COMPANY RECORD · NEW YORK, NY
Vanguard Construction And — permit history in New York, NY
Vanguard Construction And appears on 329 New York permit records from 2019 through 2026, most often general construction (53.2% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 175 | 53.2% |
| Mechanical / HVAC | 154 | 46.8% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 2 |
| 2020 | 15 |
| 2021 | 56 |
| 2022 | 51 |
| 2023 | 75 |
| 2024 | 47 |
| 2025 | 57 |
| 2026 | 26 |
Busiest year on record: 2023, with 75 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| William C. Gerakaris P&H | 16 | 2026-07-29 |
| Mac Felder Inc | 5 | 2025-08-01 |
| Bedrock Plbg. & Htg., Inc | 5 | 2025-05-28 |
| A Plus Plumbing Corp | 4 | 2026-02-24 |
| Full Capacity Fire Corp | 4 | 2025-12-31 |
| Par Plumbing Co., Inc | 4 | 2025-08-21 |
| Zone Mechanical LLC | 4 | 2025-01-29 |
| Ashlar Mechanical Corp | 4 | 2025-08-21 |
| Skh Mechanical Corp | 3 | 2025-01-15 |
| Sirina Fire Prot Corp | 3 | 2025-01-28 |
| Plumbing Works Corp | 2 | 2026-03-09 |
| A&A Plumbing Corp | 2 | 2025-10-09 |
25 companies are named alongside Vanguard Construction And on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 11 EAST 26 STREET | 2026-08-13 |
| 242 EAST 86 STREET | 2026-07-29 |
| 92 GREENE STREET | 2026-07-16 |
| 1995 BROADWAY | 2026-06-29 |
| 1290 6 AVENUE | 2026-06-23 |
| 595 MADISON AVENUE | 2026-06-15 |
| 150 EAST 58 STREET | 2026-06-15 |
| 75 ROCKEFELLER PLAZA | 2026-05-18 |
| 199 WATER STREET | 2026-04-06 |
| 580 5 AVENUE | 2026-03-30 |
| 147 41 STREET | 2026-03-03 |
| 650 FIFTH AVENUE | 2026-01-23 |
| 2495 AMSTERDAM AVENUE | 2025-10-30 |
| 378 SCHERMERHORN STREET | 2025-10-14 |
128 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $19,525,000, median $197,181. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
329 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01430035-I1-GC | 2026-08-13 | General construction | 11 EAST 26 STREET | INTERIOR DEMOLITION INCLUDING PARTITIONS, CEILING, DOOR MODIFICATIONS CONVENINCE STAIRS AND RELATED CONSTRUCTION AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $20,000 |
| M01420694-S1-MS | 2026-07-29 | Mechanical / HVAC | 242 EAST 86 STREET | SUBSEQUENT FILING FOR MECHANICAL MODIFICATION WORK FOR EXISTING 1ST FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY. | $88,470 |
| M01420694-I1-GC | 2026-07-27 | General construction | 242 EAST 86 STREET | INTERIOR TENANT FITOUT OF EXISTING RETAIL SPACE TO A NEW BEAUTY SALON / PARLOR INCLUDING INTERIOR PARTITIONS, CEILING AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, | $288,326 |
| M01400532-I1-MS | 2026-07-16 | Mechanical / HVAC | 92 GREENE STREET | MECHANICAL WORK RELATED TO THE RENOVATION OF AN EXISTING SPACE. THERE IS NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | $75,000 |
| M01400526-I1-GC | 2026-07-16 | General construction | 92 GREENE STREET | ARCHITECTURAL WORK RELATED TO THE RENOVATION OF AN EXISTING SPACE. THERE IS NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | $20,000 |
| M01394284-I1-GC | 2026-06-29 | General construction | 1995 BROADWAY | Provide partitions ceiling and finishes for Interior renovation of existing office space on the 15 floor (marketed as 16) as per plans filed no change in use occupancy or egress | $502,500 |
| M01242747-I1-GC | 2026-06-23 | General construction | 1290 6 AVENUE | Herewith filing to create a new eating and drinking establishment on the 1st floor as per the plans. Interior work in the cellar related to the new eating and drinking establishme | $1,200,000 |
| M01375430-I1-MS | 2026-06-15 | Mechanical / HVAC | 595 MADISON AVENUE | Mechanical work on the 20th floor (HVAC project) as indicated on drawings. | $58,000 |
| M01396073-S1-MS | 2026-06-15 | Mechanical / HVAC | 150 EAST 58 STREET | HEREWITH FILING MODIFICATION TO EXISTING MECHANICAL SYSTEM IN CONJUNCTION WITH INTERIOR RENOVATIONS OF 11TH FLOOR RESTROOM AND CORRIDOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER | $33,300 |
| M01396073-I1-GC | 2026-06-15 | General construction | 150 EAST 58 STREET | CORRIDOR AND RESTROOM RENOVATION WORK TO INCLUDE DEMO OF EXISTING AND CONSTRUCTION OF NEW PARTITION, CEILING, FINISHES AND DOOR WORK AS INDICATED ON PLANS FILED HEREWITH .NO CHANGE | $134,000 |
| M01247347-I1-GC | 2026-05-18 | General construction | 75 ROCKEFELLER PLAZA | Change of Use filed herewith on 1st floor and 1st floor Mezzanine (MZ1) for eating and drinking establishment. | $48,187 |
| M01374908-I1-GC | 2026-05-02 | General construction | 595 MADISON AVENUE | Construction work on the 21st floor (Marina B) as indicated on drawings. | $158,491 |
| M01375205-I1-MS | 2026-04-30 | Mechanical / HVAC | 595 MADISON AVENUE | Mechanical work on the 21st floor (Marina B) as indicated on drawings. | $40,989 |
| M01371323-I1-GC | 2026-04-06 | General construction | 199 WATER STREET | General construction for lobby renovation | $989,975 |
| M01370731-S3-MS | 2026-03-30 | Mechanical / HVAC | 580 5 AVENUE | MH WORK FILED IN CONJUNCTION WITH DOB NOW GC, SP, AND PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $0 |
| M01370731-I1-GC | 2026-03-27 | General construction | 580 5 AVENUE | MINOR INTERIOR RENOVATION OF SUITE 1100B. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $158,000 |
| M01368488-I1-MS | 2026-03-12 | Mechanical / HVAC | 199 WATER STREET | Mechanical work for lobby renovation | $44,998 |
| M01247347-S1-GC | 2026-03-10 | General construction | 75 ROCKEFELLER PLAZA | General construction on floors SC1, Cel, 01, MZ1 as per plans filed herewith. no changes in use, egress or occupancy. | $1,408,050 |
| M01247347-S3-MS | 2026-03-09 | Mechanical / HVAC | 75 ROCKEFELLER PLAZA | Mechanical modifications on floors Cel, 01, MZ1, 02 as per plans filed herewith, including commercial kitchen rangehood ventilation system for Jack D's Steakhouse. | $446,091 |
| B01344690-I1-MS | 2026-03-03 | Mechanical / HVAC | 147 41 STREET | Installation of New Mechanical equipment on partial 4th floor - suite C412. No Change in use, egress or occupancy | $125,000 |
| M01307892-S1-MS | 2026-02-05 | Mechanical / HVAC | 1290 6 AVENUE | Herewith filing for related mechanical work as per the plans. | $1,900,000 |
| M01307892-I1-GC | 2026-02-05 | General construction | 1290 6 AVENUE | INTERIOR RENOVATION OF TENANT SPACE AT CELLAR AND 1st FLOOR. STOREFRONT MODIFICATION AT WEST 51ST ST.SCOPE DOES NOT ALTER EXISTING BUILDING HEIGHT, AREA, EXIT ACCESS/ EXIT STAIRS/ | $700,000 |
| M01333240-I1-GC | 2026-01-23 | General construction | 650 FIFTH AVENUE | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 29th floor (Sapient Capital) as per plans. No change to use, egress or occupancy | $1,311,782 |
| M01333259-I1-MS | 2026-01-15 | Mechanical / HVAC | 650 FIFTH AVENUE | Modifications to the existing HVAC system on the 29th floor (Sapient Capital) as per plans. No change to use, egress or occupancy | $161,884 |
| M01323174-I1-GC | 2026-01-12 | General construction | 650 FIFTH AVENUE | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 19th floor (Buildout) as per plans. No change to use, egress or occupancy. | $896,317 |
| M01323181-I1-MS | 2026-01-12 | Mechanical / HVAC | 650 FIFTH AVENUE | Modifications to the existing HVAC system on the 19th floor (Buildout) as per plans. No change to use, egress or occupancy | $269,975 |
| B01312757-I1-GC | 2025-12-01 | General construction | 147 41 STREET | INTERIOR RENOVATION, DEMO, CONSTRUCTION OF NEW PARTITIONS, CEILING & FLOOR ON PARTIAL 4th FLOOR, SUITE C412. NO CHANGE IN USE, EGRESS OR OCCUPANCY | $643,420 |
| M01274047-S1-MS | 2025-10-30 | Mechanical / HVAC | 2495 AMSTERDAM AVENUE | MODIFICATIONS OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTEREATIONS AT PARTIAL 1ST FLOOR AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY | $82,000 |
| B01235260-I1-GC-CX | 2025-10-14 | General construction | 378 SCHERMERHORN STREET | Installation of interior partitions, ceilings, flooring/finishes as per plans for 1st floor tenant including steel members / framework for equipment platform. No change in use, egr | $425,000 |
| B01235806-I1-MS | 2025-10-09 | Mechanical / HVAC | 378 SCHERMERHORN STREET | Modifications to existing mechanical system including installation of HVAC units, commercial kitchen, and ventilation system (hood/duct) for 1st floor tenant. No change in use, egr | $300,000 |
| M01075912-S2-MS | 2025-09-30 | Mechanical / HVAC | 2 WALL STREET | Modification/additions to existing HVAC system and related ductwork/piping. No change in use, egress or occupancy under this application. | $4,850,000 |
| M01268363-I1-GC | 2025-09-16 | General construction | 28 LIBERTY STREET | Interior renovation as per plans filed herewith. No change to use, egress or occupancy. | $1,235,000 |
| M01268371-I1-MS | 2025-09-15 | Mechanical / HVAC | 28 LIBERTY STREET | Mechanical modifications as per plans filed herewith. No change to use, egress or occupancy. | $127,400 |
| M01274047-I1-GC | 2025-09-04 | General construction | 2495 AMSTERDAM AVENUE | MODIFICAITON OF INTERIOR PARTIONS AND FINISHES TO ACCOMMODATE ALTERATIONS AT PARTIAL 1ST FLOOR AS INDICATED ON PLANS FILED HEREWITH | $830,000 |
| M01105207-S1-MS | 2025-09-02 | Mechanical / HVAC | 225 LIBERTY STREET | Mechanical work in cellar as shown on plans (in conjunction with Daily Provisions - Food Court Space 253). | $7,494 |
| Q01006858-I1-GC | 2025-08-19 | General construction | 82-70 164 STREET | HHC Queens Hospital Center Proposed interior renovation of an MRI on Cellar floor. no change in use, egress or occupancy. All as per plans filed herewith. | $185,000 |
| B01196746-I1-GC | 2025-08-15 | General construction | 445 GOLD STREET | Replacement of doors and glazing and flooring. Building is subject to 2008 Building Code. | $299,996 |
| Q01006858-S1-MS | 2025-08-14 | Mechanical / HVAC | 82-70 164 STREET | HHC Queens Hospital Center Proposed Mechanical-HVAC-Lighting work interior renovation of an MRI on cellar Floor. no change in use, egress or occupancy. All as per plans filed herew | $92,302 |
| M01256794-I1-MS | 2025-08-12 | Mechanical / HVAC | 743 MADISON AVENUE | Filing for installation of HVAC units at third floor and roof. | $36,700 |
| B01237949-S1-MS | 2025-08-06 | Mechanical / HVAC | 5101 13 AVENUE | Mechanical work in conjunction with Interior- Fit out bank (Wells Fargo) building scope include exterior building components, interior spaces, new finishes partitions, mechanical, | $21,000 |
| B01237949-I1-GC | 2025-08-06 | General construction | 5101 13 AVENUE | Interior Fit out bank (Wells Fargo) building scope include exterior building components, interior spaces, new finishes partitions, mechanical, electrical, and Plumbing equipment. | $561,000 |
| B01237949-S3-GC-CX | 2025-08-06 | General construction | 5101 13 AVENUE | Structural work In conjunction with Interior renovation for bank fit out (Wells Fargo) | $470,000 |
| M01257449-I1-MS | 2025-07-29 | Mechanical / HVAC | 250 HUDSON STREET | Mechanical work for restroom renovation on 9th floor. | $31,724 |
| M01257445-I1-GC | 2025-07-29 | General construction | 250 HUDSON STREET | General construction for restroom renovation on 9th floor. | $152,661 |
| Q01012569-S1-MS | 2025-07-29 | Mechanical / HVAC | 79-01 BROADWAY | Renovation of an existing labor and delivery suite - Mechanical filing | $1,857,000 |
| Q01012569-I1-GC | 2025-07-25 | General construction | 79-01 BROADWAY | Renovation of an existing labor and delivery suite. New partitions and finishes per layout. | $2,540,000 |
| M01223741-S2-MS | 2025-07-17 | Mechanical / HVAC | 90 WEST BROADWAY | Mechanical in conjunction with demolition of the interior of the existing tenant space and new bank fit out. there will be no change in use, egress, or occupancy. | $21,600 |
| B01146675-I1-GC | 2025-07-16 | General construction | 5101 13 AVENUE | Interior demo of the interior existing tenant space and prep for new Bank Fit-Out (Wells Fargo). There will be no change in use, egress, or occupancy | $68,600 |
| M01223741-I1-GC | 2025-07-15 | General construction | 90 WEST BROADWAY | Demolition of the interior of the existing tenant space and new bank fit out. there will be no change in use, egress, or occupancy. | $344,250 |
| M01227826-S1-MS | 2025-07-10 | Mechanical / HVAC | 432 PARK AVENUE | MECHANICAL SCOPE ASSOCIATED WITH AMENITY SPACE RENOVATION. | $140,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
