and disconnects for the 4th and 5th floors. [C.Kenefick 11/26/24 - fees adjusted to reflect 1,333 light fixtures only. ***C>Kenefick 1 | $11,000 |
| 7031076-EL | 2024-06-17 | Electrical | 201 S JACKSON ST | Provide and install conduit and breakers. | $11,000 |
| 7024954-EL | 2024-05-14 | Electrical | 1550 ELLIOTT AVE | Provide and install Heat Trace circuit | $1,200 |
| 7023960-EL | 2024-05-08 | Electrical | 700 5TH AVE | Installing 4 fire alarm devices | $5,200 |
| 7023030-EL | 2024-05-02 | Electrical | 600 4TH AVE | Install new transformer, 2 water heaters going from gas to electric. | $6,400 |
| 7020368-EL | 2024-04-17 | Electrical | 1103 FAIRVIEW AVE N | Conduit run to 100amp panel. | $81,000 |
| 7018253-EL | 2024-04-04 | Electrical | 1103 FAIRVIEW AVE N | Installing 125 amp panel | $81,000 |
| 7015391-EL | 2024-03-20 | Electrical | 600 4TH AVE | Installed new Transformer, 2 water heaters going from gas to electric. | $10,000 |
| 7011359-EL | 2024-02-26 | Electrical | 600 4TH AVE | Provide and install 3 new fuses in 2 existing disconnect switches. | $10,000 |
| 7003697-EL | 2024-01-08 | Electrical | 3224 4TH AVE S | 23061 - Fire Station, new conduit for Unit Heater Replacement. | $6,000 |
| 7000616-EL | 2023-12-13 | Electrical | 1211 E ALDER ST | Modify existing fire alarm system KC Fire Sprinkler. | $16,000 |
| 7000617-EL | 2023-12-13 | Electrical | 1211 E ALDER ST | Installing conduit for low voltage, and add 6 circuits. | $6,000 |
| 6998493-EL | 2023-11-30 | Electrical | 1250 DENNY WAY | Providing Electrical installation of VFD | $200 |
| 6998607-EL | 2023-11-30 | Electrical | 13001 LINDEN AVE N | Replacing existing panelboard [C.Kenefick 11/26/24 - fees for lighting control added to permit.] | $58,000 |
| 6993226-EL | 2023-10-26 | Electrical | 3407 AIRPORT WAY S | Providing Circuit & Disconnect for new Trash Compactor | $15,000 |
| 6992872-EL | 2023-10-24 | Electrical | 2711 ALASKAN WAY | Furnish and install conduit. | $35,000 |
| 6991457-EL | 2023-10-16 | Electrical | 140 E BLAINE ST | Temp Power | $3,000 |
| 6987706-EL | 2023-09-25 | Electrical | 140 E BLAINE ST | Installing a new 125amp panel | $60,000 |
| 6975840-EL | 2023-07-25 | Electrical | 2445 3RD AVE S | 1000 amp breaker and feeder to new boiler. | $15,000 |
| 6965391-EL | 2023-05-18 | Electrical | 1900 NE GRANT LN | Need to transfer permit #6932323-EL Altered Circuits to relocates lights, furnish and install new lighting control system, also install electrical whips and outlet furniture. Now | $197,000 |
| 6963677-EL | 2023-05-09 | Electrical | 1901 FEDERAL AVE E | New conduit installation for 30 AMP panel | $7,250 |
| 6961219-EL | 2023-04-26 | Electrical | 2077 E HOWE ST | New conduit installation for 30 AMP panel. | $7,500 |
| 6961203-EL | 2023-04-26 | Electrical | 400 18TH AVE E | New conduit installation for 30 AMP panel. | $7,500 |
| 6961224-EL | 2023-04-26 | Electrical | 2211 20TH AVE S | New conduit installation for 200 AMP panel. | $7,250 |
| 6961229-EL | 2023-04-26 | Electrical | 3307 20TH AVE S | New conduit installation for 200 AMP panel. | $7,250 |
| 6940263-EL | 2022-12-28 | Electrical | 1601 W ARMORY WAY | material, labor, tools and equipment to complete a usable restroom remodel. | $45,000 |
| 6932297-EL | 2022-11-07 | Electrical | 4500 WEST MARGINAL WAY SW | Demo and rewire low voltage wiring for security, providing conduit pathways for new security. Add a new 100 AMP panel, (2) added switches and (2) new breakers. | $5,000 |
| 6932352-EL | 2022-11-07 | Electrical | 9844 40TH AVE S | add (6) outlets, adding a 125 AMP Feeder. | $18,000 |
| 6932323-EL | 2022-11-07 | Electrical | 4000 15TH AVE NE | Altered circuits to relocate lights, furnish and install new lighting control system, also install electrical whips and outlets for furniture. | $197,000 |
| 6924768-EL | 2022-09-27 | Electrical | 5110 SHILSHOLE AVE NW | Regulator Gate Actuator replacement | $15,000 |
| 6916714-EL | 2022-08-11 | Electrical | 4200 AIRPORT WAY S | Installation of new waterjet cutting machine and includes new electrical distribution. | $48,575 |
| 6878712-EL | 2022-07-26 | Electrical | 1251 JOHN ST | Furnish and install electrical, fire detection & alarm, and power connection. | $113,801 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →