COMPANY RECORD · NEW YORK, NY
Practical Plbg & Htg Inc — permit history in New York, NY
Practical Plbg & Htg Inc appears on 294 New York permit records from 2019 through 2026, most often plumbing (78.6% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 254 | 78.6% |
| Fire protection | 69 | 21.4% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 7 |
| 2020 | 25 |
| 2021 | 58 |
| 2022 | 73 |
| 2023 | 59 |
| 2024 | 58 |
| 2025 | 30 |
| 2026 | 13 |
Busiest year on record: 2022, with 73 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Magic Renovations Corp | 21 | 2026-02-12 |
| Sage Builders Corp | 8 | 2026-03-19 |
| City Line Construction.Ll | 7 | 2025-03-13 |
| Rfp Construction Inc | 6 | 2025-03-21 |
| Sami Construction & Remod | 5 | 2024-04-24 |
| Ruckercorp Inc | 5 | 2024-03-04 |
| Hite Construction Inc | 4 | 2024-07-11 |
| Artesa LLC | 4 | 2024-04-08 |
| Royal HVAC Systems Inc | 4 | 2022-09-13 |
| New York Floorman, LLC | 3 | 2021-11-12 |
| Kbrny, Inc | 3 | 2025-06-10 |
| 7 & 9 Alban LLC | 3 | 2024-01-30 |
37 companies are named alongside Practical Plbg & Htg Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 68-25 FOREST AVENUE | 2026-07-30 |
| 313 WEST 20 STREET | 2026-06-26 |
| 2449 MORRIS AVENUE | 2026-06-18 |
| 605 PARK AVENUE | 2026-05-28 |
| 720 GREENWICH STREET | 2026-05-22 |
| 33 EAST 70 STREET | 2026-05-01 |
| 170 WEST END AVENUE | 2026-04-27 |
| 5101 1 AVENUE | 2026-04-17 |
| 155 BANK STREET | 2026-03-19 |
| 64 EAST 86 STREET | 2026-03-11 |
| 955 FIFTH AVENUE | 2026-02-12 |
| 251 WEST 98 STREET | 2025-12-19 |
| 45 SUTTON PLACE SOUTH | 2025-12-15 |
| 94-15 MERRICK BOULEVARD | 2025-12-03 |
208 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $883,596, median $25,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
294 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| Q01391181-S1-PL | 2026-07-30 | Plumbing | 68-25 FOREST AVENUE | SUBSEQUENT FILING OF PLUMBING WORK IN CONJUNCTION WITH DOB#Q01391181-I1 (GC: RESTAURANT ALTERATION). WORK INCLUDES INSTALLATION OF PLUMBING FIXTURES (WATER/SANITARY, NO GAS FIXTURE | $30,000 |
| M01320880-I1-PL | 2026-06-26 | Plumbing | 313 WEST 20 STREET | Submitting filing for plumbing scope associated with a townhouse renovation in conjunction with Alt1 #M01295109. Work includes new piping and installation of all new fixtures. | $165,000 |
| X00851962-S5-EW-SP | 2026-06-18 | Fire protection | 2449 MORRIS AVENUE | Installation new sprinkler work in conjunction with X00851962-I1 | $75,000 |
| M01348972-I1-PL | 2026-05-28 | Plumbing | 605 PARK AVENUE | PLUMBING MODIFICATIONS IN APARTMENT 7D AS PER PLANS FILED HEREWITH. | $40,000 |
| M01284361-S1-PL | 2026-05-22 | Plumbing | 720 GREENWICH STREET | REPLACE THREE FIXTURE BATHROOM AND SINK, DISHWASHER AND STOVE IN KITCHEN. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | $18,000 |
| M01350029-I1-PL | 2026-05-01 | Plumbing | 33 EAST 70 STREET | Filing for the removal and installation of plumbing fixtures and piping related to the apartment renovation of 6D. | $165,000 |
| M01371206-S1-PL | 2026-04-27 | Plumbing | 170 WEST END AVENUE | Plumbing work filed in conjunction with apartment#3R renovation. | $30,000 |
| B01289621-I1-EW-SP | 2026-04-17 | Fire protection | 5101 1 AVENUE | SPRINKLER WORK AS PER PLANS FILED HEREWITH | $46,500 |
| B01237064-I1-PL | 2026-04-17 | Plumbing | 5101 1 AVENUE | PLUMBING WORK AS PER PLANS FILED HEREWITH | $129,500 |
| M01114719-S2-PL | 2026-03-19 | Plumbing | 155 BANK STREET | Plumbing fixture installation at the cellar and first floor. | $25,000 |
| M01114719-S3-EW-SP | 2026-03-19 | Fire protection | 155 BANK STREET | Installation of sprinkler heads at cellar level. | $29,000 |
| M01302033-I1-PL | 2026-03-11 | Plumbing | 64 EAST 86 STREET | Plumbing work at apt. #14AB at the 14th Floor indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application | $137,500 |
| M01350702-S1-PL | 2026-02-12 | Plumbing | 955 FIFTH AVENUE | MINOR INTERIOR RENOVATION OF APT #4/5A INCLUDING KITCHEN, BATHROOM, MINOR LAYOUT REVISIONS AND FINISHES. FILED IN CONJUNCTION WITH M01350702-I1 AND RELATED MECHANICAL FILING M01251 | $42,000 |
| M01325005-S1-PL | 2025-12-19 | Plumbing | 251 WEST 98 STREET | REPLACEMENT AND RELOCATION OF FIXTURES AT APT 3A. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $27,000 |
| M01329056-S1-PL | 2025-12-15 | Plumbing | 45 SUTTON PLACE SOUTH | Replace Plumbing fixtures at existing rough-in, as per plans submitted. No change to use, egress or occupancy. | $26,000 |
| Q01233631-I1-PL | 2025-12-03 | Plumbing | 94-15 MERRICK BOULEVARD | INSTALLATION OF GAS PIPING TO SERVE A GAS FURNACE UNIT IN CONJUNCTION WITH Q00491584-I1. | $20,000 |
| M01250534-S1-PL | 2025-10-21 | Plumbing | 140 CABRINI BOULEVARD | PLUMBING SCOPE ASSOCIATED WITH INTERIOR RENOVATION AND COMBINATION OF UNITS 84 AND 85 IN COMPLIANCE WITH TPPN 03/97 AS PER PLANS SUBMITTED HEREWITH. PLUMBING SCOPE IS FILED AS A SU | $28,000 |
| B01231458-S1-PL | 2025-10-15 | Plumbing | 90 8 AVENUE | Installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy | $12,000 |
| B01003970-I1-PL | 2025-10-09 | Fire protection | 287 AVENUE X | INSTALL FIRE SPRINKLER SYSTEM AS PER PLANS. | $43,000 |
| B01003970-I1-PL | 2025-10-09 | Plumbing | 287 AVENUE X | INSTALL FIRE SPRINKLER SYSTEM AS PER PLANS. | $43,000 |
| B01003970-I1-EW-SP | 2025-10-09 | Fire protection | 287 AVENUE X | INSTALL FIRE SPRINKLER SYSTEM AS PER PLANS. | $43,000 |
| B01003970-I1-EW-SP | 2025-10-09 | Plumbing | 287 AVENUE X | INSTALL FIRE SPRINKLER SYSTEM AS PER PLANS. | $43,000 |
| M01194015-S1-PL | 2025-10-06 | Plumbing | 348 WEST 48 STREET | Plumbing work file in conjunction with renovation of apartment# 2W on the second floor. | $28,000 |
| B01217318-I1-PL | 2025-10-01 | Plumbing | 9013 4 AVENUE | PLUMBING WORK AS PER PLANS FILED HEREWITH | $17,250 |
| M01243591-S1-PL | 2025-09-11 | Plumbing | 1192 PARK AVENUE | REPLACEMENT, RELOCATION AND CAPPING OF PLUMBING FIXTURES. CAP AND REMOVE GAS SERVICE TO THE APT INCLUDING GAS METER. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $18,000 |
| M01252142-S1-PL | 2025-09-09 | Plumbing | 304 EAST 11 STREET | 1C: Installation of plumbing fixtures as per plans filed herewith, No change to use, egress or occupancy | $21,000 |
| M01236379-I1-PL | 2025-07-21 | Plumbing | 970 PARK AVENUE | Plumbing work as per plans attached herewith. No change in use, egress and occupancy. | $45,000 |
| M01215609-S1-PL | 2025-07-02 | Plumbing | 131 EAST 15 STREET | PLUMBING WORK FOR THE RENOVATIONS OF APT 2N. | $25,500 |
| M01208275-I1-PL | 2025-06-24 | Plumbing | 630 PARK AVENUE | Minor alteration per plans filed within. No change to use, egress, or zoning. | $18,250 |
| Q01145268-I1-PL | 2025-06-16 | Plumbing | 35-01 191 STREET | REGISTER FOUR (4) GAS CLOTHES DRYERS FOR UNITS: 1, 6B, 8 & 9B | $14,000 |
| M01151270-S1-PL | 2025-06-10 | Plumbing | 320 RIVERSIDE DRIVE | Propose Plumbing work of renovation of kitchen, replacement of applicances & sink, installation of new washer & electric ventless dryer, renovation of primary & guest bathroom and | $20,000 |
| M01117911-S1-PL | 2025-05-16 | Plumbing | 300 CENTRAL PARK WEST | Cap and remove 1 tub, relocate 1 shower, 1 lav, replace 3 wc, 2 lav, 1 shower and 1 tub | $18,000 |
| M01091233-S1-PL | 2025-05-13 | Plumbing | 20 EAST 74 STREET | PLUMBING SCOPE IN CONJUNCTION WITH JOB#: M01091233-I1. REPLACEMENT OF PLUMBING FIXTURES IN THE MAIN BATHROOM AND KITCHEN ALONG WITH THE ADDITION OF A POWDER ROOM. NO CHANGE IN USE, | $15,500 |
| M01137053-S1-PL | 2025-05-02 | Plumbing | 155 EAST 72 STREET | Plumbing Modifications as per plans | $10,000 |
| Q01161065-I1-PL | 2025-04-21 | Plumbing | 205-11 NORTHERN BOULEVARD | INSTALLATION OF NEW PLUMBING FIXTURES AND PIPING FOR COMMERCIAL BUILDING EXPANSION. Filed in conjunction with Q00789074-I1. | $54,000 |
| B00686836-S5-EW-SP | 2025-03-21 | Fire protection | 1800 SHORE PARKWAY | Installation of new sprinkler heads as shown on plans. | $3,500 |
| B01126110-S1-PL | 2025-03-13 | Plumbing | 30 ST JOHNS PLACE | PL WORK FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $15,000 |
| M01182185-I1-PL | 2025-02-28 | Plumbing | 844 2 AVENUE | This appl is filed in conj w/ M01058352-I1 where gas authorization was given by DOB. Con Ed rejected the installation of the gas meter due to the fact that Gas Auth was already giv | $20,000 |
| M00954236-I1-EW-SP | 2025-01-27 | Fire protection | 30 ROCKEFELLER PLAZA | Sprinkler work on cellar as per plans. No change to use, egress or occupancy. | $15,000 |
| B01110479-S1-PL | 2025-01-22 | Plumbing | 359A 14 STREET | Proposed to install new plumbing system for 3-story and cellar building in conjunction. | $25,000 |
| M01144168-S1-PL | 2025-01-14 | Plumbing | 1021 PARK AVENUE | SUBSEQUENT APPLICATION FILED FOR PLUMBING WORK AS PER PLANS | $34,500 |
| Q00872004-S2-PL | 2025-01-14 | Plumbing | 38-15 QUEENS BOULEVARD | PLUMBING WORK AS PER PLANS. | $0 |
| Q00976990-I1-PL | 2025-01-13 | Plumbing | 36-11 NORTHERN BOULEVARD | Plumbing work as per plans. Filed in conjunction with Q00959648 | $100,000 |
| M01124753-S1-PL | 2024-12-19 | Plumbing | 325 EAST 72 STREET | Master Bathroom and Powder Room Renovation in 4B. No change in use, egress or occupancy. | $25,000 |
| M01126810-S1-PL | 2024-12-19 | Plumbing | 116 PINEHURST AVENUE | INTERIOR RENOVATION AND COMBINATION OF EXISTING APARTMENTS S1 AND S2 AS PER TPPN #03/97 (REMOVAL OF PLUMBING FIXTURE). NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $3,000 |
| B00686836-S4-PL | 2024-12-16 | Plumbing | 1800 SHORE PARKWAY | New gas piping installation & associated valves for HVAC unit. | $2,500 |
| M01119336-I1-PL | 2024-11-08 | Plumbing | 251 WEST 98 STREET | MODIFICATION OF PLUMBING RELATED TO RENOVATION OF APT 6B AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCCUPANCY. | $25,000 |
| M01118900-S1-PL | 2024-11-08 | Plumbing | 35 EAST 85 STREET | PLUMBING FIXTURE REPLACEMENT AND NEW AT APT 7C (7TH FLOOR). NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $42,000 |
| Q01067054-I1-PL | 2024-11-04 | Plumbing | 23-15 44 DRIVE | Minor interior renovation of existing apartment #PH208 on 65th floor. No change in use, egress, or occupancy. | $13,000 |
| M01090747-S1-PL | 2024-10-15 | Plumbing | 150 EAST 69 STREET | Plumbing work filed in conjunction with the general construction. No change in use, egress, or occupancy under this application | $28,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
