V. C. Vitanza Sons Inc — permit history in New York, NY
V. C. Vitanza Sons Inc appears on 40 New York permit records from 2019 through 2026, most often plumbing (83.3% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 35 | 83.3% |
| Fire protection | 7 | 16.7% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 3 |
| 2021 | 3 |
| 2022 | 2 |
| 2023 | 5 |
| 2024 | 6 |
| 2025 | 11 |
| 2026 | 12 |
Busiest year on record: 2026, with 12 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Northeast Restoration Cor | 4 | 2025-06-17 |
| Adam's European Contracti | 3 | 2026-08-26 |
| Mega Technico, Jv Inc | 3 | 2026-07-07 |
| T.A. Ahern Contracto Corp | 3 | 2026-04-01 |
| Volmar Construction Inc | 3 | 2022-05-25 |
| Kg Construction Services | 2 | 2025-03-20 |
| Nehal Contracting Inc | 2 | 2025-08-12 |
| All Con Contracting Corp | 1 | 2025-02-12 |
| Amcon Contracting Corp | 1 | 2026-04-03 |
| Awl Industries Inc | 1 | 2023-10-02 |
| Infinity Contracting Serv | 1 | 2024-07-26 |
| Navillus Tile Inc | 1 | 2023-05-11 |
14 companies are named alongside V. C. Vitanza Sons Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 225 ADELPHI STREET | 2026-08-26 |
| 88-07 102 STREET | 2026-08-06 |
| 415 BALTIC STREET | 2026-07-07 |
| 175 HOYT STREET | 2026-06-01 |
| 230-17 HILLSIDE AVENUE | 2026-04-03 |
| 420 BALTIC STREET | 2026-04-02 |
| 8301 SHORE ROAD | 2026-04-01 |
| 181 HOYT STREET | 2026-02-12 |
| 120 EAST 184 STREET | 2025-08-12 |
| 1390 WILLOUGHBY AVENUE | 2025-06-20 |
| 206 CLAWSON STREET | 2025-03-20 |
| 216 CLAWSON STREET | 2025-03-20 |
| 157 DOUGLASS STREET | 2025-02-27 |
| 425 HENRY STREET | 2025-02-12 |
31 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1 to $2,082,548, median $273,500. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
40 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| B00940640-S6-EW-SP | 2026-08-26 | Fire protection | 225 ADELPHI STREET | Sprinkler replacement for ADA upgrade-elevator and lobby addition | $100,307 |
| B00940640-S1-PL | 2026-08-26 | Plumbing | 225 ADELPHI STREET | ADA upgrade cap/remove various fixtures and install new plumbing fixtures, sump pump and roof drain | $1,256,368 |
| Q01018444-S2-PL | 2026-08-06 | Plumbing | 88-07 102 STREET | Modification to the existing plumbing system | $400,000 |
| B01228869-S2-PL | 2026-07-07 | Plumbing | 415 BALTIC STREET | NYCHA/Gowanus/Bldg4W_ Replace all plumbing fixtures in kitchen and bathroom of all apartments. Replace all Domestic Hot Water riser shut off valves. Installation of point-of-use fi | $1,205,512 |
| B01228832-S2-PL | 2026-06-01 | Plumbing | 175 HOYT STREET | NYCHA/Gowanus/B1_Replace all plumbing fixtures in kitchen and bathroom of all apartments. Replace all Domestic Hot Water riser shut off valves. Installation of point-of-use fixture | $375,879 |
| Q00949570-S4-PL | 2026-04-03 | Plumbing | 230-17 HILLSIDE AVENUE | PL: Remove existing plumbing fixtures and provide new connected to existing system. No change in use, occupancy, or egress. | $344,500 |
| B00502959-I1-PL | 2026-04-02 | Plumbing | 420 BALTIC STREET | NYCHA BOILER - Plumbing work and associated piping for interior renovation. | $231,900 |
| B00928624-S5-PL | 2026-04-01 | Plumbing | 8301 SHORE ROAD | Stormwater drainage work is adding additional catch basins within the property limits to prevent future flooding. and does not increase the impervious area and all stormwater struc | $200,000 |
| B00928624-S3-PL | 2026-03-31 | Plumbing | 8301 SHORE ROAD | Remove existing HW Heater, Tank and Equipment Pad, Cut/Cap Existing Gas Piping, Remove existing water lines to Boilers Provide new Gas-Fired Hot water heater, Circulation Pump Gas | $1,223,259 |
| B01035344-S1-PL | 2026-03-02 | Plumbing | 8301 SHORE ROAD | Remove 3 drinking fountains, relocate 3 existing fountains for ADA compliance, provide ADA fountain BF (3), DF w/Bubbler (6), remove existg LAV replace with ADA Lav (2), remove exi | $185,000 |
| B01228854-S2-PL | 2026-02-12 | Plumbing | 181 HOYT STREET | NYCHA/Gowanus/B3- (181 & 187 HOYT)_Replace all plumbing fixtures in kitchen and bathroom of all apartments. Replace all Domestic Hot Water riser shut off valves. Installation of po | $311,664 |
| B00883288-S1-PL | 2026-01-16 | Plumbing | 225 ADELPHI STREET | Roof drain replacement | $4,400 |
| X00691771-S1-PL | 2025-08-12 | Plumbing | 120 EAST 184 STREET | 1.Installation of pool filtration system 2. Miscellaneous repairs of pool 3. Installation of Pool equipment and piping | $637,500 |
| X00944666-S1-PL | 2025-08-12 | Plumbing | 120 EAST 184 STREET | PROVIDE COLD WATER QUENCHING PIPE TO THE SUMP PIT TO MINIMIZE THE FLASHING OF HOT CONDENSATE TO STEAM. REMOVE EXISTING NON-OPERATIONAL DUPLEX PUMP & REPLACE WITH A NEW DUPLEX PUMP | $192,419 |
| B01005646-S2-PL | 2025-06-20 | Plumbing | 1390 WILLOUGHBY AVENUE | Plumbing modifications/installation for IS 162K | $332,120 |
| B00955364-S5-EW-SP | 2025-06-17 | Fire protection | 1390 WILLOUGHBY AVENUE | K162-REPLACE SPRINKLER HEADS & SUMP PUMPS WITH NEW. REMOVAL OF EXISTING GAS METER, GAS PIPING, BOOSTER PUMPS. | $2,000,000 |
| B00955364-S5-EW-SP | 2025-06-17 | Plumbing | 1390 WILLOUGHBY AVENUE | K162-REPLACE SPRINKLER HEADS & SUMP PUMPS WITH NEW. REMOVAL OF EXISTING GAS METER, GAS PIPING, BOOSTER PUMPS. | $2,000,000 |
| B00955364-S5-PL | 2025-06-17 | Fire protection | 1390 WILLOUGHBY AVENUE | K162-REPLACE SPRINKLER HEADS & SUMP PUMPS WITH NEW. REMOVAL OF EXISTING GAS METER, GAS PIPING, BOOSTER PUMPS. | $2,000,000 |
| B00955364-S5-PL | 2025-06-17 | Plumbing | 1390 WILLOUGHBY AVENUE | K162-REPLACE SPRINKLER HEADS & SUMP PUMPS WITH NEW. REMOVAL OF EXISTING GAS METER, GAS PIPING, BOOSTER PUMPS. | $2,000,000 |
| S01016639-S4-PL | 2025-03-20 | Plumbing | 206 CLAWSON STREET | Respectfully requesting an amendment to include replacement of section of existing sprinkler pipe, replacement of existing sprinkler heads (less than 20) & removal of unsupervised | $1,071,933 |
| S00922659-S2-PL | 2025-03-20 | Plumbing | 216 CLAWSON STREET | Remove & replace 11 existing roof drains, relocate 2 existing roof drains and remove & replace 17 existing vent stacks, provide extensions to 2 vent stacks As per plans filed here | $247,000 |
| B00916921-I1-PL | 2025-02-27 | Plumbing | 157 DOUGLASS STREET | Civil work and underground drainage for new 1 story building mechanical boiler room | $25,520 |
| B00842565-S2-PL | 2025-02-12 | Plumbing | 425 HENRY STREET | Plumbing for ADA upgrade | $445,025 |
| B08047450-S1-PL | 2024-12-20 | Plumbing | 231 PALMETTO STREET | Plumbing work for flood elimination associated with DOB Now project B08047450. The work depicted herein is for the replacement/rerouting of existing drainage piping, and replacemen | $781,000 |
| M08032179-I1-EW-SP | 2024-12-02 | Fire protection | 2931 8 AVENUE | RESPECTFULLY FILING FOR SPRINKLER WORK WHICH INCLUDES: DEMOLITION OF EXISTING LIMITED AREA SPRINKLER SYSTEM INSTALLATION OF NEW LIMITED AREA SPRINKLER SYSTEM. | $112,909 |
| M08032280-I1-EW-SP | 2024-10-31 | Fire protection | 2989 FRED DOUGLASS BOULEVARD | RESPECTFULLY FILING FOR SPRINKLER WORK WHICH INCLUDES: DEMOLITION OF EXISTING LIMITED AREA SPRINKLER SYSTEM INSTALLATION OF NEW LIMITED AREA SPRINKLER SYSTEM. | $40,000 |
| M08032226-I1-EW-SP | 2024-09-25 | Fire protection | 2965 8 AVENUE | RESPECTFULLY FILING FOR SPRINKLER WORK WHICH INCLUDES: DEMOLITION OF EXISTING LIMITED AREA SPRINKLER SYSTEM INSTALLATION OF NEW LIMITED AREA SPRINKLER SYSTEM. | $40,000 |
| M08032274-I1-EW-SP | 2024-09-25 | Fire protection | 2945 8 AVENUE | RESPECTFULLY FILING FOR SPRINKLER WORK WHICH INCLUDES: DEMOLITION OF EXISTING LIMITED AREA SPRINKLER SYSTEM INSTALLATION OF NEW LIMITED AREA SPRINKLER SYSTEM. | $40,000 |
| B00849071-S1-PL | 2024-07-26 | Plumbing | 9115 5 AVENUE | K104_Remove and replace yard drains and associated piping. | $14,648 |
| M00864914-S2-PL | 2023-10-02 | Plumbing | 1980 LEXINGTON AVENUE | UPACA - SITE #5, INSTALLATION OF TEMPORARY 8 GAS PIPING AND 4 HOT / COLD WATER PIPING CONNECTED TO (2) MOBILE BOILER TRAILERS AND THE EXISTING BUILDING HEATING SYSTEM TO PROVIDE HE | $30,000 |
| B00491448-I1-PL | 2023-09-12 | Plumbing | 157 DOUGLASS STREET | NYCHA BOILER - INSTALLATION OF NEW PLUMBING FIXTURES FILED IN CONJUNCTION WITH NB APPLICATION B00486866 | $1,000 |
| M00467922-I1-PL | 2023-08-07 | Plumbing | 1980 LEXINGTON AVENUE | NYCHA BOILER- 1.REMOVE EXISTING STEAM INSTANTANEOUS TO HOT WATER HEATERS AND ASSOCIATED PIPING AND EQUIPMENT IN BOILER ROOM. PROVIDE NEW PACKAGED CONDENSING GAS FIRED WATER HEATERS | $618,984 |
| M08034119-S4-PL | 2023-05-11 | Plumbing | 2941 8 AVENUE | PLUMBING WORK FILED IN CONJUCTION WITH NEW BUILDING AS PER PLANS FILED HEREWITH | $1 |
| B00734081-I1-PL | 2023-02-07 | Plumbing | 2202 60 STREET | RENOVATION OF PLUMBING SYSTEMS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY. POST APPROVAL AMENDMENT TO CHANGE ASBESTOS ABATEMETN COMPLIANCE FROM ACP 20/21 TO | $2,082,548 |
| B00674336-I1-PL | 2022-07-25 | Plumbing | 167 BUSH STREET | FILING FOR REPLACEMENT IN KIND OF BATHROOM & KITCHEN FIXTURES, DEMOLITION OF EXISTING BATHROOM & KITCHEN FIXTURES. REPLACMENT AND DEMOLITION OF EXISTING RISERS AS PER PLANS FILED H | $541,949 |
| M00664815-S1-PL | 2022-05-25 | Plumbing | 1573 MADISON AVENUE | NEW LOW PRESSURE GAS SERVICE OUTDOOR METERING RIG WITH BOOSTERS, MAXON VALVES AND SWING OVER EXISITING GAS PIPING TO NEW & EXISTING GAS SYSTEM IN BUILDING. COLD WATER PIPING MODIFI | $50,000 |
| X00181234-I1-PL | 2021-09-07 | Plumbing | 298 HALLECK STREET | FILING FOR CONSTRUCTION OF NEW ON-SITE STORMWATER DETENTION SYSTEM WITH ASSOCIATEDCATCH BASINS AND PIPING FOR THE PROPOSED MULTI-TENANT WAREHOUSE FACILITY FILED UNDER DOB NB APP. # | $1,247,073 |
| M00456894-S1-PL | 2021-07-20 | Plumbing | 210 EAST 109 STREET | THE SCOPE OF WORK INCLUDES THE REPLACEMENT OF THE EXISTING FUELOIL BURNERS WITH NATURAL GAS BURNERS. WORK INCLUDES BUT IS NOTLIMITED TO: NEW: CONTROL PANELS, BREECHING,CHIMNEY LINE | $300,000 |
| B00488224-S1-PL | 2021-07-20 | Plumbing | 970 VERMONT STREET | SUBSEQUENT FILING FOR BOILER BURNER CONVERSION WORK. PLUMBING WORK INCLUDES BUT IS NOT LIMITED TO: NEW GAS PIPING, GAS METERS, CITY WATER PIPING, AND RPZ. | $100,000 |
| M00231734-I1-PL | 2019-11-06 | Plumbing | 410 EAST 105 STREET | INSTALLATION OF TEMPORARY GAS PIPING TO CONNECT TWO TEMPORARY MOBILE BOILERS WITH EXISTING GAS SERVICE. | $20,000 |
| S00224144-I1-PL | 2019-11-01 | Plumbing | 546 GULF AVENUE | Installation of water closets, lav, floor drains, Urinals and sanitary lines as per plans. | $30,000 |
| M00204183-I1-PL | 2019-09-05 | Plumbing | 110 EAST 129 STREET | INSTALLATION OF PLUMBING PIPING TO TEMPORARY MOBILE BOILER IN THE BUILDING PARKING LOT TO PROVIDE HEAT IN THE HEATING SEASON DURING HEATING PLANT UPGRADE. | $30,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →