COMPANY RECORD · NEW YORK, NY
Acs System Associates Inc — permit history in New York, NY
Acs System Associates Inc appears on 149 New York permit records from 2021 through 2026, most often mechanical / hvac (77.3% of the record).
Licence on record
| Number as published by the authority | Permits filed under it |
|---|---|
| 014698 | 163 |
The number is reproduced as New York published it. A licence appearing on a permit does not prove it is current: check status and expiry with the issuing authority before acting.
Business record held by the regulator
| Name as registered | ACS SYSTEM ASSOCIATES INC |
|---|---|
| Business address on file | 101 NEW SOUTH ROAD HICKSVILLE NY 11801 |
| Business phone on file | (516) 681-1350 |
| Licence number | 14698 |
| Licence type | GENERAL CONTRACTOR |
| Status in the register | ACTIVE |
Read from DOB License Info, published by the NYC Department of Buildings; our copy is from 2026-10-31. The name, address and phone are those the company filed with the regulator, reproduced as published. A permit shows the licence was on file the day it was filed. These rows show what the regulator holds now. The record is matched to Acs System Associates Inc by company name, and only where that name resolves to exactly one licence in the register — a rule measured at 99.4% correct against permits whose licence number we already know. Verify with the authority before acting on it.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Mechanical / HVAC | 126 | 77.3% |
| General construction | 37 | 22.7% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 5 |
| 2022 | 30 |
| 2023 | 38 |
| 2024 | 28 |
| 2025 | 41 |
| 2026 | 21 |
Busiest year on record: 2025, with 41 permits. One project can account for several filings, so read this as filing activity rather than workload.
PROJECTS AHEAD SEARCH
Search every New York permit, not only this company's
This page is a snapshot of Acs System Associates Inc. The search behind it holds more than 352,308 New York permits naming a contractor, since 2019: 151,351 building permits, 117,270 plumbing permits, 72,431 mechanical (HVAC) permits, 43,000 fire protection permits.
- Search the full history by company, address, permit type or date range.
- Set an alert and get an email when a new permit matches — the next permit Acs System Associates Inc files, or any new mechanical (HVAC) permit in New York. A new permit is an early signal of work to bid on, supply or finance.
- Export to CSV for your CRM or spreadsheet.
Free account: newest 7 days of records, 10 searches a day and 1 daily alert. Full history, CSV export and instant alerts on paid plans from $49 a month ($24.50 for the first 3 months). Compare plans
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Ashnu International Inc | 7 | 2023-12-05 |
| Alliance Tri-State Constr | 4 | 2025-12-03 |
| Empire Control Abatement | 4 | 2025-04-08 |
| Nikhi Contracting Corp | 3 | 2025-11-18 |
| National Enviromental Saf | 3 | 2023-03-14 |
| Northeast Restoration Cor | 3 | 2026-05-19 |
| Maven Construction, Corp | 2 | 2025-07-02 |
| Positive Elec Assoc Inc | 2 | 2025-02-24 |
| Innovax-Pillar Inc | 2 | 2023-03-03 |
| Neelam Construction Corp | 2 | 2025-10-10 |
| Litehouse Builders Inc | 2 | 2025-07-29 |
| 2 Saab Construction Inc | 1 | 2025-03-31 |
38 companies are named alongside Acs System Associates Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1925 ORIENTAL BOULEVARD | 2026-09-28 |
| 88-07 102 STREET | 2026-08-03 |
| 975 EAST 16 STREET | 2026-07-24 |
| 790 EAST NEW YORK AVENUE | 2026-07-16 |
| 1150 CARROLL STREET | 2026-07-02 |
| 9420 GUY R BREWER BOULEVARD | 2026-05-22 |
| 1390 WILLOUGHBY AVENUE | 2026-05-19 |
| 116-11 BEACH CHANNEL DRIVE | 2026-04-23 |
| 85-28 BRITTON AVENUE | 2026-04-06 |
| 23-21 44 DRIVE | 2026-03-17 |
| 1000L RICHMOND TERRACE | 2026-03-10 |
| 169-09 137 AVENUE | 2026-02-24 |
| 61-15 OCEANIA STREET | 2026-02-17 |
| 885 BOLTON AVENUE | 2026-02-12 |
116 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $50,000,000, median $651,347. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Varsity Plbg And Htg Inc | 14 | 2022–2025 |
| Eagle 1 Mechanical, Inc | 9 | 2022–2025 |
| Mar-Sal Plbg & Htg, Inc | 8 | 2021–2026 |
| Ashnu International Inc | 7 | 2021–2026 |
| Forsythe Plbg & Htg Corp | 6 | 2022–2026 |
| Empire Control Abatement | 6 | 2022–2026 |
| Eastern Plbg & Mech Contr | 5 | 2021–2026 |
| A&H Express Plbg&Htg Corp | 5 | 2023–2026 |
Companies that also appear in New York permit records at addresses where Acs System Associates Inc filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
149 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| B01270412-I1-MS | 2026-09-28 | Mechanical / HVAC | 1925 ORIENTAL BOULEVARD | Install new AHU-1 w/ DC-1 and AHU-2; modify ductwork & hot/chilled-water piping; add exhaust fans, diffusers/grilles, dampers, controls & duct smoke detector; UV disinfection; seal | $1,500,000 |
| Q01018444-S1-MS | 2026-08-03 | Mechanical / HVAC | 88-07 102 STREET | Removal & installation of mechanical unit and associated duct, & piping related to Electrification/Heat pump systems and Electrical service upgrade at Q273 | $3,800,000 |
| B00606269-I1-GC | 2026-07-24 | General construction | 975 EAST 16 STREET | Filing herewith application for interior renovations and roof replacement. No change in use, egress or occupancy. | $4,000,000 |
| B00967664-S2-GC-CX | 2026-07-16 | General construction | 790 EAST NEW YORK AVENUE | Remove existing roof dunnage and replace with new roof dunnage. Provide new concrete equipment pads in mechanical space. | $3,999,900 |
| B08022290-I1-GC | 2026-07-02 | General construction | 1150 CARROLL STREET | PROPOSED ARCHITECTURAL SCOPE OF WORK OF MEDGAR EVERS COLLEGE PHASE 2- ELECTRICAL DISTRIBUTION UPGRADE- TO REPAIR EXISTING ELECTRICAL ROOM | $159,005 |
| B08022290-S2-MS | 2026-06-11 | Mechanical / HVAC | 1150 CARROLL STREET | PROPOSED MECHANICAL WORK AT MEDGAR EVERS COLLEGE PHASE 2- ELECTRICAL DISTRIBUTION UPGRADE- TO REMOVE EXISTING EXHAUST FAN,GRILLS; AND INSTALL NEW ROOFTOP EXHAUST FAN AND GRILL. | $34,006 |
| Q01025189-I1-MS | 2026-05-22 | Mechanical / HVAC | 9420 GUY R BREWER BOULEVARD | MECH WORK ON CEL, BAS, & 4TH FL OF 5 STORY BUILDING CONSISTING OF REPLACE OF VAV, ASSOCIATED DUCT WORK TO ACCOMMODATE REPLACEMENT OF COLD PIPING, & MECHANICAL BOILER PIPING TO DOME | $104,000 |
| B00955364-I1-MS | 2026-05-19 | Mechanical / HVAC | 1390 WILLOUGHBY AVENUE | K162-NEW ROOF TOP AIR SOURC HEAT PUMP , MAKE UP AIR UNIT, ELECTRIC HEATING UNITS & MOTORIZED DAMPERS | $10,000,000 |
| Q00672444-I1-MS | 2026-04-23 | Mechanical / HVAC | 116-11 BEACH CHANNEL DRIVE | Mechanical work in conjunction with NB | $1,771,000 |
| Q01004422-S2-MS | 2026-04-06 | Mechanical / HVAC | 85-28 BRITTON AVENUE | Mechanical work associated with alteration of existing building. No change to use, egress, or occupancy. | $438,850 |
| Q00997765-I1-MS | 2026-04-03 | Mechanical / HVAC | 85-28 BRITTON AVENUE | Provide (2) Air Handling Units and associated ductwork and chilled water, steam and condensate piping. Provide (2) fans and associated ductwork. Provide (3) Split System and associ | $1,199,996 |
| Q01261924-S1-MS | 2026-03-17 | Mechanical / HVAC | 23-21 44 DRIVE | SUBSEQUENT FILING FOR MECHANICAL WORK FOR 3RD FLOOR AS PER PLANS FILED HEREWITH. | $675,000 |
| S08029259-I1-GC-CX | 2026-03-10 | General construction | 1000L RICHMOND TERRACE | Trenching starting from BLDG (L) to buildings G, S, & M. And trenching from BLDGs R to T as shown on approved plans for Snug Harbor Campus Grounds for mechanical piping into the sa | $648,000 |
| S08029259-I1-GC-CX | 2026-03-10 | Mechanical / HVAC | 1000L RICHMOND TERRACE | Trenching starting from BLDG (L) to buildings G, S, & M. And trenching from BLDGs R to T as shown on approved plans for Snug Harbor Campus Grounds for mechanical piping into the sa | $648,000 |
| Q00986936-I1-GC | 2026-02-24 | General construction | 169-09 137 AVENUE | NEW CEILING AND MINOR PARTITION ALTERATIONS IN CONJUNCTION WITH HVAC UPGRADE | $400,000 |
| Q00986936-S1-MS | 2026-02-24 | Mechanical / HVAC | 169-09 137 AVENUE | HVAC UPGRADE | $1,500,000 |
| Q01119600-S1-MS | 2026-02-17 | Mechanical / HVAC | 61-15 OCEANIA STREET | Q074-REPLACE GRAVITY VENTILATORS WITH NEW. REPLACE DUCTLESS AC SYSTEM WITH SPLIT HEAT PUMP SYSTEM. | $5,000,000 |
| X01159141-S2-MS | 2026-02-12 | Mechanical / HVAC | 885 BOLTON AVENUE | Installation of new exhaust fan, make up air unit on the roof and duct work from the fans to the science classroom. | $200,000 |
| Q00804655-I1-MS | 2026-02-06 | Mechanical / HVAC | 61-15 OCEANIA STREET | Q074_Provide new flood gates, concrete curbs, wrought iron fencing, concrete sump pit, concrete pit, float and thermostatic traps. Modify existing fencing and concrete curbs. Remov | $2,591,972 |
| Q00804655-I1-MS | 2026-02-06 | General construction | 61-15 OCEANIA STREET | Q074_Provide new flood gates, concrete curbs, wrought iron fencing, concrete sump pit, concrete pit, float and thermostatic traps. Modify existing fencing and concrete curbs. Remov | $2,591,972 |
| X00347070-I1-MS | 2026-01-20 | Mechanical / HVAC | 947 CASTLE HILL AVENUE | Installation of HVAC units proposed for Castle Hill Library. No change to use, occupancy or egress. | $110,000 |
| X01131059-S1-MS | 2025-12-03 | General construction | 244 EAST 163 STREET | Remove (1) air cooled split system/install new cooled split system, temporary remove (13) existing roof mounted exhaust fans and re-install after work is completed; remove (2) exh | $180,000 |
| X01131059-S1-MS | 2025-12-03 | Mechanical / HVAC | 244 EAST 163 STREET | Remove (1) air cooled split system/install new cooled split system, temporary remove (13) existing roof mounted exhaust fans and re-install after work is completed; remove (2) exh | $180,000 |
| X01131059-I1-GC | 2025-12-03 | General construction | 244 EAST 163 STREET | Repointing existing masonry, install parapet railing, coping cast stones/flashing/replace roof drains/associated piping/concrete deck/roof assembly with pavers/waterproofing/Cold a | $7,000,000 |
| B00308590-I1-MS | 2025-12-02 | Mechanical / HVAC | 559 PARK AVENUE | Install emergency generator as per plans filed. All gas work filed under NB #320912553, no change to use egress or occupancy | $10,000 |
| M01018587-S3-MS | 2025-11-18 | Mechanical / HVAC | 122 AMSTERDAM AVENUE | Installation of dehumidification system, installation of exhaust fan, purge fan and heat exchanger piping and ductwork, air balancing for HA system, BMS system | $690,800 |
| B08032271-I1-GC | 2025-10-30 | General construction | 186 JAY STREET | VOORHEES HALL HVAC REPLACEMENT: General Construction consisting of Non-Structural demolition and Construction repair related to the removal of old HVAC systems and installation of | $1,200,000 |
| Q00885054-I1-MS | 2025-10-10 | General construction | 137-35 NORTHERN BOULEVARD | HEATING VENTILATING AND AIR CONDITIONING SYSTEMS AND DISCONNECT AND REMOVE EXISTING RTU SERVING AUDITORIUM. PROVIDE NEW PACKAGED RTU SERVING THE AUDITORIUM. NEW RTU TO BE OF SAME F | $1,840,000 |
| Q00885054-I1-MS | 2025-10-10 | Mechanical / HVAC | 137-35 NORTHERN BOULEVARD | HEATING VENTILATING AND AIR CONDITIONING SYSTEMS AND DISCONNECT AND REMOVE EXISTING RTU SERVING AUDITORIUM. PROVIDE NEW PACKAGED RTU SERVING THE AUDITORIUM. NEW RTU TO BE OF SAME F | $1,840,000 |
| B08032321-I1-MS | 2025-10-03 | Mechanical / HVAC | 186 JAY STREET | VOORHEES HALL HVAC REPLACEMENT: REPLACEMENT OF HVAC SYSTEM AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $2,400,000 |
| B08018297-S2-MS | 2025-10-01 | Mechanical / HVAC | 1150 CARROLL STREET | (AHU) AIR HANDLING UNIT REPLACEMENT AND REPLACEMENT OF ROOFTOP EXHAUST FANS. INSTALLATION OF NEW CONDENSING UNIT ON THE ROOF. | $1,281,014 |
| M07998003-I1-MS | 2025-09-22 | Mechanical / HVAC | 100 CENTER STREET | Modification to the existing Mechanical system in the Men's & Women's bathroom. No change of use, egress or occupancy. | $36,747 |
| M01154826-S1-MS | 2025-09-10 | Mechanical / HVAC | 292 GREENWICH STREET | Provide new Fire Smoke Dampers, Smoke Dampers and Duct Smoke Detectors. | $66,259 |
| M00945826-I1-GC | 2025-09-03 | General construction | 1589 AMSTERDAM AVENUE | GENERAL CONSTRUCTION WORK TO THE SECOND AND THIRD FLOOR OF CUNY SOPHIE DAVIS BIOMEDICAL SCHOOL FOR INTERIOR UPGRAGES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPA | $300,000 |
| Q01103894-S1-MS | 2025-08-27 | Mechanical / HVAC | 34-33 JUNCTION BOULEVARD | Herewith filing for Demo of the exist roof exhaust fans, filter houses & exhaust ductwork and replacing with new . Provide VFDs for new fans. Removing and reinstalling 2 existing A | $255,000 |
| B08018297-I1-GC | 2025-08-25 | General construction | 1150 CARROLL STREET | PROPOSED ARCHITECTURAL SCOPE OF WORK OF MEDGAR EVERS COLLEGE PHASE 2- (AHU) AIR HANDLING REPLACEMENT OF EXISTING WINDOWS, WINDOWS FRAMES, REPAIR INTERIOR ELEMENTS. | $273,000 |
| B00967664-S1-GC | 2025-08-20 | General construction | 790 EAST NEW YORK AVENUE | Remove existing dunnage at roof and provide new dunnage. Provide new concrete equipment pads at 2nd floor mechanical space. Provide fire stopping at all new pipe and conduit penet | $3,999,900 |
| B00967664-I1-MS | 2025-08-20 | Mechanical / HVAC | 790 EAST NEW YORK AVENUE | Replace existing (1) chiller and (1) condensing unit and associated equipment with (1) new Heat Pump Chiller/Heater and associated new equipment. Replace associated chilled water p | $3,999,900 |
| Q00335705-I1-MS | 2025-08-20 | Mechanical / HVAC | 34-52 107 STREET | Mechanical system and associated piping as per plans filed. | $43,641 |
| S00954659-S2-MS | 2025-08-05 | Mechanical / HVAC | 55 LAYTON AVENUE | Remove & reinstall fans, vents, condensing units and related piping on new prefabricated roof curbs and install new exhaust fans | $115,218 |
| M00951319-I1-MS | 2025-07-29 | Mechanical / HVAC | 319 EAST 117 STREET | Removal of existing oil fired steam heating plant, heating and ventilation units, provide new split systems, heat pumps electric convector heaters, | $50,000,000 |
| Q01017811-S4-MS | 2025-07-02 | Mechanical / HVAC | 248-05 86 AVENUE | Provide new exhaust fans and gravity ventilators, reinstall condensing unit after roofing system replacement completion. | $2,000,000 |
| Q01017575-I1-MS | 2025-06-24 | Mechanical / HVAC | 95-16 89 AVENUE | PS 306 (Q262): Replace 4 rooftop HVAC units with new heat pump HVAC equipment. Replace exhaust fans and split system condensing units. No change to use, egress or occupancy. | $1,950,000 |
| B01005646-S1-MS | 2025-06-20 | Mechanical / HVAC | 1390 WILLOUGHBY AVENUE | Remove portions of existing ductwork abandoned in place as related to new fire rated construction for new fire rescue rooms. Cap all existing ducts to remain. Install new toilet ex | $154,090 |
| Q08040608-I1-MS | 2025-06-17 | Mechanical / HVAC | 143-10 SPRINGFIELD BOULEVARD | Installation of new heating and ventilation unit HV-13, new exhaust fans, and related Covid ventilation mechanical work. | $2,500,000 |
| M00921904-S2-MS | 2025-05-22 | Mechanical / HVAC | 401 WEST 164 STREET | Work includes replacement of existing rooftop exhaust fans/ventilators, Install motorized dampers in basement ductwork. Replacement of piping for existing split system for MDF room | $204,990 |
| M00945857-I1-MS | 2025-05-15 | Mechanical / HVAC | 1589 AMSTERDAM AVENUE | MECHANICAL WORK TO THE SECOND AND THIRD FLOOR OF CUNY SOPHIE DAVIS BIOMEDICAL SCHOOL FOR INTERIOR UPGRAGES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY | $250,000 |
| M00708773-S3-MS | 2025-04-30 | Mechanical / HVAC | 444 WEST 56 STREET | Coordination of trades and obtaining permits and approvals | $22,000 |
| S00920468-S3-MS | 2025-04-29 | Mechanical / HVAC | 1 HANNAH STREET | *HUB CONSULTATION ACCEPTED* Herewith filing Mechanical Work in conjunction with new building. | $0 |
| M00926171-S1-MS | 2025-04-10 | Mechanical / HVAC | 315 EAST 67 STREET | M480: Install new ventilation connected to the existing mechanical equipment in the cellar. Wall mounted supply air grilles will remain, removal of hair dryer system. The entire ai | $2,399,985 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
