COMPANY RECORD · NEW YORK, NY
Navillus Tile Inc — permit history in New York, NY
Navillus Tile Inc appears on 54 New York permit records from 2021 through 2026, most often general construction (82.5% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 47 | 82.5% |
| Mechanical / HVAC | 10 | 17.5% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 2 |
| 2022 | 2 |
| 2023 | 10 |
| 2024 | 15 |
| 2025 | 15 |
| 2026 | 13 |
Busiest year on record: 2024, with 15 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| S & L Plumbing & Heating | 6 | 2026-08-19 |
| North Shore Climate Contr | 4 | 2025-04-24 |
| Par Plumbing Co., Inc | 3 | 2026-08-24 |
| A & F Fire Protection Co | 2 | 2025-05-02 |
| Current Fire Protection I | 2 | 2024-04-16 |
| Eagle 1 Mechanical, Inc | 2 | 2026-01-07 |
| Forsythe Plbg & Htg Corp | 1 | 2026-04-14 |
| Franco Belli Plmg&Htg Son | 1 | 2026-05-14 |
| Jansons Assoicates, Inc | 1 | 2023-12-19 |
| Phase 1 Group Inc | 1 | 2025-02-12 |
| V. C. Vitanza Sons Inc | 1 | 2023-05-11 |
11 companies are named alongside Navillus Tile Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 107-25 WREN PLACE | 2026-08-14 |
| 179-01 90 AVENUE | 2026-08-14 |
| 800 DIVISION ROAD | 2026-07-15 |
| 1-55 54 AVENUE | 2026-05-07 |
| 420 BALTIC STREET | 2026-04-14 |
| 45 CLEVELAND PLACE | 2026-04-10 |
| 88-40 179 PLACE | 2025-08-27 |
| 408 63 STREET | 2025-07-31 |
| 107-01 WREN PLACE | 2024-10-29 |
| 46-10 70 STREET | 2024-07-31 |
| 2931 8 AVENUE | 2024-04-02 |
| 2965 8 AVENUE | 2024-04-02 |
| 2945 8 AVENUE | 2024-04-01 |
| 3761 10 AVENUE | 2024-03-07 |
23 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $40,852,900, median $150,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
54 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| Q00837292-I1-GC-CX | 2026-08-14 | General construction | 107-25 WREN PLACE | Q116 - TCU REMOVALS/ PLAYGROUND REDEVELOPMENT | $500,000 |
| Q00817599-I1-GC | 2026-08-14 | General construction | 179-01 90 AVENUE | P.S. 95-Q: PROPOSED RENOVATION OF EXISTING KITCHEN. | $999,996 |
| M01394477-I1-GC | 2026-07-15 | General construction | 800 DIVISION ROAD | FILING FOR NEW YORK HARBOR SCHOOL ANNEX - FILED HEREWITH FOR SEISMIC BRACING ( ELECTRICAL TRADE) IN CONJUNCTION WITH NB # M00936068-I1 AS PER PLANS. | $100,000 |
| M01391374-I1-GC | 2026-05-27 | General construction | 800 DIVISION ROAD | PROPOSED SEISMIC BRACING FOR SPRINKLER & STANDPIPE (ONLY). IN CONJUNCTION WITH NB APPLICATION M00936068-I1 AS PER PLANS FILED HEREWITH. | $7,500 |
| Q01368336-I1-GC | 2026-05-07 | General construction | 1-55 54 AVENUE | HEREWITH FILING FOR NEW SEISMIC BRACES INSTALLATION FOR ELECTRICAL. | $65,000 |
| Q01370941-I1-GC | 2026-05-07 | General construction | 1-55 54 AVENUE | HEREWITH FILING FOR NEW SEISMIC BRACES INSTALLATION FOR FUEL OIL PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $65,000 |
| B00502805-I1-GC | 2026-04-14 | General construction | 420 BALTIC STREET | NYCHA BOILER - INTERIOR RENOVATION TO BOILER ROOM SPACE AND MINOR EXTERIOR WORK FOR BOILER EQUIPMENTREMOVAL. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $347,850 |
| S01126745-S7-GC-CX | 2026-04-10 | General construction | 45 CLEVELAND PLACE | SAINT JOHN VILLA: SUBSEQUENT GEOTHERMAL WORK TYPE FOR PHASE II SITE PREPARATION OF A NEW SCHOOL COMPLEX. APPLICATION FILED IN CONJUNCTION WITH DOB # S01144839, S01149913, 500877063 | $5,184,000 |
| S01126745-S7-GC-CX | 2026-04-10 | Mechanical / HVAC | 45 CLEVELAND PLACE | SAINT JOHN VILLA: SUBSEQUENT GEOTHERMAL WORK TYPE FOR PHASE II SITE PREPARATION OF A NEW SCHOOL COMPLEX. APPLICATION FILED IN CONJUNCTION WITH DOB # S01144839, S01149913, 500877063 | $5,184,000 |
| S01126745-Z3-GC-CX | 2026-04-08 | General construction | 45 CLEVELAND PLACE | ST. JOHN VILLA: SUBSEQUENT FILING OF FOUNDATION, STRUCTURAL AND GENERAL CONSTRUCTION WORK TYPES FOR SITE PREPARATION OF A NEW SCHOOL COMPLEX. APPLICATION FILED IN CONJUNCTION WITH | $4,125,800 |
| S01126745-Z2-GC-CX | 2026-04-06 | General construction | 45 CLEVELAND PLACE | ST. JOHN VILLA: Subsequent filing of Earthwork and Civil General Construction for site work preparation of a new school complex. JOB FILED IN CONJUCTION S01144839, S01149913, 50087 | $15,772,512 |
| S01126745-I1-GC | 2026-04-02 | General construction | 45 CLEVELAND PLACE | SAINT JOHN VILLA: GENERAL CONSTRUCION WORK TYPE FOR PHASE II SITE PREPARATION OF A NEW SCHOOL COMPLEX. APPLICARION FILED IN CONJUNCTION WITH DOB # S01144839, S01149913, 500877063 | $1,018,641 |
| M00982731-I1-MS | 2026-02-06 | Mechanical / HVAC | 800 DIVISION ROAD | M533 : Installation of a Package Type Emergency Generator with Built-in 275 Gallon Belly Tank. | $100,000 |
| Q00815319-I1-GC-CX | 2025-12-17 | General construction | 179-01 90 AVENUE | P.S. 095-Q: PROPOSED MODIFICATION OF EXTERIOR WALL BUILDING IN EXISTING BUILDING TO INDICATE CONNECTION BETWEEN NEW AND EXISTING BUILDINGS. EXTERIOR WINDOWS AT NORTH WALL. FILED IN | $3,930,944 |
| Q08023576-S4-GC | 2025-08-27 | General construction | 88-40 179 PLACE | P.S. 95-Q Subsequent filing of GC-Civil. | $34,610 |
| B00649936-I1-GC | 2025-07-31 | General construction | 408 63 STREET | Buildout of new PreK space, interior partitions, ceiling and work per plans. No change in use, egress or occupancy. | $1,552,304 |
| Q00823318-S1-GC | 2025-04-24 | Mechanical / HVAC | 179-01 90 AVENUE | P.S. 95-Q: MECHANICAL AND LIGHTING WORK RELATED TO THE REPLACEMENT OF FIRE ALARM SYSTEM. | $49,997 |
| Q00823318-S1-GC | 2025-04-24 | General construction | 179-01 90 AVENUE | P.S. 95-Q: MECHANICAL AND LIGHTING WORK RELATED TO THE REPLACEMENT OF FIRE ALARM SYSTEM. | $49,997 |
| Q08023576-S8-GC | 2025-04-02 | General construction | 88-40 179 PLACE | P.S. 95-Q: SUBSEQUENT FILING OF ENVIRONMENTAL WORK TYPE FOR A NEW SCHOOL BUILDING. | $0 |
| Q08023576-S1-GC | 2025-04-02 | General construction | 88-40 179 PLACE | P.S. 95-Q: Addition of refrigerant piping, split system air-cooled heat pump systems, rooftop mounted air source heat pump units, mechanical and natural smoke purge, ductwork, elec | $1,000,000 |
| Q08023576-S1-GC | 2025-04-02 | Mechanical / HVAC | 88-40 179 PLACE | P.S. 95-Q: Addition of refrigerant piping, split system air-cooled heat pump systems, rooftop mounted air source heat pump units, mechanical and natural smoke purge, ductwork, elec | $1,000,000 |
| Q08023576-I1-ST | 2025-04-01 | General construction | 88-40 179 PLACE | P.S. 095-Q: PROPOSED NEW 4-STORY SCHOOL BUILDING. LIGHTING WORK AS WELL | $38,535,127 |
| Q08023576-I1-GC | 2025-04-01 | General construction | 88-40 179 PLACE | P.S. 095-Q: PROPOSED NEW 4-STORY SCHOOL BUILDING. LIGHTING WORK AS WELL | $38,535,127 |
| Q00823318-I1-GC | 2025-03-24 | General construction | 179-01 90 AVENUE | P.S. 095-Q: PROPOSED INTERIOR RENOVATION DUE TO INSTALLATION OF NEW FIRE ALARM SYSTEM AND REMOVAL OF EXISTING FIRE ALARM SYSTEM. | $49,997 |
| M00936068-S4-ST | 2025-03-20 | General construction | 800 DIVISION ROAD | M533 : GC/ST : Superstructure : Installation of reinforced Concrete Columns, Reinforced Concrete Beams, Slabs, Steel beams, Steel Girders, Joist, Reinforced Concrete Slabs on Metal | $0 |
| M00936068-S4-GC | 2025-03-20 | General construction | 800 DIVISION ROAD | M533 : GC/ST : Superstructure : Installation of reinforced Concrete Columns, Reinforced Concrete Beams, Slabs, Steel beams, Steel Girders, Joist, Reinforced Concrete Slabs on Metal | $0 |
| M00936068-I1-GC | 2025-03-14 | General construction | 800 DIVISION ROAD | HUB Consultation Accepted. Construction of a 5 Story Educational Structure with Roof and Roof Terraces with Entrance along Division Road. The Design of the Secondary Connection sha | $0 |
| M00936068-S8-MS | 2025-02-14 | Mechanical / HVAC | 800 DIVISION ROAD | M533 : 800 Division Road : Installation of Mechanical Systems including Ventilation, Cooling, heating and Dehumidification System associated units, ductwork, fittings, anchors | $0 |
| Q08012928-S5-GC | 2024-10-29 | General construction | 107-01 WREN PLACE | Q116 - Civil work related to NB | $1,000,000 |
| Q08012928-I1-GC | 2024-10-29 | General construction | 107-01 WREN PLACE | Q116- 4-story new school building | $300,000 |
| Q08012928-S4-MS | 2024-10-09 | Mechanical / HVAC | 107-01 WREN PLACE | Herewith filing subsequent Mechanical document in conjunction with New Building Q08012928 | $1,000 |
| Q08012928-S7-MS | 2024-10-09 | Mechanical / HVAC | 107-01 WREN PLACE | Q116 - SUB-SLAB DEPRESSURIZATION SYSTEM | $100,000 |
| Q08023576-I1-FO | 2024-10-08 | General construction | 88-40 179 PLACE | P.S. 095-Q: PROPOSED NEW 4-STORY SCHOOL BUILDING. LIGHTING WORK AS WELL | $38,535,127 |
| Q00639404-I1-MS | 2024-07-31 | Mechanical / HVAC | 46-10 70 STREET | Redistribution of heating, cooling and ventilation from AHU and boiler system. | $6,871,659 |
| Q00639385-I1-GC | 2024-07-31 | General construction | 46-10 70 STREET | New interior fit-out of primary school on cellar, 1st, 2nd, 3rd & 4th floors, and an elevator machine room on the 5th floor. Space will include a cafeteria and Multi-purpose room, | $23,586,334 |
| M08027291-I1-GC | 2024-04-02 | General construction | 2931 8 AVENUE | FILING FOR THE FOLLOWING AT THE POLO GROUNDS TOWERS 1, A NEW WASTE COLLECTION ROOM WILL REPLACE THE EXISTING INCINERATOR ROOMS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $150,000 |
| M08027400-I1-GC | 2024-04-02 | General construction | 2965 8 AVENUE | FILING FOR THE FOLLOWING AT THE POLO GROUNDS TOWERS 1, A NEW WASTE COLLECTION ROOM WILL REPLACE THE EXISTING INCINERATOR ROOMS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $250,000 |
| M08027588-I1-GC | 2024-04-01 | General construction | 2945 8 AVENUE | FILING FOR THE FOLLOWING AT THE POLO GROUNDS TOWERS 1, A NEW WASTE COLLECTION ROOM WILL REPLACE THE EXISTING INCINERATOR ROOMS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $150,000 |
| M00891491-I1-GC | 2024-03-07 | General construction | 3761 10 AVENUE | M502 - FILED HEREWITH FOR SEISMIC BRACING ( ELECTRICAL TRADE) IN CONJUNCTION WITH NB # 104214155 | $10,000 |
| M08027636-I1-GC | 2024-02-22 | General construction | 2989 FRED DOUGLASS BOULEVARD | FILING FOR THE FOLLOWING AT THE POLO GROUNDS TOWERS 4, A NEW WASTE COLLECTION ROOM WILL REPLACE THE EXISTING INCINERATOR ROOMS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $150,000 |
| X00766791-I1-GC | 2024-01-31 | General construction | 1302 EDWARD L GRANT HIGHWAY | P.S. 468-X: PROPOSED GREEN ROOF TERRACE AT NEW BUILDING. | $20,000 |
| M00634551-S2-MS | 2024-01-16 | Mechanical / HVAC | 3761 10 AVENUE | INSTALLATION OF A PACKAGED EMERGENCY GENERATOR TO SUPPLY EMERGENCY POWERS TO THE PROPOSED NEW SCHOOL BLDG. | $50,000 |
| X00439977-I1-MS | 2024-01-08 | Mechanical / HVAC | 1260 WARD AVENUE | 190128 PS 77X - HEREWITH FILING GENERATOR/FUEL STORAGE APPLICATION INCONJUNCTION WITH NB APPLICATION 201204437 | $1,000 |
| M08034119-I1-GC | 2023-12-22 | General construction | 2941 8 AVENUE | CONSTRUCTION OF 1 STORY NEW BUILDING FOR NEW PNEUMATIC WASTE COLLECTION SYSTEM FOR THE POLO GROUNDS NYCHA CAMPUS IN HARLEM. RELATED APPLICATIONS TO BE FILED AS SUBSEQUENT APPLICATI | $1 |
| M00904585-I1-GC | 2023-11-28 | General construction | 3761 10 AVENUE | Installation of seismic bracing on new sprinkler and standpipe systems. | $6,000 |
| M00898154-I1-GC | 2023-09-21 | General construction | 3761 10 AVENUE | PLUMBING SEISMIC DRAWINGS FOR NEW GAS PIPING AND BOOSTER PUMP INSTALLATION. FILED HEREWITH FOR SEISMIC BRACING ( PLUMBING TRADE) IN CONJUNCTION WITH NB # 104214155. NO CHANGE IN US | $30,000 |
| Q00548727-S1-GC | 2023-02-15 | General construction | 195-15 73 AVENUE | STRUCTURAL - FOR NEW 4-STORY BUILDING FILED UNDER DOB BIS 421899930 | $40,852,900 |
| Q00548727-S7-GC | 2023-02-15 | General construction | 195-15 73 AVENUE | Energy as related to MEP for NB filed under DOB# 421899930 | $10,000 |
| Q00548727-S4-GC | 2023-02-15 | General construction | 195-15 73 AVENUE | CIVIL - GENERAL CONSTRUCTION RELATED TO CIVIL OPEN SPACE | $6,493,275 |
| Q00548727-S1-ST | 2023-02-15 | General construction | 195-15 73 AVENUE | STRUCTURAL - FOR NEW 4-STORY BUILDING FILED UNDER DOB BIS 421899930 | $40,852,900 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
