COMPANY RECORD · NEW YORK, NY
Eagle 1 Mechanical, Inc — permit history in New York, NY
Eagle 1 Mechanical, Inc appears on 110 New York permit records from 2020 through 2026, most often plumbing (73% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 84 | 73% |
| Fire protection | 28 | 24.3% |
| General construction | 3 | 2.6% |
3 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2020 | 6 |
| 2021 | 10 |
| 2022 | 28 |
| 2023 | 15 |
| 2024 | 27 |
| 2025 | 17 |
| 2026 | 12 |
Busiest year on record: 2022, with 28 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Abc Construction Cont Inc | 10 | 2025-11-25 |
| Ashnu International Inc | 10 | 2024-06-18 |
| Empire Control Abatement | 6 | 2025-10-09 |
| Iannelli Construction Co | 5 | 2024-06-17 |
| R.A.M.S. Mechanical Inc | 4 | 2024-03-20 |
| Darcon Construction Inc | 3 | 2025-02-04 |
| Forte Construction Corp | 3 | 2024-03-20 |
| Positive Elec Assoc Inc | 3 | 2024-08-08 |
| Cvm Construction Corp | 3 | 2026-06-04 |
| Adam's European Contracti | 3 | 2026-07-17 |
| Technico Construction | 2 | 2026-01-30 |
| North Shore Climate Contr | 2 | 2023-12-29 |
26 companies are named alongside Eagle 1 Mechanical, Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1449 SHAKESPEARE AVENUE | 2026-07-17 |
| 282 EAST 3 STREET | 2026-06-22 |
| 214-43 35 AVENUE | 2026-06-04 |
| 75 MESEROLE AVENUE | 2026-06-03 |
| 214-33 35 AVENUE | 2026-06-02 |
| 4600 BROADWAY | 2026-04-07 |
| 1-55 54 AVENUE | 2026-03-05 |
| 3850 REVIEW PLACE | 2026-01-30 |
| 800 DIVISION ROAD | 2026-01-07 |
| 200 WEST 167 STREET | 2025-11-25 |
| 156-10 BAISLEY BOULEVARD | 2025-10-09 |
| 2055 MAPES AVENUE | 2025-07-24 |
| 18 BEAVER STREET | 2025-06-12 |
| 47-09 36 STREET | 2025-05-06 |
64 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $48,643,180, median $170,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
110 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| X00980590-S1-PL | 2026-07-17 | Plumbing | 1449 SHAKESPEARE AVENUE | Replace roof drains and relocate roof drains and vent pipes. | $80,482 |
| M07994887-I1-EW-SP | 2026-06-22 | Fire protection | 282 EAST 3 STREET | Modification of existing sprinkler system. No change in use, egress, or occupancy. | $159,000 |
| M00839549-S3-PL | 2026-06-10 | Plumbing | 282 EAST 3 STREET | NEW DOMESTIC WATER BOOSTERS, NEW BACKFLOW PREVENTER, NEW EMERGENCY GENERATOR GAS SERVICE, METER AND PIPING, FIXTURES CONNECTED TO EXISTING DISTRIBUTION PIPING, NEW CANOPY DRAINAGE | $50,400 |
| Q01128905-S3-PL | 2026-06-04 | Plumbing | 214-43 35 AVENUE | Q041- Roof, Parapet, & Exterior Masonry Replacement Plumbing Work | $1,000,000 |
| B00448149-S3-PL | 2026-06-03 | Plumbing | 75 MESEROLE AVENUE | Relocate existing sump pump, install new elevator sump pump in elevator shaft, selected bathrooms on Basement, 1st thru 4th floor to be upgraded to meet ADA requirements. | $599,250 |
| Q00730544-S3-PL | 2026-06-02 | Plumbing | 214-33 35 AVENUE | Removal of plumbing fixtures and installation of new plumbing fixtures associated with interior renovation of PS 41Q. | $30,007 |
| M01023321-S4-PL | 2026-04-07 | Plumbing | 4600 BROADWAY | PL: Remove all existing gas piping and all associated fixtures, including gas meter and cap back at street gas main. Note: this application is filed to separate the plumbing & spri | $109,800 |
| M01023321-S5-EW-SP | 2026-04-06 | Fire protection | 4600 BROADWAY | SP: Remove and replace all sprinkler heads associated with the installation of new HVAC work. Note: this application is filed to separate the plumbing & sprinkler filings and to su | $109,800 |
| Q01283831-S1-GC | 2026-03-05 | General construction | 1-55 54 AVENUE | Herewith filing for New seismic braces installation for Gas pipes. No change in use Egress of Occupancy. | $65,000 |
| Q01283831-I1-GC | 2026-03-05 | General construction | 1-55 54 AVENUE | Herewith filing for new seismic braces installation for sprinkler pipes. No change in use Egress of Occupancy. | $65,000 |
| X00875055-S2-PL | 2026-01-30 | Plumbing | 3850 REVIEW PLACE | Herewith filing Plumbing document for new school building | $0 |
| M00936068-S5-PL | 2026-01-07 | Plumbing | 800 DIVISION ROAD | M533 : EXTERIOR PLUMBING for the 5 Story Educational Structure with Entrance along Division Road; Install Connection of 10 Sanitary Sewer, 8 Sanitary Sewer, 8 Storm along Division | $0 |
| X01247140-S2-EW-SP | 2025-11-25 | Fire protection | 200 WEST 167 STREET | Relocate existing Sprinkler heads & extend existing piping as required. Provide New Sprinkler heads & extend existing piping as required. | $9,780 |
| X00875055-S5-PL | 2025-10-30 | Plumbing | 3850 REVIEW PLACE | Herewith filing subsequent underground plumbing document for new school building | $0 |
| Q01197361-S1-PL | 2025-10-09 | Plumbing | 156-10 BAISLEY BOULEVARD | Replace existing drinking fountains in the corridors of path of travel with ADA compliant fixture and reconnect to existing plumbing distribution. | $20,000 |
| X01130339-S2-PL | 2025-07-24 | Plumbing | 2055 MAPES AVENUE | X129-Audio Visual Recording Studio - Room 433 - Disconnect, Remove, Capping/Plugging and Discard (1) Existing sink. | $2,000 |
| B00863997-S3-PL | 2025-06-12 | Plumbing | 18 BEAVER STREET | NEW PLUMBING FIXTURES AND ASSOCIATED PIPING. NEW HOT WATER DISTRIBUTION FROM HEAT PUMP HOT WATER HEATER TO SERVE 1ST AND 2ND FLOOR PLUMBING FIXTURES. | $100,000 |
| Q01155037-S3-PL | 2025-06-10 | Plumbing | 156-10 BAISLEY BOULEVARD | Remove existing compressed air piping, provide protection on exposed gas piping with the lab space. Remove existing drinking fountain and cap cold water. Provide new funnel drain o | $15,000 |
| B00787074-S3-PL | 2025-05-20 | Plumbing | 18 BEAVER STREET | K120 : PLUMBING WORK : Replace 16 Roof Drains; 28 Vent Stacks Extensions and relocate 2 Vent Stacks on the Roofs. Remove 1 Gas Range, 1 2-Compartment Sink, 1 Dishwasher, 2 Draina | $500,000 |
| Q01166797-I1-PL | 2025-05-06 | Plumbing | 47-09 36 STREET | PS503Q - FILING HEREWITH FOR THE PLUMBING WORK FOR THE SCHOOL. | $10,000 |
| M01020891-S3-PL | 2025-04-15 | Plumbing | 4600 BROADWAY | Provide exterior site drain inlets and piping to existing site storm system. | $50,000 |
| M01020891-S1-PL | 2025-04-15 | Plumbing | 4600 BROADWAY | Remove and replace existing roof drains and partial associated storm piping. | $280,000 |
| M01089047-S3-PL | 2025-04-03 | Plumbing | 695 PARK AVENUE | Disconnect and removal of existing plumbing fixtures at various locations. Furnish and install new plumbing fixtures and associated piping at various locations. | $594,625 |
| M00688737-S4-PL | 2025-03-21 | Plumbing | 411 PEARL STREET | New 3 Gas Meter/Pipes/Valves/Controls to be installed. New 3 Gas pipe to be connected to existing 3 gas service. New Gas Booster Pump and associated piping, valves controls 4th flo | $20,000 |
| M01089098-S1-PL | 2025-02-12 | Plumbing | 912 LEXINGTON AVENUE | Adding one sink, ejector pump and point of use hot water heater. | $45,618 |
| X00694656-S1-PL | 2025-02-04 | Plumbing | 680 NEWMAN AVENUE | REMOVAL / DEMOLITION OF EXISTING STORM DRAINAGE (PIPING, STRUCTURES, ETC) AT EX ATHLETIC FIELD. PROVIDE NEW STORM DRAINAGE (PIPING, STRUCTURES, ETC.) AS RELATED TO THE ATHLETIC FI | $1,202,577 |
| X00694656-S6-PL | 2025-02-04 | Plumbing | 680 NEWMAN AVENUE | Replace Electric water heater. Replace 13 water closets, 6 Lavs, 2 urinals, 1 shower, 1 mop sink, 2 drinking fountains. Replace 4 floor drains. Add 1 new secondary RPZ. | $92,575 |
| Q01144466-S2-PL | 2025-01-31 | Plumbing | 14-30 BROADWAY | DISCONNECT, REMOVE, AND DISCARD (1) EXISTING SINK AND ONE (1) EXISTING DRINKING FOUNTAIN, ALL ASSOCIATED PIPING AND VALVES AND CAP AND PLUG AT DISCONNECTION. | $8,650 |
| X08022673-S5-EW-SP | 2025-01-27 | Fire protection | 383 EAST 139 STREET | Modification of existing sprinkler system to support Full Program ADA work | $2,170 |
| X01091351-S2-PL | 2024-12-18 | Plumbing | 2055 MAPES AVENUE | Existing sink to be disconnected and removed, with associated pipes, valves faucet and traps. Active disconnected drain to be plugged for future sink connection. New Art sink Sheld | $9,600 |
| B00996506-S1-PL | 2024-12-04 | Plumbing | 5800 TILDEN AVENUE | Provide One (1) New Drinking Fountain with Bottle Filler, Provide One (1) new drinking fountain, and disinfect domestic water system after the plumbing work described in items #s 1 | $10,000 |
| M00936068-S6-PL | 2024-11-27 | Plumbing | 800 DIVISION ROAD | M533 : Interior and Underground Plumbing for the 5 Story Educational Structure. No GAS Connection. | $0 |
| X00758859-S1-PL | 2024-11-04 | Plumbing | 680 NEWMAN AVENUE | PROVIDE NEW STORM WATER DETENTION AT TENNIS COURTS AND INCREASED DETENTION AT ATHLETIC FIELD AREA AS PART OFNYC DEP GREEN INFRASTRUCTURE PRACTICES. | $112,280 |
| B00957552-S1-PL | 2024-10-01 | Plumbing | 500 19 STREET | Refurbish existing toilets to ADA accessible, provide new fixtures, hot water heater, domestic water booster pump and related piping. PAA description in comments | $684,851 |
| B08004157-S2-PL | 2024-09-16 | Plumbing | 6565 FLATLANDS AVENUE | PL: Remove Piping and Provide New with Plumbing Fixtures. No Change in Use, Occupancy, or Egress. | $33,000 |
| Q00793388-S4-PL | 2024-09-03 | Plumbing | 129-33 155 STREET | plumbing work to accommodate New field house | $10,000,000 |
| B00697137-S3-PL | 2024-08-08 | Plumbing | 121 SARATOGA AVENUE | PS 137: Plumbing work in conjunction with new addition to school as per plans. No change in use egress or occupancy under this application. | $400,000 |
| B00611035-S5-EW-SP | 2024-06-24 | Fire protection | 185 ELLERY STREET | Interior sprinkler system alterations | $100,000 |
| M00700607-S3-EW-SP | 2024-06-18 | Fire protection | 319 EAST 117 STREET | Provide branch sprinkler piping and sprinkler heads in the new elevator shaft (top and bottom). | $80,000 |
| Q08025595-S3-PL | 2024-06-17 | Plumbing | 48-01 90 STREET | Wing C - Roof drain replacement | $49,990 |
| Q08025595-S5-PL | 2024-06-17 | Plumbing | 48-01 90 STREET | Wing A1 & A7: Replacement of 12 roof drains (6 on roof main building, 4 on roof gym & 2 on 2 fl roof).Relocation of the existing plumbing fixtures and reroute existing piping to cl | $300,226 |
| B00703399-I1-EW-SP | 2024-04-16 | Plumbing | 1 CLINTON STREET | HEREWITH FILING PLUMBING & SPRINKLER WORK AS PER PLANS FOR TENANT FIT OUT IN CONJUNCTION WITH NB APPLICATION #321197478. NO CHANGE IN USE, OCCUPANCY, OR EGRESS | $440,000 |
| B00703399-I1-EW-SP | 2024-04-16 | Fire protection | 1 CLINTON STREET | HEREWITH FILING PLUMBING & SPRINKLER WORK AS PER PLANS FOR TENANT FIT OUT IN CONJUNCTION WITH NB APPLICATION #321197478. NO CHANGE IN USE, OCCUPANCY, OR EGRESS | $440,000 |
| Q00850708-S2-PL | 2024-03-26 | Plumbing | 48-01 90 STREET | PROVIDE NEW SLEEVES AND LINK SEAL FITTINGS AT WATER SERVICE PIPING SANITARY PIPING AND FRESH AIR INTAKE PIPING AS SHOWN ON DRAWINGS REMOVE AND REINSTALL PIPING AS SHOWN ON DRAWINGS | $100,000 |
| Q00850708-S5-PL | 2024-03-26 | Plumbing | 48-01 90 STREET | INSTALLATION OF STORM INLET AND TRENCH. | $100,000 |
| Q00850708-S6-EW-SP | 2024-03-21 | Fire protection | 48-01 90 STREET | PROVIDE LINK SEAL FITTINGS IN EXISTING SPRINKLER WATER SERVICE PIPING PENETRATIONS | $100,000 |
| B08023579-S8-PL | 2024-03-20 | Plumbing | 4012 FORT HAMILTON PARKWAY | P.S. 004-K: EXTERIOR PLUMBING | $0 |
| B08023579-S4-PL | 2024-03-20 | Plumbing | 4012 FORT HAMILTON PARKWAY | P.S. 004-K: GENERAL PLUMBING FOR A PROPOSED SCHOOL BUILDING. | $1,000,000 |
| M01010685-I1-PL | 2024-03-20 | Plumbing | 163 EAST 84 STREET | 3K-M512 _ The plumbing application work is to Swap locations of the Standing Accessible drinking fountain and the 3K wheelchair-accessible drinking fountain. All as per the plans f | $500 |
| M00594556-S1-PL | 2024-03-13 | Plumbing | 40 IRVING PLACE | Replace existing sump pump and provide new floor drains. | $500,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →