Gridspan Corporation — permit history in New York, NY

Gridspan Corporation appears on 32 New York permit records from 2022 through 2026, most often general construction (66.7% of the record).

Permit categories

CategoryPermitsShare
General construction3066.7%
Mechanical / HVAC1533.3%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
202212
202313
202412
20257
20261

Busiest year on record: 2023, with 13 permits. One project can account for several filings, so read this as filing activity rather than workload.

Named on the same permit

Name in sourceLinked permitsLast seen
M. Spinelli Plb & Htg Inc22024-11-06
Dh Eagle Plbg & Htg Inc12023-08-30
Village P & H Ny Inc12025-08-07

3 companies are named alongside Gridspan Corporation on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
161 VARICK AVENUE2026-05-28
708 MAPLE STREET2025-07-23
220 IRVING AVENUE2025-06-05
65 COURT STREET2025-03-10
2839 BEDFORD AVENUE2024-06-06
5800 20 AVENUE2024-06-06
8010 12 AVENUE2024-06-05
355 PARK PLACE2023-09-06
1390 WILLOUGHBY AVENUE2023-08-30
850 GRAND STREET2023-07-14
125 COVERT STREET2023-05-17
544 7 AVENUE2023-01-11
2035 NOSTRAND AVENUE2022-10-13
605 SHEPHERD AVENUE2022-09-21

15 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $10,000 to $1,499,500, median $293,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

32 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
B00591855-I1-GC2026-05-28General construction161 VARICK AVENUEInstall new ighting fixtures ad submit energy analysis. No change to use, egress or occupancy under this applciation$725,920
B01147123-I1-GC2025-07-23General construction708 MAPLE STREETProvide new foundation, structural frame & aluminum stair to access the Press Box.$22,200
B01147123-I1-ST2025-07-23General construction708 MAPLE STREETProvide new foundation, structural frame & aluminum stair to access the Press Box.$22,200
B01147123-I1-FO2025-07-23General construction708 MAPLE STREETProvide new foundation, structural frame & aluminum stair to access the Press Box.$22,200
B01053717-I1-GC2025-06-05General construction220 IRVING AVENUEConstruct new gender neutral accessible staff bathroom on third floor.$12,740
B01053717-S2-MS2025-06-05Mechanical / HVAC220 IRVING AVENUEInstalling New Exhaust Fan by Loren Cook in New Staff Bathroom on 3rd Floor.$10,000
B01143895-I1-GC2025-03-10General construction65 COURT STREETREMOVE EXISTING PAR WALLS AND RAISED FLOOR IN THE DATA CENTER. MODIFY DOOR AND RAISE FLOOR OF THE DATA ROOM. INSTALL NEW FINISHES, NEW CLOSET AND NEW SOFFIT. INSTALL DRINKING FOUNT$160,500
B01143895-S1-MS2025-03-10Mechanical / HVAC65 COURT STREETRemove all existing ductwork associated with 13th floor old data center non-functioning AHU, the old data center is now converted to new office space. Install 6 new indoor units f$120,000
B01027212-I1-GC2024-06-06General construction2839 BEDFORD AVENUEINSTALL SIX (5) SPLIT AC SYSTEMS TO SERVE GYMNASIUM AREAS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$293,000
B01027212-I1-GC2024-06-06Mechanical / HVAC2839 BEDFORD AVENUEINSTALL SIX (5) SPLIT AC SYSTEMS TO SERVE GYMNASIUM AREAS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$293,000
B01027212-I1-MS2024-06-06General construction2839 BEDFORD AVENUEINSTALL SIX (5) SPLIT AC SYSTEMS TO SERVE GYMNASIUM AREAS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$293,000
B01027212-I1-MS2024-06-06Mechanical / HVAC2839 BEDFORD AVENUEINSTALL SIX (5) SPLIT AC SYSTEMS TO SERVE GYMNASIUM AREAS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$293,000
B01030750-I1-GC2024-06-06Mechanical / HVAC5800 20 AVENUEINSTALLATION OF VARIOUS HEAT-PUMP SYSTEM FOR THE CAFETERIA AND GYMNASIUM AREAS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$640,000
B01030750-I1-GC2024-06-06General construction5800 20 AVENUEINSTALLATION OF VARIOUS HEAT-PUMP SYSTEM FOR THE CAFETERIA AND GYMNASIUM AREAS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$640,000
B01030750-I1-MS2024-06-06General construction5800 20 AVENUEINSTALLATION OF VARIOUS HEAT-PUMP SYSTEM FOR THE CAFETERIA AND GYMNASIUM AREAS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$640,000
B01030750-I1-MS2024-06-06Mechanical / HVAC5800 20 AVENUEINSTALLATION OF VARIOUS HEAT-PUMP SYSTEM FOR THE CAFETERIA AND GYMNASIUM AREAS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$640,000
B00995112-I1-GC2024-06-05Mechanical / HVAC8010 12 AVENUEINSTALL VARIOUS SPLIT DUCTLESS AC SYSTEMS TO SERVE THE 3RD AND 5TH FLOOR GYM AREA AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$355,000
B00995112-I1-GC2024-06-05General construction8010 12 AVENUEINSTALL VARIOUS SPLIT DUCTLESS AC SYSTEMS TO SERVE THE 3RD AND 5TH FLOOR GYM AREA AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$355,000
B00995112-I1-MS2024-06-05Mechanical / HVAC8010 12 AVENUEINSTALL VARIOUS SPLIT DUCTLESS AC SYSTEMS TO SERVE THE 3RD AND 5TH FLOOR GYM AREA AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$355,000
B00995112-I1-MS2024-06-05General construction8010 12 AVENUEINSTALL VARIOUS SPLIT DUCTLESS AC SYSTEMS TO SERVE THE 3RD AND 5TH FLOOR GYM AREA AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$355,000
B00696098-I1-GC2023-09-06General construction355 PARK PLACENEW EXTERIOR ADA RAMP, CONCRETE STEPS AND CONCRETE PAVEMENT AT EXIT 1; ENLARGE ENTRANCE VESTIBULE WITH NEW CONCRETE STAIR, FIRE RATED WALL AND INCLINE STAIR LIFT; CONSTUCT NEW CONC$247,000
B00696098-I1-FO2023-09-06General construction355 PARK PLACENEW EXTERIOR ADA RAMP, CONCRETE STEPS AND CONCRETE PAVEMENT AT EXIT 1; ENLARGE ENTRANCE VESTIBULE WITH NEW CONCRETE STAIR, FIRE RATED WALL AND INCLINE STAIR LIFT; CONSTUCT NEW CONC$247,000
B00696098-I1-ST2023-09-06General construction355 PARK PLACENEW EXTERIOR ADA RAMP, CONCRETE STEPS AND CONCRETE PAVEMENT AT EXIT 1; ENLARGE ENTRANCE VESTIBULE WITH NEW CONCRETE STAIR, FIRE RATED WALL AND INCLINE STAIR LIFT; CONSTUCT NEW CONC$247,000
B00610750-I1-GC2023-08-30General construction1390 WILLOUGHBY AVENUERenovation of existing auditorium, including replacement of stage, auditorium seating, doors, and finishes. Installation of new lightweight concrete at floor slab as needed to prov$549,500
B00610750-I1-ST2023-08-30General construction1390 WILLOUGHBY AVENUERenovation of existing auditorium, including replacement of stage, auditorium seating, doors, and finishes. Installation of new lightweight concrete at floor slab as needed to prov$549,500
B07997159-I1-FO2023-07-14General construction850 GRAND STREETREMOVAL OF GOAL POSTS, NETTING, CONCRETE SLABS, FENCE, BACKSTOPS, AND SCOREBOARD. NEW GOAL POSTS, NETTING, CONCRETE SLABS, SUNKEN CONCRETE DUGOUTS WITH FOUNDATIONS, GRANDSTANDS, FE$1,499,500
B07997159-I1-GC2023-07-14General construction850 GRAND STREETREMOVAL OF GOAL POSTS, NETTING, CONCRETE SLABS, FENCE, BACKSTOPS, AND SCOREBOARD. NEW GOAL POSTS, NETTING, CONCRETE SLABS, SUNKEN CONCRETE DUGOUTS WITH FOUNDATIONS, GRANDSTANDS, FE$1,499,500
B07997159-I1-ST2023-07-14General construction850 GRAND STREETREMOVAL OF GOAL POSTS, NETTING, CONCRETE SLABS, FENCE, BACKSTOPS, AND SCOREBOARD. NEW GOAL POSTS, NETTING, CONCRETE SLABS, SUNKEN CONCRETE DUGOUTS WITH FOUNDATIONS, GRANDSTANDS, FE$1,499,500
B08031763-I1-MS2023-05-17Mechanical / HVAC125 COVERT STREETDEMO EXISTING NON-RATED NON-BEARING WALLS BETWEEN 207 & 209, & BETWEEN 229 & 229A. DEMO EXISTING CEILINGS, LIGHTING, MILLWORK, & FLOORING FINISHES. INSTALL NEW WALLS TO RECONFIGURE$330,000
B08031763-I1-GC2023-05-17General construction125 COVERT STREETDEMO EXISTING NON-RATED NON-BEARING WALLS BETWEEN 207 & 209, & BETWEEN 229 & 229A. DEMO EXISTING CEILINGS, LIGHTING, MILLWORK, & FLOORING FINISHES. INSTALL NEW WALLS TO RECONFIGURE$330,000
B08031763-I1-GC2023-05-17Mechanical / HVAC125 COVERT STREETDEMO EXISTING NON-RATED NON-BEARING WALLS BETWEEN 207 & 209, & BETWEEN 229 & 229A. DEMO EXISTING CEILINGS, LIGHTING, MILLWORK, & FLOORING FINISHES. INSTALL NEW WALLS TO RECONFIGURE$330,000
B08031763-I1-MS2023-05-17General construction125 COVERT STREETDEMO EXISTING NON-RATED NON-BEARING WALLS BETWEEN 207 & 209, & BETWEEN 229 & 229A. DEMO EXISTING CEILINGS, LIGHTING, MILLWORK, & FLOORING FINISHES. INSTALL NEW WALLS TO RECONFIGURE$330,000
B00593215-I1-GC2023-01-11General construction544 7 AVENUEREPLACE EXISTING AUDITORIUM FLOORING WITH NEW VINYL FLOORING TILE FOR ADA COMPLIANCE AND REPLACE EXISTING THRESHOLD AT STAGE DOOR.$14,600
B00591785-I1-GC2022-11-16General construction161 VARICK AVENUEInstall rapidauto cooling roll down doors on eterior side of garage doors. Replace exterior bockwork as needed for installation of doors. Replace bollards. No change to use egre$705,244
B00771971-I1-GC2022-10-13General construction2035 NOSTRAND AVENUEFILING FOR FACADE REPAIR OF THE BRICK WALL AND REFINISHING WITH NEW BRICKS AT EXISTING PLANTER. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$97,552
B00650342-I1-MS2022-09-21General construction605 SHEPHERD AVENUEDEMOLITION OF INTERIOR PARTITION. REPLACE EXISTING FLOORING & BASE. REPLACE EXISTING SINK & CABINETS. PAINT EXISTING WALLS, DOORS, & FRAMES. INSTALL NEW AC SYSTEM AND DUCTWORK. INS$91,300
B00650342-I1-MS2022-09-21Mechanical / HVAC605 SHEPHERD AVENUEDEMOLITION OF INTERIOR PARTITION. REPLACE EXISTING FLOORING & BASE. REPLACE EXISTING SINK & CABINETS. PAINT EXISTING WALLS, DOORS, & FRAMES. INSTALL NEW AC SYSTEM AND DUCTWORK. INS$91,300
B00650342-I1-GC2022-08-24Mechanical / HVAC605 SHEPHERD AVENUEDEMOLITION OF INTERIOR PARTITION. REPLACE EXISTING FLOORING & BASE. REPLACE EXISTING SINK & CABINETS. PAINT EXISTING WALLS, DOORS, & FRAMES. INSTALL NEW AC SYSTEM AND DUCTWORK. INS$91,300
B00650342-I1-GC2022-08-24General construction605 SHEPHERD AVENUEDEMOLITION OF INTERIOR PARTITION. REPLACE EXISTING FLOORING & BASE. REPLACE EXISTING SINK & CABINETS. PAINT EXISTING WALLS, DOORS, & FRAMES. INSTALL NEW AC SYSTEM AND DUCTWORK. INS$91,300
B00696014-I1-GC2022-06-07Mechanical / HVAC65 COURT STREETREMOVE EXISTING FENCE, CEILING TILES, AND GRID. INSTALL NEW WALLS, PEDESTAL FLOOR SYSTEM AND CEILING TILES. REMOVE EXISTING COMPUTER ROOM AIR CONDITIONING UNITS AND INSTALL NEW SPL$129,000
B00696014-I1-GC2022-06-07General construction65 COURT STREETREMOVE EXISTING FENCE, CEILING TILES, AND GRID. INSTALL NEW WALLS, PEDESTAL FLOOR SYSTEM AND CEILING TILES. REMOVE EXISTING COMPUTER ROOM AIR CONDITIONING UNITS AND INSTALL NEW SPL$129,000
B00530342-I1-MS2022-02-17Mechanical / HVAC8301 SHORE ROADINTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, DOORS, MILLWORK, AND PLUMBING FIXTURES. INSTALL NEW PARTITIONS AND DOORS. INSTALL NEW SINK IN EXISTING LOCATION. PROVIDE AND INSTAL$121,000
B00530342-I1-MS2022-02-17General construction8301 SHORE ROADINTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, DOORS, MILLWORK, AND PLUMBING FIXTURES. INSTALL NEW PARTITIONS AND DOORS. INSTALL NEW SINK IN EXISTING LOCATION. PROVIDE AND INSTAL$121,000
B00530342-I1-GC2022-02-16Mechanical / HVAC8301 SHORE ROADINTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, DOORS, MILLWORK, AND PLUMBING FIXTURES. INSTALL NEW PARTITIONS AND DOORS. INSTALL NEW SINK IN EXISTING LOCATION. PROVIDE AND INSTAL$121,000
B00530342-I1-GC2022-02-16General construction8301 SHORE ROADINTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, DOORS, MILLWORK, AND PLUMBING FIXTURES. INSTALL NEW PARTITIONS AND DOORS. INSTALL NEW SINK IN EXISTING LOCATION. PROVIDE AND INSTAL$121,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →