COMPANY RECORD · NEW YORK, NY
Stepping Stone Construct — permit history in New York, NY
Stepping Stone Construct appears on 59 New York permit records from 2019 through 2026, most often general construction (51.7% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 31 | 51.7% |
| Mechanical / HVAC | 29 | 48.3% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 4 |
| 2020 | 4 |
| 2021 | 7 |
| 2022 | 7 |
| 2023 | 7 |
| 2024 | 11 |
| 2025 | 11 |
| 2026 | 9 |
Busiest year on record: 2024, with 11 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Connelly & Sons Plumbing | 10 | 2026-06-29 |
| Mora Fire Protection LLC | 6 | 2025-12-12 |
| Leguci Piping&Heating LLC | 2 | 2026-05-07 |
| New York Park Plbg&Htg Co | 2 | 2026-06-17 |
| Zone Mechanical LLC | 2 | 2024-11-01 |
5 companies are named alongside Stepping Stone Construct on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1330 AVENUE OF THE AMERICAS | 2026-08-03 |
| 49 WEST 57 STREET | 2026-06-24 |
| 500 5 AVENUE | 2026-05-29 |
| 780 THIRD AVENUE | 2026-02-06 |
| 100 EAST END AVENUE | 2025-12-04 |
| 34 EAST 51 STREET | 2025-09-22 |
| 1 STATE STREET PLAZA | 2025-08-15 |
| 665 BROADWAY | 2025-06-09 |
| 185 COURT STREET | 2025-05-13 |
| 1 STATE STREET | 2025-05-12 |
| 193 MADISON AVENUE | 2024-11-25 |
| 301 EAST 29 STREET | 2024-07-17 |
| 129 FULTON STREET | 2024-01-23 |
| 535 5 AVENUE | 2023-10-16 |
26 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $1,100,000, median $144,800. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
59 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01398244-I1-MS | 2026-08-03 | Mechanical / HVAC | 1330 AVENUE OF THE AMERICAS | Mechanical modifications taking place on the 1st floor as per plans filed herewith. No change in use, egress or occupancy | $73,504 |
| M01386352-S1-MS | 2026-06-24 | Mechanical / HVAC | 49 WEST 57 STREET | Filing subsequent application for installation of mechanical units on the roof level and the interior of the 4th floor (office space). | $110,000 |
| M01386352-I1-GC | 2026-06-11 | General construction | 49 WEST 57 STREET | Application filed for interior build-out of office space on the 4th floor. Work includes installation of interior non-load bearing partitions. Plumbing filed subsequently in DOB NO | $352,800 |
| M01373424-S1-MS | 2026-05-29 | Mechanical / HVAC | 500 5 AVENUE | Mechanical scope associated with the renovation of the one-tenant office space on 50M/49C floor. No change of use, egress, or occupancy. | $120,000 |
| M01373424-I1-GC | 2026-05-29 | General construction | 500 5 AVENUE | Architectural scope associated with the renovation of the one-tenant office space on 50M/49C floor. No change of use, egress, or occupancy. | $490,000 |
| M01321731-S1-MS | 2026-05-19 | Mechanical / HVAC | 1330 AVENUE OF THE AMERICAS | Mechanical modifications taking place on the 16th fl construction/17th fl marketing floor as per plans filed herewith. No change in use, egress or occupancy | $278,400 |
| M01351247-I1-GC | 2026-04-08 | General construction | 500 5 AVENUE | INTERIOR REMOVALS WORK ON THE 55M/54C - 56M/55C FLOORS TO INCLUDE PARTITION, CEILING, AND DOOR REMOVALS AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. | $88,837 |
| M01321731-I1-GC | 2026-03-09 | General construction | 1330 AVENUE OF THE AMERICAS | General construction modifications taking place on the 16th fl construction/ 17th fl marketing floor as per plans filed herewith. No change in use, egress or occupancy | $718,023 |
| M01327802-I1-GC | 2026-02-06 | General construction | 780 THIRD AVENUE | Filing herewith interior demolition and renovation on the 20th FL. as per plans filed herewith. No change to use, egress or occupancy. | $167,886 |
| M01304979-I1-GC | 2025-12-11 | General construction | 500 5 AVENUE | Architectural scope associated with the renovation of the office space on 21M/20C floor. No change of use, egress, or occupancy. | $715,000 |
| M01304979-S1-MS | 2025-12-11 | Mechanical / HVAC | 500 5 AVENUE | Mechanical scope associated with the renovation of the one tenant office space on 21M/20C floor. No change of use, egress, or occupancy. | $425,000 |
| M01314850-I1-GC | 2025-12-04 | General construction | 100 EAST END AVENUE | Facade Repairs, no change to egress, occupy or use. | $220,000 |
| M01263260-I1-MS | 2025-09-22 | Mechanical / HVAC | 34 EAST 51 STREET | Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy. | $80,000 |
| M01263051-I1-GC | 2025-09-17 | General construction | 34 EAST 51 STREET | Minor modifications to the existing as-built | $400,000 |
| M01238730-I1-GC | 2025-08-15 | General construction | 1 STATE STREET PLAZA | Interior construction including new carpet, partitions, drywall ceiling, lighting, blocking, millwork, bookshelves, and finish upgrades in conference rooms, offices, wellness, and | $195,804 |
| M01202421-I1-GC | 2025-06-09 | General construction | 665 BROADWAY | HEREWITH FILING RENOVATIONS IN THE MAIN LOBBY PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. | $343,000 |
| M01202421-S1-MS | 2025-06-09 | Mechanical / HVAC | 665 BROADWAY | HEREWITH FILING MECHANICAL MODIFICATIONS IN CONJUNCTION WITH LOBBY RENOVATIONS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. | $20,980 |
| B01155642-I1-GC | 2025-05-13 | General construction | 185 COURT STREET | INTERIOR RENOVATION OF PARTITIONS, CEILINGS, DOORS AND FINISHES AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $900,000 |
| M01214676-I1-GC | 2025-05-12 | General construction | 1 STATE STREET | SCOPE OF WORK INCLUDES DEMOLITION OF EXISTING PARTITIONS, PATCH FLOORING FINISH AND REPLACE CEILING GRID AS INDICATED ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $52,900 |
| B01154166-I1-MS | 2025-05-12 | Mechanical / HVAC | 185 COURT STREET | INSTALLATION OF NEW A/C UNITS AND MODIDFICATION TO EXISTING MECHANICAL SYSTEM AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $345,000 |
| M01102057-I1-GC | 2024-12-16 | General construction | 500 5 AVENUE | Architectural scope associated with the interior renovation of the 1 tenant office space on the 16C/17M floor. No change of use, egress, or occupancy. | $500,000 |
| M01102057-S1-MS | 2024-12-16 | Mechanical / HVAC | 500 5 AVENUE | Mechanical scope associated with the interior renovation of the 1 tenant office space on the 16C/17M floor. No change of use, egress, or occupancy. | $300,000 |
| M01067300-I1-GC | 2024-11-25 | General construction | 193 MADISON AVENUE | Renovation of existing retail store as per plans filed. No change in use occupancy or egress. | $90,000 |
| M01051492-I1-MS | 2024-07-17 | Mechanical / HVAC | 301 EAST 29 STREET | Installation of Mechanical system and related duct work. | $25,000 |
| M01051484-I1-GC | 2024-06-26 | General construction | 301 EAST 29 STREET | Installation of interior partitions, ceilings, and doors. | $200,000 |
| M01019268-S1-MS | 2024-05-21 | Mechanical / HVAC | 500 5 AVENUE | Mechanical scope associated with the renovation of the existing office space on the 39C/40M floor. No change of use, egress, or occupancy. | $110,000 |
| M01019268-I1-GC | 2024-05-20 | General construction | 500 5 AVENUE | Architectural scope associated with the interior renovation of the office space on the 39C/40M floor. No change of use, egress, or occupancy. | $440,000 |
| M00573720-I1-MS | 2024-04-12 | Mechanical / HVAC | 1 STATE STREET | Mechanical filing for sub cellar 1 space related to GC filing M00573710-I1 | $205,995 |
| M00761887-I1-GC | 2024-03-07 | General construction | 500 5 AVENUE | Interior build-out of the existing office space, including installation of new interior partitions, doors, ceiling, and finishes. No change of use, egress, or occupancy. | $1,100,000 |
| M00761887-S3-MS | 2024-02-28 | Mechanical / HVAC | 500 5 AVENUE | Interior renovation of 17C/18M office space associated with the Mechanical Scope. No change in use, egress, or occupancy under this application. | $225,000 |
| M00980871-I1-GC | 2024-01-23 | General construction | 129 FULTON STREET | Interior renovation of existing PH office as per plan. Partitions and finishes as per plan. No change to use, egress or occupancy under this application. | $139,600 |
| M00908131-S1-MS | 2023-11-17 | Mechanical / HVAC | 500 5 AVENUE | Mechanical scope associated with the interior renovation of the office space on 49M/48C floor. No change of use, egress, or occupancy. | $300,000 |
| M00908131-I1-GC | 2023-11-16 | General construction | 500 5 AVENUE | Architectural scope associated with the interior renovation of the office space on 49M/48C floor. No change of use, egress, or occupancy. | $285,000 |
| M00912705-I1-MS | 2023-10-16 | Mechanical / HVAC | 535 5 AVENUE | APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 13TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $88,000 |
| M00904679-I1-GC | 2023-10-10 | General construction | 535 5 AVENUE | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 13TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPAN | $236,250 |
| M00910795-I1-GC | 2023-08-24 | General construction | 44 EAST 2 STREET | SCOPE OF WORK TO RECONSTRUCT THE EXISTING HANDICAPPED RAMP ON THE EXTERIOR OF THE BUILDING. NO CHANGE IN USE, OCCUPANCY OF EGRESS. | $9,000 |
| M00845791-I1-GC | 2023-06-27 | General construction | 1 STATE STREET | INTERIOR RENOVATION OF AN EXISTING OFFICE SPACE AT THE 10TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $385,000 |
| M00845794-I1-MS | 2023-06-23 | Mechanical / HVAC | 1 STATE STREET | PROPOSED MECHANICAL WORK FILED IN CONJUCTION WITH INTERIOR RENOVATION OF AN EXISTING OFFICE SPACE AT THE 10TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $7,500 |
| M08039247-I1-MS | 2022-12-30 | Mechanical / HVAC | 200 WEST 41 STREET | Propose to perform mechanical work. No change in use, egress or occupancy. | $130,000 |
| M08033499-I1-GC | 2022-12-30 | General construction | 200 WEST 41 STREET | Propose to perform interior renovations. No change in use, egress or occupancy. | $225,000 |
| M08047249-I1-GC | 2022-12-09 | General construction | 1261 BROADWAY | APPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 8TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $29,760 |
| M08004032-I1-GC-CX | 2022-11-10 | General construction | 154 WEST 14 STREET | Loading dock repairs to include framing and replacement of concrete slab as per plans filed herewith . No change to use, egress or occupancy. | $250,000 |
| M00590916-I1-GC | 2022-08-18 | General construction | 1261 BROADWAY | APPLICATION FILED FOR INTERIOR REMOVAL/RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES IN THE CELLAR AND ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE I | $80,000 |
| M00578960-I1-GC | 2022-07-29 | General construction | 1261 BROADWAY | Floor Slab Restoration and Repairs at Ground Level and Cellar as per plans filed herewith. No change in use, egress or occupancy. | $150,000 |
| M00733129-I1-GC | 2022-06-01 | General construction | 1 STATE STREET | GC TO ERECT TEMPORARY SIDEWALK SHED FOR WORK AREA ACCESS, PROTECTION, AND PROTECTION OF PUBLIC TO INCLUDE ROOF AND SECURED DOORS. SEE CONSTRUCTION FENCE NOTE AND DRAWINGS BELOW. | $100,000 |
| M00573710-I1-GC | 2021-12-13 | General construction | 1 STATE STREET | Interior renovation at sub cellar 1. No change in use, egress or occupancy. | $798,000 |
| M00272684-I1-MS | 2021-09-15 | Mechanical / HVAC | 648 BROADWAY | POST APPROVAL AMENDMENT TO AMEND THE PLANS TO SHOW THE MECHANICAL WORK RELATED TO THE NEW BOILER FLUE. | $50,000 |
| M00272706-I1-MS | 2021-09-15 | Mechanical / HVAC | 648 BROADWAY | MECHANICAL WORK FOR THE PASSENGER ELEVATOR UPGRADE AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH DOB APPLICATION 123788384. | $50,000 |
| Q00556096-I1-GC-CX | 2021-09-13 | General construction | 111-04 ROCKAWAY BEACH BOULEVARD | HEREBY FILING FILING FOR THE RENOVATION OF COMMERCIAL SPACE, CHANGE USE FROM FLORAL SHOP TO EATING AND DRINKING ESTABLISHMENT. | $100,000 |
| Q00556096-I1-GC-CX | 2021-09-13 | Mechanical / HVAC | 111-04 ROCKAWAY BEACH BOULEVARD | HEREBY FILING FILING FOR THE RENOVATION OF COMMERCIAL SPACE, CHANGE USE FROM FLORAL SHOP TO EATING AND DRINKING ESTABLISHMENT. | $100,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
