COMPANY RECORD · NEW YORK, NY
Systems 2000 Plbg Svcs Ll — permit history in New York, NY
Systems 2000 Plbg Svcs Ll appears on 77 New York permit records from 2020 through 2026, most often plumbing (94.9% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 75 | 94.9% |
| Fire protection | 4 | 5.1% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2020 | 5 |
| 2021 | 14 |
| 2022 | 15 |
| 2023 | 12 |
| 2024 | 19 |
| 2025 | 8 |
| 2026 | 6 |
Busiest year on record: 2024, with 19 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Systems 2000 Plumbing Ser | 10 | 2025-05-08 |
| H & D Maintenance Co Inc | 2 | 2026-08-18 |
| Merrick Real Estate Gp In | 2 | 2023-06-09 |
| American C Const Inc | 1 | 2021-05-18 |
| Poler Contracting Inc | 1 | 2024-09-20 |
5 companies are named alongside Systems 2000 Plbg Svcs Ll on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 11 WEST 69 STREET | 2026-08-18 |
| 310 EAST 46 STREET | 2026-08-03 |
| 171 WEST 12 STREET | 2026-04-07 |
| 28 EAST 10 STREET | 2026-03-06 |
| 365 WEST 25 STREET | 2026-01-24 |
| 130 JACKSON STREET | 2026-01-07 |
| 2211 BROADWAY | 2025-11-17 |
| 465 WEST 23 STREET | 2025-09-03 |
| 336 WEST END AVENUE | 2025-08-26 |
| 473 WEST END AVENUE | 2025-06-30 |
| 315 SEVENTH AVENUE | 2025-06-17 |
| 43 5 AVENUE | 2025-05-08 |
| 5 WEST 65 STREET | 2025-01-10 |
| 81 IRVING PLACE | 2024-11-25 |
59 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $1,659,540, median $130,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
77 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01435092-S1-PL | 2026-08-18 | Plumbing | 11 WEST 69 STREET | GAS INFRASTRUCTURE RESTORATION, INSTALLATION OF NEW MASTER METER IN CELLAR, AND INSTALLATION OF APPLIANCE AND LOCK-WING VALVES AT ALL STOVES IN APARTMENTS. NO CHANGE IN EGRESS OR O | $350,000 |
| M01372696-I1-PL | 2026-08-03 | Plumbing | 310 EAST 46 STREET | Modifications to building's domestic cold water system. No change in use, egress or occupancy. | $230,000 |
| M01301991-I1-PL | 2026-04-07 | Plumbing | 171 WEST 12 STREET | Replacing new gas lines for each riser. No change to use, egress or occupancy. | $218,770 |
| M01139874-S1-PL | 2026-03-06 | Plumbing | 28 EAST 10 STREET | INSTALLATION OF NEW CIRCULATION LINES FOR EXISTING DOMESTIC WATER SYSTEM. INSTALLATION OF NEW DOMESTIC WATER BRANCH LINES. NO CHANGE IN EGRESS OR OCCUPANCY. | $125,000 |
| M01237504-I1-PL | 2026-01-24 | Plumbing | 365 WEST 25 STREET | Horizontal domestic gas piping replacement. Cellar floor only. No change in use, egress or occupancy. There are NO related DOB Now applications to this filing. This is solely a PL | $349,995 |
| B01224587-I1-PL | 2026-01-07 | Plumbing | 130 JACKSON STREET | Limited Drainage System Repair Program; includes installation of a Duplex Ejector Pump and Backwater valve at cellar level. No change to use, egress or occupancy. | $118,500 |
| M01158669-I1-PL | 2025-11-17 | Plumbing | 2211 BROADWAY | Plumbing-related work for Gas Piping System Upgrade. No change to use, egress or occupancy. | $72,500 |
| M01234182-I1-PL | 2025-10-28 | Plumbing | 2211 BROADWAY | Plumbing work related to Gas Piping System upgrade. No change to use, egress or occupancy. | $375,000 |
| M01011995-I1-PL | 2025-09-03 | Plumbing | 465 WEST 23 STREET | REPLACEMENT OF HORIZONTAL GAS PIPING IN THE CELLAR AND RELOCATION OF THE MASTER GAS METER, FOR DOMESTIC USE ONLY. ALL EXISTING GAS RISERS (LOCATED FROM CELLAR TO PENTHOUSE) ARE TO | $620,000 |
| M01247614-S1-PL | 2025-08-26 | Plumbing | 336 WEST END AVENUE | GAS INFRASTRUCTURE RESTORATION, INSTALLATION OF NEW MASTER METER IN CELLAR, AND INSTALLATION OF APPLIANCE AND LOCK-WING VALVES AT ALL STOVES IN APARTMENTS. NO CHANGE IN EGRESS OR O | $312,000 |
| M01107943-I1-PL | 2025-06-30 | Plumbing | 473 WEST END AVENUE | New domestic gas system. New gas master meter installation. No change in egress, use or occupancy. | $300,000 |
| M00692951-I1-PL | 2025-06-17 | Plumbing | 315 SEVENTH AVENUE | Remove abandoned gas meter and install new twin set for residential. Replace gas riser, piping, ranges for apartments (CEL to 022). Install 8 new gas dryers. One new sprinkler hea | $560,250 |
| M01120302-S1-PL | 2025-05-08 | Plumbing | 43 5 AVENUE | Install gas piping from cellar through 10 floor, replace horizontal piping in cellar to existing risers. The application is filed to remove the Con Ed Red Tag placed on the premise | $100,000 |
| M01086269-I1-PL | 2025-01-10 | Plumbing | 5 WEST 65 STREET | Installation of new gas meters, replacement of gas distribution header and repairs to the gas risers. | $300,000 |
| M08055040-I1-PL | 2024-11-25 | Plumbing | 81 IRVING PLACE | REPLACEMENT OF CELLAR LEVEL DOMESTIC GAS DISTRIBUTION PIPING, VERTICAL GAS RISERS, AND BRANCH GAS PIPING THROUGHOUT THE BUILDING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $510,000 |
| M01122307-I1-PL | 2024-11-25 | Plumbing | 333 EAST 43 STREET | DOMESTIC GAS REPLACEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $700,000 |
| M01058096-I1-PL | 2024-10-24 | Plumbing | 45 WEST 10 STREET | Replacement of existing building gas risers and new connections to existing apartment stoves per plans. No change in use, egress or occupancy. | $627,000 |
| M01087506-I1-PL | 2024-10-09 | Plumbing | 31 WEST 12 STREET | CONNECT NEW GAS PIPING TO A NEW GAS FIRE CLOTHES DRYER. DRYER TO CONNECT TO EXISTING DRYER VENT. NO EXTERIOR WORK. | $3,000 |
| M00993995-S1-PL | 2024-09-20 | Plumbing | 120 EAST 86 STREET | GAS INFRASTRUCTURE REHAB AND CONVERSION TO MASTER METER. INSTALLATION OF NEW APPLIANCE VALVES IN ALL APARTMENTS. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTI | $100,000 |
| M00942597-I1-PL | 2024-09-10 | Plumbing | 473 WEST END AVENUE | Domestic water, sanitary, and vent riser replacement throughout entire building. No change in use, egress or occupancy. | $650,000 |
| M01047261-I1-PL | 2024-05-30 | Plumbing | 285 LEXINGTON AVENUE | ON SUB-CELLAR LEVEL: EXISTING GAS METER ROOM-DISCONNECT EXISTING GAS METER AND REPLACE GAS PIPING AS INDICATED ON PLAN; EXISTING TENANT LAUNDRY ROOM, REMOVE FLEX HOSE AND INSTALL | $10,000 |
| M00936554-S3-EW-SD | 2024-04-29 | Fire protection | 336 WEST END AVENUE | INSTALLATION OF SPRINKLER SYSTEM FOR LAUNDRY ROOM IN CELLAR LEVEL. NO CHANGE IN EGRESS OR OCCUPANCY. | $9,670 |
| M00936554-S3-EW-SP | 2024-04-29 | Fire protection | 336 WEST END AVENUE | INSTALLATION OF SPRINKLER SYSTEM FOR LAUNDRY ROOM IN CELLAR LEVEL. NO CHANGE IN EGRESS OR OCCUPANCY. | $9,670 |
| M00926375-I1-PL | 2024-04-09 | Plumbing | 180 CABRINI BOULEVARD | Furnish and install new gas header in cellar with new takeoff valves. Furnish and install new gas riser complete with branch piping and appliance shutoff valves. Typical for 9 rise | $550,000 |
| M00929286-I1-PL | 2024-04-01 | Plumbing | 25 CENTRAL PARK WEST | PARTIAL REPLACEMENT OF THE PLUMBING RISERS SERVING THE F-LINE KIITCHENS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $150,000 |
| M08052668-I1-PL | 2024-03-19 | Plumbing | 611 WEST 111 STREET | laundry room renovations as per plans. no change in egress, use, or occupancy. | $30,000 |
| M00989697-I1-PL | 2024-03-11 | Plumbing | 363 GREENWICH STREET | HEREBY FILING TO RECONNECT GAS FIXTURES TO EXISTING GAS LINES FILED UNDER APPLICATION M00556800. NO CHANGE TO USE OF OCCUPANCY OR EGRESS. | $42,700 |
| M00925672-I1-PL | 2024-03-07 | Plumbing | 405 WEST 23 STREET | REPLACEMENT OF HORIZONTAL GAS PIPING IN CEL & RELOCATION OF MASTER GAS METER, FOR DOMESTIC USE ONLY. ALL EXIST. GAS RISERS (LOCATED FROM CEL TO PEN) ARE TO REMAIN, REPAIRS TO EXST. | $760,000 |
| M00970918-I1-PL | 2024-03-07 | Plumbing | 45 SUTTON PLACE SOUTH | Replacement of gas riser serving all floors of the G-Line apartments. No change in use, egress or occupancy. | $45,000 |
| M00925689-I1-PL | 2024-02-27 | Plumbing | 410 WEST 24 STREET | REPLACEMENT OF HORIZONTAL GAS PIPING IN THE CELLAR AND RELOCATION OF THE MASTER GAS METER, FOR DOMESTIC USE ONLY. ALL EXISTING GAS RISERS (LOCATED FROM CELLAR TO PENTHOUSE) ARE TO | $970,000 |
| M00989462-I1-PL | 2024-02-06 | Plumbing | 103 EAST 75 STREET | Upgrade of the domestic gas piping system. No change to use, egress or occupancy. | $80,500 |
| M00933481-I1-PL | 2024-01-17 | Plumbing | 28 EAST 10 STREET | Plumbing system upgrade per plans submitted herewith. No change in use, egress or occupancy. | $40,000 |
| M00863450-I1-PL | 2024-01-12 | Plumbing | 200 EAST 27 STREET | UPGRADE EXISTING BACKFLOW PREVENTER AND FILL PUMP SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $150,000 |
| M00925775-I1-PL | 2023-12-12 | Plumbing | 363 GREENWICH STREET | HEREBY FILING TO RECONNECT GAS FIXTURES TO EXISTING GAS LINES FILED UNDER APPLICATION M00556800. NO CHANGE TO USE OCCUPANCY OR EGRESS. | $18,000 |
| M00948631-I1-PL | 2023-12-08 | Plumbing | 363 GREENWICH STREET | HEREBY FILING TO RECONNECT GAS FIXTURES IN APARTMENT 4B TO EXISTING GAS LINES FILED UNDER APPLICATION M00556800. NO CHANGE TO USE OCCUPANCY OR EGRESS. | $26,500 |
| B00908145-I1-PL | 2023-12-05 | Plumbing | 75 LIVINGSTON STREET | REPIPING OF STORM / SANITARY SYSTEM LOCATED IN SUBCELLAR & CELLAR AREA. | $152,700 |
| M00905407-I1-PL | 2023-10-05 | Plumbing | 137 EAST 36 STREET | Repairs and replacement of gas piping. | $150,000 |
| M00812772-I1-PL | 2023-09-15 | Plumbing | 233 WEST 26 STREET | INSTALLATION OF NEW WATER HEATER IN PENTHOUSE LEVEL BOILER ROOM, AND INSTALLATION OF NEW GAS PIPING FOR WATER HEATER, PENTHOUSE BOILER, AND PENTHOUSE APARTMENT GAS RANGE. NO CHANGE | $60,000 |
| M08052665-I1-PL | 2023-09-07 | Plumbing | 605 WEST 111 STREET | LAUNDRY ROOM RENOVATION AS PER PLANS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY | $45,000 |
| M00854969-I1-PL | 2023-07-21 | Plumbing | 10 EAST 85 STREET | HEREBY FILING THIS APPLICATION TO PROPOSE A NEW LAUNDRY ROOM LOCATED IN THE CELLAR AS AN ACCESSORY USE TO THE BUILDING AS PER PLANS SUBMITTED. THIS APP DOES NOT REQUIRE A NEW OR AM | $20,480 |
| M00873032-I1-PL | 2023-07-01 | Plumbing | 261 EIGHTH AVENUE | PARTIAL DOMESTIC GAS RE-PIPING IN COMMERCIAL BUILDING #3. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $100,000 |
| M08018305-S1-PL | 2023-06-09 | Plumbing | 304 WEST 88 STREET | relocate 1 sink, replace 1 wc, 1 lav, 1 tub. 1 new dw | $5,000 |
| M08018308-S1-PL | 2023-06-09 | Plumbing | 304 WEST 88 STREET | replace 1 sink, 2 wc's, 1 lav , 1 tub, 1 new dw , 1 new lav, cap and remove 1 tub | $7,000 |
| M00838473-I1-PL | 2023-05-05 | Plumbing | 400 EAST 62 STREET | Plumbing work in conjunction with BIS Alt-1 Application #123055576 | $44,000 |
| M00781269-I1-PL | 2023-05-04 | Plumbing | 140 CABRINI BOULEVARD | Furnish and install new gas header in cellar with new takeoff valves. Furnish and install new gas riser complete with branch piping and appliance shutoff valves. Typical for 9 rise | $550,000 |
| M00347275-I1-PL | 2022-11-09 | Plumbing | 421 HUDSON STREET | FILING HEREWITH FOR THE PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF AN EXISTING SPACE. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY OR USE. | $5,000 |
| M07995209-I1-PL | 2022-10-28 | Plumbing | 160 CABRINI BOULEVARD | Furnish and install new gas header in cellar with new takeoff valves. Furnish and install new gas riser complete with branch piping and appliance shutoff valves. Typical for 9 rise | $550,000 |
| M08011860-I1-PL | 2022-10-18 | Plumbing | 345 8 AVENUE | Filing herewith for valve replacements . | $146,450 |
| M00616284-I1-PL | 2022-08-30 | Plumbing | 157 EAST 72 STREET | Gas piping investigation and replacement. No change in use, egress, or occupancy. | $500,000 |
| M00447617-I1-PL | 2022-08-25 | Plumbing | 374 WEST 11 STREET | SCOPE OF WORK INCLUDES REPLACEMENT OF EXISTING PLUMBING FIXTURES ON EXISTING ROUGHING AS INDICATED ON PLANS.NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $16,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
