COMPANY RECORD · NEW YORK, NY
Empire Control Abatement — permit history in New York, NY
Empire Control Abatement appears on 112 New York permit records from 2021 through 2026, most often general construction (76.3% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 90 | 76.3% |
| Mechanical / HVAC | 28 | 23.7% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 8 |
| 2022 | 36 |
| 2023 | 17 |
| 2024 | 13 |
| 2025 | 17 |
| 2026 | 27 |
Busiest year on record: 2022, with 36 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| I.M.P. Plbg. & Htg. Corp | 20 | 2026-02-18 |
| Wdf Inc | 12 | 2023-11-28 |
| Mar-Sal Plbg & Htg, Inc | 10 | 2023-01-09 |
| Awl Industries Inc | 6 | 2026-02-17 |
| Eagle 1 Mechanical, Inc | 6 | 2025-10-09 |
| I.M.P. Plumbing & Heating Corp. | 5 | 2026-07-28 |
| Acs System Associates Inc | 4 | 2025-04-08 |
| Airtone Corp | 4 | 2025-07-21 |
| Ajit One Mech&Gen'l Contr | 3 | 2026-07-17 |
| Robert Parchment P&H.Inc | 3 | 2023-05-30 |
| Triumph Plumbing & Htg | 2 | 2026-06-29 |
| Varsity Plbg And Htg Inc | 1 | 2026-06-22 |
12 companies are named alongside Empire Control Abatement on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 145 CASSIDY PLACE | 2026-08-27 |
| 6015 18 AVENUE | 2026-08-07 |
| 439 WEST 49 STREET | 2026-07-24 |
| 20701 116 AVENUE | 2026-07-21 |
| 425 WEST 123 STREET | 2026-07-20 |
| 207-01 116 AVENUE | 2026-07-14 |
| 100 ESSEX DRIVE | 2026-07-06 |
| 62-85 FOREST AVENUE | 2026-06-22 |
| 890 CAULDWELL AVENUE | 2026-06-11 |
| 250 WEST 127 STREET | 2026-05-15 |
| 365 BEACH 56 STREET | 2026-05-15 |
| 8-21 BAY 25 STREET | 2026-04-28 |
| 138-30 LAFAYETTE STREET | 2026-04-10 |
| 191 VERMONT AVENUE | 2026-01-05 |
62 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,000 to $5,520,000, median $119,688. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
112 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| S01258131-I1-GC | 2026-08-27 | General construction | 145 CASSIDY PLACE | Application to be reviewed with the Development HUB. Site yard work and new 8'-0 high aluminum fence as per plans filed herewith. No change to use, egress or occupancy. | $1,294,200 |
| B01323386-I1-GC | 2026-08-07 | General construction | 6015 18 AVENUE | K048_ CTF_ Path of Travel Work. Provide a new drinking fountain along the path of travel of the parent project. No change in use, egress, or occupancy is proposed under this appli | $24,000 |
| M01342579-I1-GC | 2026-07-24 | General construction | 439 WEST 49 STREET | Existing School Building, M625, CTF Room Conversion, Path of Travel | $429,000 |
| Q01243244-I1-GC | 2026-07-21 | General construction | 20701 116 AVENUE | Minor Alteration - Convert three (3) rooms into a single Classroom | $418,590 |
| Q01243244-S2-MS | 2026-07-21 | Mechanical / HVAC | 20701 116 AVENUE | INSTALLATION OF NEW SPLIT HVAC SYSTEM FOR NEW CLASSROOM AND RELATED DUCKWORK | $33,500 |
| M01123727-I1-GC | 2026-07-20 | General construction | 425 WEST 123 STREET | M125 - POT- Remove grab bars and existing sinks, install new accessible sink, grab bars, mirrors, remove doors/install new/install new ADA Compliant toilet paper dispensers, remove | $24,960 |
| Q01296451-S1-MS | 2026-07-14 | Mechanical / HVAC | 207-01 116 AVENUE | Selective Demo/Removals; New Sheet Metal Work, Ductwork and Accessories; Install New: 1-(4-Ton) Outdoor Condenser, 1-(4-Ton) Indoor Unit; 1-ERV Unit, 1-Electric Duct Heater and ass | $120,152 |
| Q01296451-I1-GC | 2026-07-14 | General construction | 207-01 116 AVENUE | Remove/Discard: Existing Light Fixtures/Steel hatches/VCT Flooring/Ceramic Wall Tile/Shower Pan/Stone Wall/Existing Door/Frame/Paint and associated hardware. Install new door/wood | $200,000 |
| S01410544-S1-MS | 2026-07-06 | Mechanical / HVAC | 100 ESSEX DRIVE | Scope limited to removal of fan-powered VAV and associated ductwork. | $12,000 |
| S01410544-I1-GC | 2026-07-02 | General construction | 100 ESSEX DRIVE | CTF room conversion: Existing school building R043, first floor classrooms 162, 162A, 169, and second floor classrooms 269 and 271. | $1,196,545 |
| Q01290848-S1-MS | 2026-06-22 | Mechanical / HVAC | 62-85 FOREST AVENUE | Provide new exhaust air grille & associated volume damper. | $4,563 |
| X01315046-I1-GC | 2026-06-11 | General construction | 890 CAULDWELL AVENUE | CTF Room Conversion (DIAL) - Renovating existing classroom 950sf space | $319,200 |
| Q01290848-I1-GC | 2026-06-10 | General construction | 62-85 FOREST AVENUE | Q071 - CTF ROOM CONVERSION - CONVERT EXISTING 1ST FLOOR CLASSROOM #112 INTO A NEW SENSORY CLASSROOM #112 | $332,440 |
| M01355681-I1-GC | 2026-05-15 | General construction | 250 WEST 127 STREET | Convert Classroom 315 to a sensory room per drawings. Includes selective demo, refinish existing wood floor, install curtain/track, update lighting and receptacles, and furnish/ins | $245,398 |
| Q01328719-S1-MS | 2026-05-15 | Mechanical / HVAC | 365 BEACH 56 STREET | Installation of a new VRF heat pump system on the low roof, with the associated indoor AC unit installed in the new sensory room. The scope also includes modifications to the exist | $50,000 |
| Q01328719-I1-GC | 2026-05-14 | General construction | 365 BEACH 56 STREET | Renovation of interior space including new interior finishes. | $600,008 |
| Q01224330-S1-MS | 2026-04-28 | Mechanical / HVAC | 8-21 BAY 25 STREET | PROVIDE NEW EXHAUST AIR GRILLES AND PROVIDE NEW THERMOSTATS ASSOCIATED WITH EXISTING RADIATORS. | $12,000 |
| Q01224330-I1-GC | 2026-04-28 | General construction | 8-21 BAY 25 STREET | Q465, CTF Room Conversion of Room 230 into Classroom and Office. NO CHANGE IN USE, EGRESS, OR OCCUPANCY IS PROPOSED UNDER THIS APPLICATION. | $300,000 |
| Q01231148-S1-MS | 2026-04-27 | Mechanical / HVAC | 8-21 BAY 25 STREET | Provide new Unit Ventilator and associated Thermostat, Exhaust fan, Duct mounted Electric Heating coil and associated ductwork, controls and accessories. | $79,590 |
| Q01231148-I1-GC | 2026-04-27 | General construction | 8-21 BAY 25 STREET | Q465, CTF Room Conversion of Room B44 into Classrooms. NO CHANGE IN USE, EGRESS, OR OCCUPANCY IS PROPOSED UNDER THIS APPLICATION. | $220,500 |
| Q01323334-S1-MS | 2026-04-10 | Mechanical / HVAC | 138-30 LAFAYETTE STREET | Provide new exhaust grille w/volume damper & reconnect to existing ductwork. Provide new thermostat to control existing radiator in the room. | $8,633 |
| Q01323334-S1-MS | 2026-04-10 | General construction | 138-30 LAFAYETTE STREET | Provide new exhaust grille w/volume damper & reconnect to existing ductwork. Provide new thermostat to control existing radiator in the room. | $8,633 |
| Q01323334-I1-GC | 2026-04-07 | General construction | 138-30 LAFAYETTE STREET | Q202_ CTF Room Conversion of Rooms 142A/142bB into one full classroom. No change in use, egress, or occupancy is proposed under this application. | $125,376 |
| B01283395-S1-MS | 2026-02-25 | Mechanical / HVAC | 6015 18 AVENUE | Provide new thermostat and associated wiring and conduit. | $4,960 |
| B01283395-I1-GC | 2026-02-20 | General construction | 6015 18 AVENUE | K048, CTF Rooms Conversion of Room 307 into a new classroom. No change in use, egress, or occupancy is proposed under this application. | $112,500 |
| Q01127168-I1-GC | 2026-01-14 | General construction | 62-85 FOREST AVENUE | Q071 - Existing School Building - Renovation of Existing 3rd floor Girls Toilet Area; New handrail and edge protection at existing ADA Ramp | $90,000 |
| S01256456-I1-GC | 2026-01-05 | General construction | 191 VERMONT AVENUE | SELECTIVE REMOVAL: TOILETS, PARTITIONS, SINKS, FIXTURES CONVERTED TO ADA TOILET AND ONE NON ADA TOILET IN BOYS AND GIRLS BATHROOMS. INSTALL NEW ACCESSIBLE: MIRRORS, SINK, DOOR HARD | $95,900 |
| Q01228791-I1-GC | 2025-12-16 | General construction | 20701 116 AVENUE | Minor Alteration - Convert two rooms into a single Classroom | $272,404 |
| M01121140-I1-GC | 2025-11-12 | General construction | 586 WEST 177 STREET | Remove toilets/sinks/bathroom partitions/fixtures & install new accessible toilets/sinks with new partitions/fixtures/grab-bars. Install new mirrors/accessible mirror/accessible do | $34,386 |
| Q01197361-I1-GC | 2025-10-10 | General construction | 156-10 BAISLEY BOULEVARD | Existing school building Q400, Path of Travel at 1st floor related to Room conversion of Aeronautics Lab | $34,391 |
| X01158419-I1-GC | 2025-09-16 | General construction | 2055 MAPES AVENUE | Removal toilets, sinks, fixtures, grab bars, partitions, remove/replace in kind affected floor/wall tiles; install new accessible: mirror, sink, toilet, partitions, fixtures, grab | $21,000 |
| B01189588-I1-GC | 2025-08-05 | General construction | 3000 AVENUE X | REMOVAL PORTION OF PARTITION AT DRINKING FOUNTAIN ALCOVE, MARBLE BACKSPLASH, VINYL WALL BASE. INSTALLATION OF PARTITIONS, CERAMIC WALL TILE, VCT AND VINYL WALL BASE. PATCH EXISTING | $11,000 |
| S01215165-I1-GC | 2025-07-25 | General construction | 4108 VICTORY BOULEVARD | INSTALL NEW PARTITION IN EXISTING FIRST FLOOR OFFICE TO CREATE (2) TWO OFFICE SPACES. COSMETIC UPGRADES TO EXISTING SECOND FLOOR LIBRARY. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. IN | $453,801 |
| S01217082-I1-GC | 2025-07-21 | General construction | 191 VERMONT AVENUE | New Work: Millwork, Gypsum Board, CMU Wall, Paint, Tectum Wall Board, Hollow Metal Doors, Concrete floor Repair, Wood Doors, Acoustical Ceiling Tiles, New Entry Door, New Room Iden | $553,493 |
| X01129405-I1-GC | 2025-07-11 | General construction | 2055 MAPES AVENUE | X129 -Media Center - POT : Remove Toilets, partitions fixtures, existing sink, mirrors - install new accessible sink, toilet with partitions, fixtures and grab bars. Install new a | $40,002 |
| X01130339-I1-GC | 2025-07-11 | General construction | 2055 MAPES AVENUE | Media Center-Art/Visual/Music/Recording/Hearing/Technology/Sound Bearing Partition/Gypsum Suspended Ceiling/New Entry Door/2X4 Lay-In Ceiling Tile/ New Furniture/New Carpet w Sound | $179,200 |
| Q01155037-I1-GC | 2025-06-03 | General construction | 156-10 BAISLEY BOULEVARD | Q400 - Existing School Building - Room #164 Convert Existing Auto Shop to New Aeronautics Lab and Classroom | $1,494,900 |
| Q01124102-I1-GC | 2025-05-28 | General construction | 179-37 137 AVENUE | Q037_ Provide new drinking fountains and upgrade Boy's Toilet RM 358 along the Path of Travel. NO CHANGE IN USE, EGRESS, OR OCCUPANCY IS PROPOSED UNDER THIS APPLICATION | $28,500 |
| M00907755-I1-GC | 2025-05-20 | General construction | 93 NAGLE AVENUE | Interior Drinking Fountains | $10,182 |
| X01164981-I1-GC | 2025-04-25 | General construction | 2750 LAFAYETTE AVENUE | Room conversion project that includes the conversion of an existing Boys Locker Room and accessory rooms to new classrooms. Exterior work is the installation of an equipment pad w | $1,536,400 |
| B01154047-I1-GC | 2025-03-14 | General construction | 515 4 AVENUE | CONVERT THE EXISTING LIBRARY TO ONE ART/STEM CLASSROOM AND ONE DIGITAL-MEDIA LIBRARY. INSTALL NEW INTERIOR PARTITION, NEW MILLWORK, NEW INTERIOR LIGHTING, AND NEW ART SINK. NO CHAN | $464,428 |
| Q01175997-I1-GC | 2025-03-05 | General construction | 45-10 94 STREET | REMOVAL AND REPLACEMENT OF PARTITIONS, DOORS AND HARDWARE; LAY-IN ACOUSTIC TILE CEILING, VCT FLOORING. NEW GWB SOFFIT, WALL TILE WAINSCOT, VCT FLOORING AND VINYL BASE, SIGNAGE. | $219,990 |
| M01092354-I1-GC | 2025-01-29 | General construction | 586 WEST 177 STREET | Remove/replace existing floor,wall and ceiling finishes, remove existing partitions, provide door opening, non load bearing interior partitions, prove entrance/closet doors, patch, | $145,691 |
| Q01144466-I1-GC | 2025-01-17 | General construction | 14-30 BROADWAY | Selective removals furniture, radiator covers, existing flooring, interior windows/doors, ceiling conduits, smartboard/tackboards/shelving/lighting in room (562,562A and 568). Prov | $243,930 |
| X01091351-I1-GC | 2024-12-18 | General construction | 2055 MAPES AVENUE | PAINTING/REFINISHING (METAL/WOOD DOORS), WINDOW CLEANING, REMOVE/INSTALL FURNITURE, SHADES, VCT FLOORING REMOVAL, PATCH/REPAIR/PAINT WALLS, REPLACE SINK WITH ART SINK, RELOCATE LI | $198,000 |
| X01091351-S1-MS | 2024-12-18 | General construction | 2055 MAPES AVENUE | Remove grille/install new fire damper grille, Remove/Install Fin tube covers, remove steam traps/pneumatic steam control valves, remove/install supply piping runouts, Remove/Instal | $102,000 |
| X01091351-S1-MS | 2024-12-18 | Mechanical / HVAC | 2055 MAPES AVENUE | Remove grille/install new fire damper grille, Remove/Install Fin tube covers, remove steam traps/pneumatic steam control valves, remove/install supply piping runouts, Remove/Instal | $102,000 |
| M01110151-I1-GC | 2024-12-17 | General construction | 425 WEST 123 STREET | Remove/replace existg floor/wall/ceilng finish, remove/provide existg non load bear interior partitions. remove two (2) existing doors. Provide entrance/closet doors, patch/repair/ | $131,560 |
| B01098421-I1-GC | 2024-12-17 | General construction | 2609 EAST 7 STREET | GYPSUM BOARD PARTITIONS AND FURRING; GYPSUM BOARD PARTITION ACOUSTIC TYPE, ACOUSTIC TILE CEILING AND LIGHTING, GYPSUM BOARD CEILING AND SOFFIT, VINYL TILE FLOORING AND WALL BASE, D | $224,981 |
| Q01062161-I1-GC | 2024-12-09 | General construction | 62-85 FOREST AVENUE | Q071 - CTF ROOM CONVERSION - CONVERT EXISTING 3RD FLOOR CLASSROOMS 306, 308A & 308B INTO A NEW MULTIMEDIA CENTER ROOM #306 | $682,301 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
