COMPANY RECORD · NEW YORK, NY
R.W. Dake & Co.,Inc — permit history in New York, NY
R.W. Dake & Co.,Inc appears on 62 New York permit records from 2020 through 2026, most often general construction (50% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 33 | 50% |
| Mechanical / HVAC | 33 | 50% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2020 | 1 |
| 2021 | 5 |
| 2022 | 11 |
| 2023 | 13 |
| 2024 | 10 |
| 2025 | 5 |
| 2026 | 21 |
Busiest year on record: 2026, with 21 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| M&T Plbg And Htg Co., Inc | 6 | 2026-06-22 |
| Boyd Mechanical LLC | 1 | 2024-11-13 |
| Par Fire Protection LLC | 1 | 2023-03-10 |
| Par Plumbing Co., Inc | 1 | 2026-03-12 |
| Sirina Fire Prot Corp | 1 | 2024-11-07 |
5 companies are named alongside R.W. Dake & Co.,Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 91-19 QUEENS BOULEVARD | 2026-06-12 |
| 37-02 JUNCTION BOULEVARD | 2026-06-09 |
| 10 VANDERBILT AVENUE | 2026-06-03 |
| 462 FIRST AVENUE | 2026-04-29 |
| 1972 BROADWAY | 2026-04-24 |
| 31-04 DITMARS BOULEVARD | 2026-04-16 |
| 460 BROADWAY | 2026-04-02 |
| 136-17 39 AVENUE | 2026-03-26 |
| 171 WEST 57 STREET | 2026-03-26 |
| 164-06 UNION TURNPIKE | 2026-03-12 |
| 127-11 FARMERS BOULEVARD | 2026-03-11 |
| 29-29 DITMARS BOULEVARD | 2026-02-11 |
| 76-02 MAIN STREET | 2025-10-14 |
| 61-35 JUNCTION BOULEVARD | 2025-01-10 |
40 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $6,000 to $1,100,000, median $222,326. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
62 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| Q01369365-I1-GC | 2026-06-12 | General construction | 91-19 QUEENS BOULEVARD | PROJECT IS AN INTERIOR FIT-OUT OF EXISTING INTERIOR TENANT SPACE. | $450,000 |
| Q01369365-S1-MS | 2026-06-11 | Mechanical / HVAC | 91-19 QUEENS BOULEVARD | FILING HEREWITH OF MECHANICAL DUCTED SYSTEM DISTRIBUTION SYSTEM INCLUDING NEW WATER SOURCE HEAT PUMPS, HEATING SYSTEMS, AIR DEVICES, EXHAUAST FAN AND TRANSFER FAN AND NEW SPACE CO | $105,600 |
| Q01373026-S3-MS | 2026-06-09 | Mechanical / HVAC | 37-02 JUNCTION BOULEVARD | Mechanical work in conjunction with INTERIOR FIT-OUT OF AN EXISTING SINGLE-STORY+/-10,350 SF BUILDING CREATING (2) SEPARATE TENANT SPACES INCLUDING AN INTERIOR RETAIL BANK | $31,500 |
| Q01373026-I1-GC | 2026-06-05 | General construction | 37-02 JUNCTION BOULEVARD | INTERIOR FIT-OUT OF AN EXISTING SINGLE-STORY+/-10,350 SF BUILDING CREATING (2) SEPARATE TENANT SPACES INCLUDING AN INTERIOR RETAIL BANK | $720,400 |
| M01382140-I1-GC | 2026-06-03 | General construction | 10 VANDERBILT AVENUE | Tenant alterations to the commercial exterior on construction Floor 13 (marketing Floor 20), as per the plans filed herewith. No changes to the existing base building envelope, HVA | $315,000 |
| M01348746-S1-MS | 2026-04-29 | Mechanical / HVAC | 462 FIRST AVENUE | BELLEVUE - CAFE - MECHANICAL MODIFICATIONS ACCORIND TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $740,000 |
| M01348746-I1-GC | 2026-04-28 | General construction | 462 FIRST AVENUE | BELLEVUE - CAFE - INTERIOR RENOVATION ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,100,000 |
| M01369755-I1-MS | 2026-04-24 | Mechanical / HVAC | 1972 BROADWAY | Mechanical changes on the 1st floor as indicated on drawings. | $191,910 |
| M01369748-I1-GC | 2026-04-24 | General construction | 1972 BROADWAY | Architectural changes on the 1st floor as indicated on drawings. | $1,047,640 |
| Q01367540-I1-MS | 2026-04-16 | Mechanical / HVAC | 31-04 DITMARS BOULEVARD | Proposed mechanical work as per plans filed herewith. No change to use, egress, or occupancy. | $150,000 |
| M01364549-I1-GC | 2026-04-02 | General construction | 460 BROADWAY | Interior renovation of tenant space for new toilet room | $11,000 |
| M01364549-S2-MS | 2026-04-01 | Mechanical / HVAC | 460 BROADWAY | Mechanical duct work in conjunction with new bathroom addition | $8,250 |
| Q01374933-I1-MS | 2026-03-26 | Mechanical / HVAC | 136-17 39 AVENUE | Installation of Water Source Heat Pumps, Associated Controls, Ductwork, Piping & BMS System for Tenant Fit-Out. All work as per plan. No Change in occupancy or egress. | $124,500 |
| M00673094-I1-MS | 2026-03-26 | Mechanical / HVAC | 171 WEST 57 STREET | CHASE - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $845,766 |
| Q01249166-I1-MS | 2026-03-12 | Mechanical / HVAC | 164-06 UNION TURNPIKE | Filing herewith plans for the proposed Mechanical work associated with minor interior bank renovations. No change to use, egress, or occupancy. | $300,000 |
| Q01285431-I1-GC | 2026-03-11 | General construction | 127-11 FARMERS BOULEVARD | APPLICATION FILED INTERIOR/EXTERIOR RENOVATION ON PARTIAL 1ST FLOOR AND ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $70,000 |
| Q01248898-I1-GC | 2026-03-11 | General construction | 164-06 UNION TURNPIKE | Filing plans herewith for the Interior and Exterior modifications of an existing Bank. No change to use, egress, or occupancy. | $320,000 |
| Q01285431-S1-MS | 2026-03-11 | Mechanical / HVAC | 127-11 FARMERS BOULEVARD | SUBSEQUENT APPLICATION FILED FOR MECHANICAL ON THE 1ST FLOOR AND ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $115,000 |
| Q01253967-I1-GC | 2026-02-19 | General construction | 136-17 39 AVENUE | PROPOSING RENOVATION OF AN EXISTING BUILDING FOR CITIZENS. WORK TO INCLUDE REMOVAL OF INTERIOR PARTITION & SUSPENDED CEILING . INSTALLATION OF INTERIOR PARTITIONS, FINISHES & CASEW | $624,600 |
| Q01337933-I1-GC | 2026-02-11 | General construction | 29-29 DITMARS BOULEVARD | Interior and exterior renovations to existing single-story building for consumer banking use (no vault). Includes interior demolitions, storefront and cladding removal, new finishe | $751,600 |
| Q01337933-S1-MS | 2026-02-11 | Mechanical / HVAC | 29-29 DITMARS BOULEVARD | Installation of new mechanical equipment, supply and return duct and fan coil units. Removal of existing mechanical ductwork and thermostatic controls within space | $210,000 |
| Q01258341-I1-GC | 2025-10-14 | General construction | 76-02 MAIN STREET | Filing plans herewith for sitework including new pavement, grading, new ATM and striping as indicated on plans. No change to use, egress or occupancy, | $150,000 |
| Q01234139-I1-MS | 2025-08-25 | Mechanical / HVAC | 31-04 DITMARS BOULEVARD | Filing plans herewith for Mechanical modifications associated with an existing TD bank space to be demised with a new interior fit out. No change to use, egress, or occupancy. | $278,905 |
| Q01234030-I1-GC | 2025-08-25 | General construction | 31-04 DITMARS BOULEVARD | Filing plans herewith for the renovation of an existing TD bank space to be demised with a new interior fit out. No change to use, egress, or occupancy. | $419,888 |
| Q01126583-I1-MS | 2025-01-10 | Mechanical / HVAC | 61-35 JUNCTION BOULEVARD | INTERIOR RENOVATION OF EXISTING TENANT SPACE TO BE USED FOR STARBUCKS COFFEE SHOP. PROVIDE NEW AIR OUTLETS AND TIE INTO DUCTWORK ON EXISTING AIR-COOLED COMPONENTS UNIT, AND INSTAL | $54,835 |
| Q01126401-I1-GC | 2025-01-03 | General construction | 61-35 JUNCTION BOULEVARD | Storefront & Interior renovation of an existing tenant space to be used for Starbucks coffee as per plan. No change in use, occupancy, or egress is involved under this application. | $170,160 |
| S01091681-I1-GC-CX | 2024-11-15 | General construction | 200 GULF AVENUE | Application filed for structural modification/additional which includes trenching and installing footings and concrete pads for electrical charging stations at exterior parking lot | $350,000 |
| M01015741-S3-MS | 2024-11-08 | Mechanical / HVAC | 1411 BROADWAY | SCOPE OF WORK INCLUDES THE DEMOLITION OF MULTIPLE SUPPLY/RETURN DIFFUSERS. ALL EXISTINGUNITS AND DUCTWORK TO REMAIN. NEW SUPPLY DUCTWORK DISTRIBUTION TO BE INSTALLED WHERENEW SUPPL | $44,000 |
| M01015741-S1-GC | 2024-11-08 | General construction | 1411 BROADWAY | MAJOR RENOVATION OF AN EXISTING 3,244 SF STARBUCKS. SCOPE INCLUDES PARTIAL DEMOLITION OF EXISTING INTERIOR PARTITIONS,EQUIPMENT AND EXISTING FINISHES. | $617,000 |
| B01059391-I1-GC | 2024-07-31 | General construction | 1301 65 STREET | Hereby filing plans for the renovation to the existing TD bank space. No change to use, egress, or occupancy. | $320,000 |
| Q01046813-I1-MS | 2024-07-15 | Mechanical / HVAC | 196-41 NORTHERN BOULEVARD | Modification to associated ducts and piping to the existing Mechanical system. No change to use, egress, or occupancy. | $20,000 |
| Q01046774-I1-GC | 2024-07-15 | General construction | 196-41 NORTHERN BOULEVARD | Hereby filing plans for the renovation to the existing TD bank space. No change to use, egress, or occupancy. | $320,000 |
| M01026078-I1-GC | 2024-05-13 | General construction | 2 PENN PLAZA | MAJOR INTERIOR RENOVATION OF AN EXISTING STARBUCKS KIOSK. SCOPE INCLUDES INTERIOR DEMOLITION OF EXTISTING INTERIOR PARTITIONS, EQUIPMENT AND EXISTING FINISHES. SCOPE ALSO INCLUDES | $219,652 |
| X00949257-I1-GC-CX | 2024-04-05 | Mechanical / HVAC | 880 WHITE PLAINS ROAD | APPLICATION IS FILED FOR AN ALT OF AN EXISTING RETAIL SPACE, INCLUDING NEW NON-LOAD BEARING PARTITIONS,FINISHES, LIGHTING,SIGNAGE DRIVE-THRU COMPONENTS,NEW HVAC & DUCTWORK THROUGH | $283,750 |
| X00949257-I1-GC-CX | 2024-04-05 | General construction | 880 WHITE PLAINS ROAD | APPLICATION IS FILED FOR AN ALT OF AN EXISTING RETAIL SPACE, INCLUDING NEW NON-LOAD BEARING PARTITIONS,FINISHES, LIGHTING,SIGNAGE DRIVE-THRU COMPONENTS,NEW HVAC & DUCTWORK THROUGH | $283,750 |
| M00772508-I1-MS | 2024-01-16 | Mechanical / HVAC | 770 LEXINGTON AVENUE | HVAC REPLACEMENT AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $132,068 |
| M00958993-I1-GC | 2023-12-11 | General construction | 1120 AVENUE OF THE AMERICAS | INTERIOR RENOVATION FOR TD BANK. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $225,000 |
| M00958993-S1-MS | 2023-12-07 | Mechanical / HVAC | 1120 AVENUE OF THE AMERICAS | INSTALLING A DIFFUSER FOR TD BANK. | $25,000 |
| B00935189-I1-GC | 2023-10-31 | General construction | 9601 FOSTER AVENUE | ROOF REPLACEMENT AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $536,390 |
| M00936642-I1-GC-CX | 2023-10-13 | Mechanical / HVAC | 127 7 AVENUE | Application filed for interior renovation of non-load bearing partitions, ceilings, finishes and Mechanical modifications/additions on the 1st floor (M&T Bank) as per plans filed | $68,000 |
| M00936642-I1-GC-CX | 2023-10-13 | General construction | 127 7 AVENUE | Application filed for interior renovation of non-load bearing partitions, ceilings, finishes and Mechanical modifications/additions on the 1st floor (M&T Bank) as per plans filed | $68,000 |
| M00917108-I1-GC | 2023-10-13 | General construction | 11 EAST HOUSTON STREET | Renovation of an existing Bank. Work to include removal /installation of minor interior partitions, finishes, millwork & Casework | $298,120 |
| M00885168-I1-MS | 2023-10-10 | Mechanical / HVAC | 1 PENN PLAZA | INSTALLATION OF A SINGLE CHILLED WATER HVAC UNIT TO BE SUPPORTEDBY STRUCTURAL FRAMING TO EXISTING STEEL BEAMS ABOVE TO INDEPENDENTLY SUPPORT UNIT FROM WITHIN THE BUILDING STRUCTURE | $180,000 |
| M00878604-I1-GC | 2023-10-10 | General construction | 1 PENN PLAZA | NEW INTERIOR ALTERATION (TOTAL 3,499 SQ. FT) LOCATED IN NEWLY RENOVATED PENN STATION TO CONVERT INTO NEW STARBUCKS. | $350,000 |
| M00864445-I1-GC-CX | 2023-06-14 | Mechanical / HVAC | 127 7 AVENUE | application filed for interior renovation of non-load bearing partitions, ceilings, finishes and Mechanical modifications/additions on the 1st floor (M&T Bank) as per plans filed | $68,000 |
| M00864445-I1-GC-CX | 2023-06-14 | General construction | 127 7 AVENUE | application filed for interior renovation of non-load bearing partitions, ceilings, finishes and Mechanical modifications/additions on the 1st floor (M&T Bank) as per plans filed | $68,000 |
| M00822053-I1-GC | 2023-03-21 | General construction | 250 PARK AVENUE | a.Renovation of 3 existing offices, one conference room, and one pantry into two new storage rooms. Storage rooms are 2 hour rated. All work is located on the 9th floor of 250 Park | $130,000 |
| M00822053-S1-MS | 2023-03-20 | Mechanical / HVAC | 250 PARK AVENUE | interior renovation, mechanical plans filed here with. a.Renovation of 3 existing offices, one conference room, and one pantry into two new storage rooms. Storage rooms are 2 hour | $50,000 |
| M08046494-I1-GC | 2023-01-13 | General construction | 1515 YORK AVENUE | Filing herewith demolition and renovation to an existing Starbucks as per plans filed herewith. No change to use, egress or occupancy. | $279,997 |
| M00765116-I1-MS | 2022-12-21 | Mechanical / HVAC | 471 WEST 42 STREET | Chase Bank Mechnical tenant improvement project as per plans provided. No change to use, egress, or occupancy under this application. | $52,647 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
